DAVIS "B" UNIT

Operated by COLUMBUS ENERGY CORP. (P-5 169309) in the SRALLA ROAD (JACKSON 9050) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 139584District 03Field 85446300CondensateGasSaveExport
Value, all time
$2.2 M
Jan 1993 – Jan 2008
Value, last 12 filed months
$4 k
at the published price for each month
Months reported
181
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 8 leases and 8 wells, and the rule below applies to all of them.

Discovered
1989-04-05
as the register files it
Field class
Oil and gas
the register's own label
Between wells
1,867 ft
minimum
From a lease line
660 ft
minimum

A drilling unit in this field needs at least 160 acres. The field rule took effect on 1993-03-22.

The Commission's schedule remark for this field reads: 49B ALLOWABLES EFF 4-1-93.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition24,017 bbl$397,497
GasProduction2,411,785 Mcf$1,790,253
Total$2,187,750

1,694,518 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 29.8491, -95.0303. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

29.84911, -95.03029 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
9,100 ft
1 wells filed one
Completion to plug
13.3 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 9,100 ft.

Completions filed
Sep 1991
1 of 1 wells
Plug dates filed
Jan 2005
1 of 1 wells

Last completion to plug: a median of 13.3 years across the 1 well that filed both dates, with the middle half between 13.3 years and 13.3 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-201322371LT9,100 ftSep 1991Jan 2005Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (181)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

181 months

Jan 20080090.388.21$0
Dec 20070088.337.30$0
Nov 20070091.677.29$0
Oct 20070082.856.92$0
Sep 20070075.846.24$0
Aug 20070069.066.39$0
Jul 200754070.906.39$3,829
Jun 20070062.007.55$0
May 20070058.747.85$0
Apr 20070059.617.81$0
Mar 20070056.927.30$0
Feb 20070055.108.22$0
Jan 20070050.306.73$0
Dec 20060056.656.92$0
Nov 20060054.207.62$0
Oct 20060054.906.01$0
Sep 20060060.085.04$0
Aug 20060068.717.34$0
Jul 20060069.376.34$0
Jun 20060066.286.38$0
May 20060066.016.42$0
Apr 20060064.397.36$0
Mar 20060056.707.08$0
Feb 20060057.597.75$0
Jan 20060060.598.93$0
Dec 20050054.9413.42$0
Nov 20050054.6910.59$0
Oct 20050058.3413.80$0
Sep 20050061.4512.08$0
Aug 20050061.519.80$0
Jul 20050055.697.84$0
Jun 20050052.337.38$0
May 20050045.226.65$0
Apr 20050049.207.36$0
Mar 20050050.377.15$0
Feb 20050045.226.31$0
Jan 20050043.166.32$0
Dec 20040039.866.75$0
Nov 20040045.286.33$0
Oct 20040049.706.52$0
Sep 20040043.245.28$0
Aug 20040042.375.55$0
Jul 20040038.286.08$0
Jun 20040036.106.43$0
May 20040037.486.49$0
Apr 20040034.475.86$0
Mar 20040034.365.53$0
Feb 20040032.455.51$0
Jan 20040032.036.30$0
Dec 20030030.266.30$0
Nov 20030028.804.60$0
Oct 20030028.174.76$0
Sep 20030026.314.75$0
Aug 20030029.765.13$0
Jul 20030029.415.17$0
Jun 20030028.565.98$0
May 20030026.595.97$0
Apr 20030026.675.41$0
Mar 20030031.146.10$0
Feb 20030033.487.93$0
Jan 20030030.315.58$0
Dec 20020026.914.85$0
Nov 20020024.664.14$0
Oct 20020026.464.23$0
Sep 20020027.443.64$0
Aug 20020025.963.16$0
Jul 20020024.583.06$0
Jun 20020023.733.34$0
May 20020024.663.58$0
Apr 20020023.653.51$0
Mar 20020022.003.10$0
Feb 20020018.222.38$0
Jan 20020017.172.38$0
Dec 20010016.932.36$0
Nov 20010018.072.41$0
Oct 20010019.782.53$0
Sep 20010024.262.25$0
Aug 20010024.873.05$0
Jul 20010023.933.20$0
Jun 20010024.563.82$0
May 20010025.524.31$0
Apr 200101924.685.34$101
Mar 200101924.545.38$102
Feb 200101927.755.77$110
Jan 200101927.478.40$160
Dec 200006426.889.12$584
Nov 200002332.215.66$130
Oct 200004,54831.235.15$23,402
Sep 2000925,57431.875.19$31,842
Aug 200005,63529.644.54$25,587
Jul 200006,90428.534.09$28,236
Jun 20001545,70129.304.40$29,581
May 200006,93827.263.68$25,530
Apr 200006,97824.513.12$21,743
Mar 200007,28528.422.86$20,833
Feb 20001247,16827.622.73$22,968
Jan 200008,25625.272.48$20,479
Dec 199909,21724.282.42$22,339
Nov 19991839,43923.192.43$27,218
Oct 1999010,69320.982.80$29,980
Sep 1999010,62921.752.62$27,836
Aug 199909,22519.262.88$26,527
Jul 1999012,12817.892.37$28,772
Jun 199918112,91415.942.36$33,389
May 1999013,73415.792.32$31,877
Apr 1999015,05315.102.21$33,238
Mar 199912116,03312.471.84$30,983
Feb 1999014,1699.981.82$25,756
Jan 199912111,06810.381.90$22,285
Dec 1998012,2369.201.77$21,698
Nov 199820212,39310.892.19$29,287
Oct 1998016,27512.421.97$32,049
Sep 1998015,08512.592.08$31,416
Aug 199818619,95511.301.91$40,163
Jul 1998020,85511.742.24$46,658
Jun 199818022,44611.242.24$52,241
May 1998023,31912.622.21$51,450
Apr 199818622,16913.042.51$57,966
Mar 199809,89412.802.31$22,850
Feb 199818519,27213.952.30$46,890
Jan 1998022,61414.702.15$48,728
Dec 199717220,40416.322.41$52,003
Nov 199718615,33718.193.09$50,748
Oct 1997024,24419.253.15$76,364
Sep 199711924,70117.742.95$75,100
Aug 199717623,84917.862.55$64,071
Jul 1997023,92017.582.25$53,747
Jun 199718623,59617.242.26$56,468
May 1997025,44118.972.31$58,731
Apr 199717822,37517.882.08$49,785
Mar 1997027,15718.951.94$52,661
Feb 199716826,87620.492.21$62,728
Jan 1997033,40223.483.54$118,233
Dec 199614634,88723.32$3,405
Nov 199632630,95421.97$7,162
Oct 199618432,51823.31$4,289
Sep 199618832,29522.22$4,177
Aug 199619331,15620.26$3,910
Jul 199635333,08219.55$6,901
Jun 199616929,09018.73$3,165
May 1996028,30219.43$0
Apr 199618728,64021.51$4,022
Mar 199618132,25719.38$3,508
Feb 199616431,89416.98$2,785
Jan 199618742,10017.07$3,192
Dec 199518242,30217.19$3,129
Nov 199535534,48616.00$5,680
Oct 199518237,11115.43$2,808
Sep 199530136,48016.18$4,870
Aug 199523828,27215.92$3,789
Jul 199549530,91615.24$7,544
Jun 199536238,75216.41$5,940
May 199536741,01417.56$6,445
Apr 199556040,73817.73$9,929
Mar 199536643,09216.44$6,017
Feb 199536936,69816.58$6,118
Jan 199536538,99515.92$5,811
Dec 199434933,01715.03$5,245
Nov 199405,74615.90$0
Oct 199436027,02515.58$5,609
Sep 199435842,64015.29$5,474
Aug 199436441,12816.13$5,871
Jul 199453144,93817.56$9,324
Jun 199454345,08417.09$9,280
May 199457047,08815.88$9,052
Apr 199455046,23314.14$7,777
Mar 199474947,19912.46$9,333
Feb 199473341,79512.50$9,163
Jan 199456236,49612.66$7,115
Dec 199355837,04712.33$6,880
Nov 199373736,21814.49$10,679
Oct 199373138,72715.85$11,586
Sep 199355234,73215.03$8,297
Aug 199390440,82515.66$14,157
Jul 199390440,58215.46$13,976
Jun 199393239,91216.79$15,648
May 199391942,28917.68$16,248
Apr 199391133,29818.05$16,444
Mar 199355219,34118.14$10,013
Feb 199336016,73117.90$6,444
Jan 199371420,39616.93$12,088

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jul 2007 — as filed, then multipliedworked
Condensate            54 bbl  × $ 70.90 =     $3,829
Gas                    0 Mcf  × $  6.39 =         $0

────────────────────────────────────────────────────
Month total                                   $3,829

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 03/G/139584 is the state's own key, not one this site invented.