NORWELL

Operated by TIDAL PETROLEUM, INC. (P-5 859240) in the TULETA field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 8414District 02Field 91677001OilCasinghead gasSaveExport
Value, all time
$3.7 M
Oct 1998 – Aug 2004
Value, last 12 filed months
$35 k
at the published price for each month
Months reported
71
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 13 leases and 21 wells, and the rule below applies to all of them.

Discovered
1932-12-31
as the register files it
Field class
Oil and gas
the register's own label
Between wells
660 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 10 acres. The field rule took effect on 1986-06-01.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition137,475 bbl$3,249,650
Casinghead gasProduction117,021 Mcf$460,123
Total$3,709,773

Wells on this lease (3)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 28.5707, -97.7794. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.2 miles.

28.57099, -97.77936 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
3 of 3 wells
With a plug date
100.0%
3 of 3 wells
Median depth
4,400 ft
3 wells filed one
Completion to plug
4.3 years
median over 3 wells

What the state filed about each well

On the RRC proration schedule
3100.0%
A plug date is filed
3100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
3100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

Between 4,330 and 4,400 ft, median 4,400 ft, over the 3 wells that filed a depth.

Completions filed
May 1999 – Dec 2000
3 of 3 wells
Plug dates filed
Jan 2002 – Jul 2004
3 of 3 wells

Last completion to plug: a median of 4.3 years across the 3 wells that filed both dates, with the middle half between 2.7 years and 4.8 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

3 wells

42-0253291824,400 ftDec 2000Jan 2002Yes
42-0253295954,330 ftAug 1999Nov 2003Yes
42-0253294844,400 ftMay 1999Jul 2004Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (71)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

71 months

Aug 20040042.375.55$0
Jul 20040038.286.08$0
Jun 20040036.106.43$0
May 20040037.486.49$0
Apr 20040034.475.86$0
Mar 20040034.365.53$0
Feb 200470032.455.51$2,272
Jan 20042032.036.30$64
Dec 2003271030.266.30$8,200
Nov 2003179028.804.60$5,155
Oct 2003346028.174.76$9,747
Sep 2003360026.314.75$9,472
Aug 2003871029.765.13$25,921
Jul 2003350029.415.17$10,294
Jun 2003535028.565.98$15,280
May 2003500026.595.97$13,295
Apr 2003649026.675.41$17,309
Mar 2003878031.146.10$27,341
Feb 2003728033.487.93$24,373
Jan 2003894030.315.58$27,097
Dec 2002910026.914.85$24,488
Nov 2002726024.664.14$17,903
Oct 20021,259026.464.23$33,313
Sep 2002883027.443.64$24,230
Aug 2002694025.963.16$18,016
Jul 20021,413024.583.06$34,732
Jun 20021,977023.733.34$46,914
May 20021,977024.663.58$48,753
Apr 20021,99374523.653.51$49,751
Mar 20022,37165522.003.10$54,194
Feb 20022,19589518.222.38$42,119
Jan 20021,6441,09017.172.38$30,817
Dec 20011,8041,15616.932.36$33,275
Nov 20011,4591,25318.072.41$29,378
Oct 20011,8101,61819.782.53$39,894
Sep 20011,6161,26724.262.25$42,057
Aug 20011,6881,79624.873.05$47,464
Jul 20011,9451,92223.933.20$52,689
Jun 20011,6201,69124.563.82$46,254
May 20011,9861,81925.524.31$58,518
Apr 20012,1712,04824.685.34$64,507
Mar 20012,1901,77424.545.38$63,280
Feb 20011,8062,39627.755.77$63,934
Jan 20012,0132,71827.478.40$78,125
Dec 20002,6335,02626.889.12$116,625
Nov 20003,2444,47432.215.66$129,803
Oct 20002,8863,85131.235.15$109,945
Sep 20003,0883,96231.875.19$118,963
Aug 20003,2845,37229.644.54$121,731
Jul 20004,0397,56228.534.09$146,159
Jun 20003,9668,25129.304.40$152,486
May 20004,08310,35327.263.68$149,399
Apr 20004,6697,72124.513.12$138,496
Mar 20004,5294,08028.422.86$140,382
Feb 20004,4062,74727.622.73$129,183
Jan 20004,3152,78125.272.48$115,938
Dec 19994,0622,82324.282.42$105,468
Nov 19995,6323,74523.192.43$139,721
Oct 19995,9503,88820.982.80$135,732
Sep 19995,9224,00421.752.62$139,289
Aug 19993,7332,17419.262.88$78,149
Jul 19993,2441,73517.892.37$62,151
Jun 19993,7111,25315.942.36$62,113
May 19992,8121,73715.792.32$48,433
Apr 19992,2381,23815.102.21$36,527
Mar 19991,80886812.471.84$24,141
Feb 19991,8118399.981.82$19,599
Jan 19991,95095310.381.90$22,052
Dec 19982,1357319.201.77$20,938
Nov 19985421010.892.19$5,924
Oct 19980012.421.97$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Feb 2004 — as filed, then multipliedworked
Oil                   70 bbl  × $ 32.45 =     $2,272
Casinghead gas         0 Mcf  × $  5.51 =         $0

────────────────────────────────────────────────────
Month total                                   $2,272

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 02/O/8414 is the state's own key, not one this site invented.