CULLI

Operated by WELDERXP LTD. (P-5 907320) in the SINGLETON, E. (HOCKLEY) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 9190District 02Field 83740300OilSaveExport
Value, all time
$3.1 M
Feb 2008 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
220
no gaps in the span
Streams
1
oil

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 7 leases and 7 wells, and the rule below applies to all of them.

Discovered
1979-03-11
as the register files it
Field class
Oil and gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

The Commission's schedule remark for this field reads: ALLOCATION FORMULA EFF. 5-1-80 PER AMENDMENT TO SWR 28 & 29

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition36,513 bbl$3,136,363
Total$3,136,363

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 28.4178, -97.8758. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

28.41780, -97.87582 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
4,108 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 4,108 ft.

Completions filed
Jun 2007
1 of 1 wells

1 well

42-0253348114,108 ftJun 2007

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (220)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

220 months

May 20260106.413.05$0
Apr 2026098.932.87$0
Mar 2026089.753.15$0
Feb 2026063.503.75$0
Jan 2026059.138.00$0
Dec 2025056.664.41$0
Nov 2025058.593.93$0
Oct 2025059.383.30$0
Sep 2025062.743.08$0
Aug 2025063.933.01$0
Jul 2025066.743.32$0
Jun 2025066.483.13$0
May 2025060.553.23$0
Apr 2025062.363.54$0
Mar 2025067.704.27$0
Feb 2025070.884.34$0
Jan 2025074.324.28$0
Dec 2024068.993.12$0
Nov 2024069.052.20$0
Oct 2024071.372.28$0
Sep 2024069.612.36$0
Aug 2024075.632.06$0
Jul 2024079.932.15$0
Jun 2024078.082.63$0
May 2024078.812.20$0
Apr 2024084.451.66$0
Mar 2024080.301.55$0
Feb 2024076.091.78$0
Jan 2024073.023.30$0
Dec 2023071.262.61$0
Nov 2023077.892.81$0
Oct 2023085.443.09$0
Sep 2023089.042.74$0
Aug 2023080.522.67$0
Jul 2023074.852.64$0
Jun 2023068.962.26$0
May 2023070.622.23$0
Apr 2023078.122.24$0
Mar 2023072.852.39$0
Feb 2023075.112.47$0
Jan 2023076.533.39$0
Dec 2022076.415.73$0
Nov 2022085.005.65$0
Oct 2022087.185.86$0
Sep 2022084.888.16$0
Aug 2022094.529.13$0
Jul 20220101.587.54$0
Jun 20220115.097.98$0
May 20220109.378.43$0
Apr 20220104.226.84$0
Mar 20220108.885.08$0
Feb 2022091.054.86$0
Jan 2022081.844.54$0
Dec 2021071.323.90$0
Nov 2021077.435.24$0
Oct 2021079.795.71$0
Sep 2021069.865.35$0
Aug 2021066.024.22$0
Jul 2021070.783.98$0
Jun 2021069.493.38$0
May 2021063.483.02$0
Apr 2021060.362.76$0
Mar 2021061.302.72$0
Feb 2021057.805.55$0
Jan 2021050.412.81$0
Dec 2020044.642.68$0
Nov 2020038.772.71$0
Oct 2020036.972.48$0
Sep 2020037.091.99$0
Aug 2020039.982.39$0
Jul 2020038.371.83$0
Jun 2020034.901.69$0
May 2020016.921.81$0
Apr 2020014.751.80$0
Mar 2020030.341.86$0
Feb 2020049.881.98$0
Jan 2020057.252.09$0
Dec 2019059.012.30$0
Nov 2019055.302.75$0
Oct 2019053.472.42$0
Sep 2019055.052.66$0
Aug 2019053.112.30$0
Jul 2019056.272.46$0
Jun 2019052.782.49$0
May 2019058.482.74$0
Apr 2019062.632.75$0
Mar 2019056.803.06$0
Feb 2019050.852.79$0
Jan 2019046.033.23$0
Dec 2018046.594.19$0
Nov 20184452.934.24$2,329
Oct 2018061.443.40$0
Sep 2018059.543.11$0
Aug 2018059.403.07$0
Jul 2018065.142.93$0
Jun 2018060.183.08$0
May 2018065.382.90$0
Apr 2018063.842.90$0
Mar 2018061.222.79$0
Feb 2018061.782.77$0
Jan 2018062.874.01$0
Dec 2017057.272.92$0
Nov 2017055.423.12$0
Oct 2017049.292.98$0
Sep 2017047.523.09$0
Aug 2017045.373.00$0
Jul 2017043.873.09$0
Jun 2017042.493.09$0
May 2017045.373.26$0
Apr 2017047.933.21$0
Mar 2017046.772.98$0
Feb 2017050.452.95$0
Jan 2017049.413.42$0
Dec 2016048.763.72$0
Nov 2016042.492.64$0
Oct 2016046.193.09$0
Sep 2016041.553.10$0
Aug 2016041.442.92$0
Jul 2016041.622.92$0
Jun 2016045.352.69$0
May 201613242.521.99$5,613
Apr 2016036.561.99$0
Mar 2016033.011.79$0
Feb 2016026.472.06$0
Jan 2016027.352.36$0
Dec 201515932.362.00$5,145
Nov 2015038.792.17$0
Oct 201516043.552.43$6,968
Sep 2015042.992.76$0
Aug 201516540.162.87$6,626
Jul 20155548.152.95$2,648
Jun 201516656.152.88$9,321
May 201516455.212.96$9,054
Apr 201516549.822.71$8,220
Mar 201516042.892.93$6,862
Feb 2015044.662.98$0
Jan 201515843.433.10$6,862
Dec 201416254.693.59$8,860
Nov 2014070.464.25$0
Oct 201415678.303.90$12,215
Sep 201416186.164.05$13,872
Aug 201416089.394.04$14,302
Jul 201415996.564.18$15,353
Jun 201416198.164.74$15,804
May 2014094.734.73$0
Apr 201416095.944.81$15,350
Mar 201417195.895.06$16,397
Feb 201416897.406.19$16,363
Jan 201416990.404.86$15,278
Dec 2013091.824.35$0
Nov 201316888.853.74$14,927
Oct 201316797.423.78$16,269
Sep 2013171104.113.72$17,803
Aug 20130104.253.52$0
Jul 20130102.523.72$0
Jun 201317694.403.93$16,614
May 201317094.834.15$16,121
Apr 2013093.964.28$0
Mar 201317693.623.91$16,477
Feb 201318291.233.42$16,604
Jan 201318291.603.42$16,671
Dec 201215686.773.42$13,536
Nov 2012086.953.62$0
Oct 201236889.383.40$32,892
Sep 201217894.672.92$16,851
Aug 201217292.662.91$15,938
Jul 2012085.133.02$0
Jun 201232879.822.52$26,181
May 2012091.612.49$0
Apr 2012182101.652.00$18,500
Mar 2012172105.052.22$18,069
Feb 2012167101.102.57$16,884
Jan 201216098.092.73$15,694
Dec 201125696.873.24$24,799
Nov 2011095.723.31$0
Oct 201134184.983.65$28,978
Sep 201117383.623.99$14,466
Aug 201117083.404.15$14,178
Jul 201134794.144.52$32,667
Jun 201114092.904.64$13,006
May 201134798.134.40$34,051
Apr 2011342105.964.33$36,238
Mar 201134396.364.06$33,051
Feb 2011085.644.18$0
Jan 201137086.504.59$32,005
Dec 201018685.734.35$15,946
Nov 201018080.843.80$14,551
Oct 201035478.103.51$27,647
Sep 201035072.633.98$25,421
Aug 201036273.684.42$26,672
Jul 201018472.554.74$13,349
Jun 201053270.364.91$37,432
May 201035571.124.24$25,248
Apr 201033281.694.12$27,121
Mar 201052878.394.39$41,390
Feb 201036373.585.44$26,710
Jan 201034674.365.96$25,729
Dec 200950171.445.48$35,791
Nov 200949174.593.75$36,624
Oct 200963172.544.11$45,773
Sep 200951765.543.06$33,884
Aug 200934067.423.22$22,923
Jul 200970661.133.46$43,158
Jun 200951366.163.90$33,940
May 200963954.743.93$34,979
Apr 200967646.773.59$31,617
Mar 200953142.144.06$22,376
Feb 200984232.814.63$27,626
Jan 200983535.865.37$29,943
Dec 20081,05737.105.98$39,215
Nov 200899555.496.86$55,213
Oct 20081,16875.246.92$87,880
Sep 20081,328101.767.88$135,137
Aug 20081,589114.228.48$181,496
Jul 20081,752131.0811.39$229,652
Jun 20081,899131.3313.03$249,396
May 20082,119123.1711.57$260,997
Apr 20081,005110.3110.45$110,862
Mar 20081,678101.909.66$170,988
Feb 20081,37092.538.77$126,766

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Nov 2018 — as filed, then multipliedworked
Oil                   44 bbl  × $ 52.93 =     $2,329

────────────────────────────────────────────────────
Month total                                   $2,329

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 02/O/9190 is the state's own key, not one this site invented.