Operated by ALEGRE ENERGY, INC. (P-5 11441) in the CHENANGO (8000) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 127088District 03Field 17418100NGPA filingCondensateGasSaveExport
Value, all time
$106 k
Jan 1993 – May 2006
Value, last 12 filed months
$5 k
at the published price for each month
Months reported
161
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 2 leases and 2 wells, and the rule below applies to all of them.

Discovered
1961-10-08
as the register files it
Field class
Gas
the register's own label
Between wells
933 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 160 acres.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition417 bbl$10,488
GasProduction39,449 Mcf$95,320
Total$105,808

8,713 Mcf of this lease's gas, across 18 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 29.2286, -95.4768. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

29.22863, -95.47683 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
9,028 ft
1 wells filed one
Completion to plug
15.8 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 9,028 ft.

Completions filed
Mar 1990
1 of 1 wells
Plug dates filed
Dec 2005
1 of 1 wells

Last completion to plug: a median of 15.8 years across the 1 well that filed both dates, with the middle half between 15.8 years and 15.8 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-0393211419,028 ftMar 1990Dec 2005Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (161)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

161 months

May 20060066.016.42$0
Apr 20060064.397.36$0
Mar 200680056.707.08$4,536
Feb 20060057.597.75$0
Jan 20060060.598.93$0
Dec 20050054.9413.42$0
Nov 20050054.6910.59$0
Oct 20050058.3413.80$0
Sep 20050061.4512.08$0
Aug 20050061.519.80$0
Jul 20050055.697.84$0
Jun 20050052.337.38$0
May 20050045.226.65$0
Apr 20050049.207.36$0
Mar 20050850.377.15$57
Feb 2005011945.226.31$751
Jan 200501443.166.32$89
Dec 200401739.866.75$115
Nov 200408145.286.33$513
Oct 200409649.706.52$625
Sep 200401643.245.28$85
Aug 200407842.375.55$433
Jul 200407038.286.08$426
Jun 2004014436.106.43$926
May 200409137.486.49$591
Apr 200406634.475.86$387
Mar 2004018434.365.53$1,018
Feb 200408032.455.51$441
Jan 20040032.036.30$0
Dec 20030230.266.30$13
Nov 20030028.804.60$0
Oct 20030028.174.76$0
Sep 20030026.314.75$0
Aug 20030029.765.13$0
Jul 20030029.415.17$0
Jun 200303128.565.98$185
May 2003013426.595.97$800
Apr 2003023126.675.41$1,249
Mar 2003014831.146.10$902
Feb 2003010933.487.93$864
Jan 2003030130.315.58$1,680
Dec 2002025826.914.85$1,252
Nov 2002030224.664.14$1,249
Oct 2002026326.464.23$1,112
Sep 2002027727.443.64$1,007
Aug 2002018025.963.16$570
Jul 2002021724.583.06$664
Jun 2002033523.733.34$1,118
May 2002040724.663.58$1,459
Apr 2002052423.653.51$1,840
Mar 2002062822.003.10$1,949
Feb 2002023618.222.38$561
Jan 2002013417.172.38$318
Dec 20010016.932.36$0
Nov 2001012418.072.41$298
Oct 200106819.782.53$172
Sep 200103224.262.25$72
Aug 2001012324.873.05$376
Jul 2001012123.933.20$387
Jun 200105524.563.82$210
May 2001024025.524.31$1,034
Apr 2001029224.685.34$1,558
Mar 20012428524.545.38$2,121
Feb 2001023527.755.77$1,355
Jan 200106527.478.40$546
Dec 2000064026.889.12$5,838
Nov 2000020132.215.66$1,137
Oct 2000041131.235.15$2,115
Sep 2000018131.875.19$939
Aug 2000020129.644.54$913
Jul 200006928.534.09$282
Jun 2000035829.304.40$1,574
May 2000013827.263.68$508
Apr 2000016224.513.12$505
Mar 2000014928.422.86$426
Feb 2000016327.622.73$444
Jan 200008925.272.48$221
Dec 1999032924.282.42$797
Nov 1999069823.192.43$1,699
Oct 1999060320.982.80$1,691
Sep 1999055521.752.62$1,453
Aug 1999052719.262.88$1,515
Jul 1999059317.892.37$1,407
Jun 1999045815.942.36$1,082
May 1999071515.792.32$1,660
Apr 1999040815.102.21$901
Mar 1999035912.471.84$660
Feb 199904599.981.82$834
Jan 1999028010.381.90$532
Dec 199804409.201.77$780
Nov 1998084910.892.19$1,856
Oct 1998085712.421.97$1,688
Sep 199806312.592.08$131
Aug 1998064211.301.91$1,225
Jul 1998070911.742.24$1,586
Jun 1998052811.242.24$1,181
May 1998067212.622.21$1,483
Apr 1998036713.042.51$919
Mar 1998080812.802.31$1,866
Feb 19980913.952.30$21
Jan 1998050714.702.15$1,092
Dec 1997066516.322.41$1,603
Nov 1997060018.193.09$1,853
Oct 19970519.253.15$16
Sep 1997015717.742.95$464
Aug 1997052817.862.55$1,349
Jul 1997078717.582.25$1,768
Jun 1997015917.242.26$359
May 19970018.972.31$0
Apr 1997019717.882.08$410
Mar 199701,43018.951.94$2,773
Feb 199702,79920.492.21$6,174
Jan 1997079123.483.54$2,800
Dec 19960023.32$0
Nov 19960021.97$0
Oct 19960023.31$0
Sep 19960022.22$0
Aug 19960020.26$0
Jul 19960019.55$0
Jun 19960018.73$0
May 19960019.43$0
Apr 19960021.51$0
Mar 19960019.38$0
Feb 19960016.98$0
Jan 19960017.07$0
Dec 19950017.19$0
Nov 199549016.00$784
Oct 19950015.43$0
Sep 19950016.18$0
Aug 19950015.92$0
Jul 19950015.24$0
Jun 199570016.41$1,149
May 1995010117.56$0
Apr 1995048417.73$0
Mar 1995066516.44$0
Feb 1995011816.58$0
Jan 199501415.92$0
Dec 19940015.03$0
Nov 19940015.90$0
Oct 19940015.58$0
Sep 19940015.29$0
Aug 19940016.13$0
Jul 19940017.56$0
Jun 19940017.09$0
May 19940015.88$0
Apr 19940014.14$0
Mar 1994016212.46$0
Feb 1994047912.50$0
Jan 19940012.66$0
Dec 199307912.33$0
Nov 1993054614.49$0
Oct 19930015.85$0
Sep 1993052915.03$0
Aug 1993075115.66$0
Jul 1993055215.46$0
Jun 1993053816.79$0
May 19931941,25817.68$3,430
Apr 1993048518.05$0
Mar 1993044018.14$0
Feb 1993095017.90$0
Jan 1993056216.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Mar 2006 — as filed, then multipliedworked
Condensate            80 bbl  × $ 56.70 =     $4,536
Gas                    0 Mcf  × $  7.08 =         $0

────────────────────────────────────────────────────
Month total                                   $4,536

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 03/G/127088 is the state's own key, not one this site invented.