ROOKE

Operated by RODESSA OPERATING COMPANY (P-5 723592) in the LA ROSA (CONSOLIDATED, OIL) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 8672District 02Field 50975100OilCasinghead gasSaveExport
Value, all time
$544 k
Oct 2001 – Aug 2009
Value, last 12 filed months
$12 k
at the published price for each month
Months reported
95
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 12 leases and 55 wells, and the rule below applies to all of them.

Discovered
1995-01-01
as the register files it
Field class
Oil
the register's own label
Between wells
467 ft
minimum
From a lease line
233 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 1994-11-21.

The Commission's schedule remark for this field reads: ENTITY FOR DENSITY FOR F.B. ROOKE, J. W. SPAUDDING 160 ACRE,

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition13,061 bbl$535,440
Casinghead gasProduction2,669 Mcf$8,208
Total$543,648

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 28.1623, -97.3250. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

28.16228, -97.32495 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
6,060 ft
1 wells filed one
Completion to plug
7.7 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,060 ft.

Completions filed
Oct 2001
1 of 1 wells
Plug dates filed
Jun 2009
1 of 1 wells

Last completion to plug: a median of 7.7 years across the 1 well that filed both dates, with the middle half between 7.7 years and 7.7 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-391324295A6,060 ftOct 2001Jun 2009Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (95)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

95 months

Aug 20090067.423.22$0
Jul 20090061.133.46$0
Jun 20090066.163.90$0
May 20090054.743.93$0
Apr 20090046.773.59$0
Mar 20090042.144.06$0
Feb 20090032.814.63$0
Jan 2009168035.865.37$6,024
Dec 2008148037.105.98$5,491
Nov 20080555.496.86$34
Oct 20080575.246.92$35
Sep 200805101.767.88$39
Aug 200805114.228.48$42
Jul 200805131.0811.39$57
Jun 200805131.3313.03$65
May 20081725123.1711.57$21,243
Apr 20081765110.3110.45$19,467
Mar 20081695101.909.66$17,269
Feb 2008161392.538.77$14,924
Jan 20080390.388.21$25
Dec 2007171388.337.30$15,126
Nov 2007173091.677.29$15,859
Oct 20070382.856.92$21
Sep 20070375.846.24$19
Aug 20070369.066.39$19
Jul 20070370.906.39$19
Jun 20070362.007.55$23
May 20070558.747.85$39
Apr 2007173559.617.81$10,352
Mar 20070556.927.30$37
Feb 2007333355.108.22$18,373
Jan 20070350.306.73$20
Dec 2006325356.656.92$18,432
Nov 2006179354.207.62$9,725
Oct 20060354.906.01$18
Sep 20060360.085.04$15
Aug 2006154368.717.34$10,603
Jul 20060369.376.34$19
Jun 20060366.286.38$19
May 2006173366.016.42$11,439
Apr 2006178364.397.36$11,484
Mar 2006179356.707.08$10,171
Feb 2006150357.597.75$8,662
Jan 20060360.598.93$27
Dec 2005173554.9413.42$9,572
Nov 2005171554.6910.59$9,405
Oct 20050558.3413.80$69
Sep 2005154561.4512.08$9,524
Aug 2005169561.519.80$10,444
Jul 2005153555.697.84$8,560
Jun 2005151552.337.38$7,939
May 2005181545.226.65$8,218
Apr 2005161549.207.36$7,958
Mar 2005169550.377.15$8,548
Feb 20050545.226.31$32
Jan 2005165543.166.32$7,153
Dec 2004176539.866.75$7,049
Nov 20040545.286.33$32
Oct 2004346549.706.52$17,229
Sep 2004163443.245.28$7,069
Aug 2004168442.375.55$7,140
Jul 2004156438.286.08$5,996
Jun 2004332436.106.43$12,011
May 2004336437.486.49$12,619
Apr 20040434.475.86$23
Mar 2004171434.365.53$5,898
Feb 20040432.455.51$22
Jan 20040432.036.30$25
Dec 20030430.266.30$25
Nov 20030428.804.60$18
Oct 2003173428.174.76$4,892
Sep 20030426.314.75$19
Aug 2003180429.765.13$5,377
Jul 2003164429.415.17$4,844
Jun 2003172428.565.98$4,936
May 20030426.595.97$24
Apr 2003180426.675.41$4,822
Mar 2003169431.146.10$5,287
Feb 20030433.487.93$32
Jan 2003344430.315.58$10,449
Dec 2002157426.914.85$4,244
Nov 2002280424.664.14$6,921
Oct 2002158426.464.23$4,198
Sep 2002150427.443.64$4,131
Aug 2002154425.963.16$4,011
Jul 2002347424.583.06$8,542
Jun 2002439423.733.34$10,431
May 2002348424.663.58$8,596
Apr 2002647223.653.51$15,309
Mar 2002352422.003.10$7,756
Feb 2002790418.222.38$14,403
Jan 2002846517.172.38$14,538
Dec 2001155516.932.36$2,636
Nov 20010518.072.41$12
Oct 20011792,32719.782.53$9,425

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jan 2009 — as filed, then multipliedworked
Oil                  168 bbl  × $ 35.86 =     $6,024
Casinghead gas         0 Mcf  × $  5.37 =         $0

────────────────────────────────────────────────────
Month total                                   $6,024

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 02/O/8672 is the state's own key, not one this site invented.