VAVRA

Operated by WCS OIL AND GAS CORPORATION (P-5 902626) in the HOOKER CREEK (NAVARRO A) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 131258District 03Field 42493500GasSaveExport
Value, all time
$10 k
Jan 1993 – Feb 2002
Value, last 12 filed months
$0
at the published price for each month
Months reported
110
no gaps in the span
Streams
1
gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 195 leases and 261 wells, and the rule below applies to all of them.

Discovered
1980-07-29
as the register files it
Field class
Oil and gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
GasProduction21,557 Mcf$9,575
Total$9,575

17,416 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.3219, -96.8219. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.32187, -96.82193 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
5,438 ft
1 wells filed one
Completion to plug
12.1 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 5,438 ft.

Completions filed
Jun 1989
1 of 1 wells
Plug dates filed
Jul 2001
1 of 1 wells

Last completion to plug: a median of 12.1 years across the 1 well that filed both dates, with the middle half between 12.1 years and 12.1 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-2873224625,438 ftJun 1989Jul 2001Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (110)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

110 months

Feb 2002018.222.38$0
Jan 2002017.172.38$0
Dec 2001016.932.36$0
Nov 2001018.072.41$0
Oct 2001019.782.53$0
Sep 2001024.262.25$0
Aug 2001024.873.05$0
Jul 2001023.933.20$0
Jun 2001024.563.82$0
May 2001025.524.31$0
Apr 2001024.685.34$0
Mar 2001024.545.38$0
Feb 2001027.755.77$0
Jan 2001027.478.40$0
Dec 2000026.889.12$0
Nov 2000032.215.66$0
Oct 2000031.235.15$0
Sep 2000031.875.19$0
Aug 2000029.644.54$0
Jul 2000028.534.09$0
Jun 2000029.304.40$0
May 2000027.263.68$0
Apr 2000024.513.12$0
Mar 2000028.422.86$0
Feb 2000027.622.73$0
Jan 2000025.272.48$0
Dec 1999024.282.42$0
Nov 1999023.192.43$0
Oct 1999020.982.80$0
Sep 1999021.752.62$0
Aug 1999019.262.88$0
Jul 1999017.892.37$0
Jun 1999015.942.36$0
May 1999015.792.32$0
Apr 1999015.102.21$0
Mar 1999012.471.84$0
Feb 19991559.981.82$282
Jan 199911410.381.90$217
Dec 19981329.201.77$234
Nov 199815010.892.19$328
Oct 199820812.421.97$410
Sep 199816912.592.08$352
Aug 199819311.301.91$368
Jul 199818511.742.24$414
Jun 199818611.242.24$416
May 199811612.622.21$256
Apr 199816813.042.51$421
Mar 199813612.802.31$314
Feb 199812513.952.30$287
Jan 199816214.702.15$349
Dec 199718416.322.41$444
Nov 199715918.193.09$491
Oct 199711719.253.15$369
Sep 199710017.742.95$295
Aug 199715417.862.55$393
Jul 199720117.582.25$452
Jun 199716517.242.26$372
May 199716718.972.31$386
Apr 199714917.882.08$310
Mar 199718818.951.94$365
Feb 199716220.492.21$357
Jan 199719623.483.54$694
Dec 199616423.32$0
Nov 199619021.97$0
Oct 199621523.31$0
Sep 199618822.22$0
Aug 199619720.26$0
Jul 199621519.55$0
Jun 199628318.73$0
May 199619819.43$0
Apr 199627121.51$0
Mar 199640719.38$0
Feb 199644716.98$0
Jan 1996617.07$0
Dec 1995817.19$0
Nov 1995816.00$0
Oct 199510715.43$0
Sep 199531916.18$0
Aug 199520315.92$0
Jul 199524415.24$0
Jun 19954316.41$0
May 199510417.56$0
Apr 199512717.73$0
Mar 199516616.44$0
Feb 199510216.58$0
Jan 199512515.92$0
Dec 199424215.03$0
Nov 199464315.90$0
Oct 199487015.58$0
Sep 199484515.29$0
Aug 199471216.13$0
Jul 199466417.56$0
Jun 199452617.09$0
May 199472415.88$0
Apr 199463114.14$0
Mar 199474412.46$0
Feb 199432112.50$0
Jan 199423512.66$0
Dec 199325512.33$0
Nov 199315914.49$0
Oct 199331015.85$0
Sep 199332815.03$0
Aug 199317815.66$0
Jul 199332015.46$0
Jun 199343516.79$0
May 199380117.68$0
Apr 199378818.05$0
Mar 199376018.14$0
Feb 199370517.90$0
Jan 199388316.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Feb 1999 — as filed, then multipliedworked
Gas                  155 Mcf  × $  1.82 =       $282

────────────────────────────────────────────────────
Month total                                     $282

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 03/G/131258 is the state's own key, not one this site invented.