SOUTH MAYES GAS UNIT 10

Operated by CHEVRON MIDCONTINENT, L.P. (P-5 147862) in the MAYES, SOUTH (FRIO 5) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 155982District 03Field 58651240CondensateGasSaveExport
Value, all time
$2.4 M
Oct 1995 – Mar 2009
Value, last 12 filed months
$0
at the published price for each month
Months reported
162
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6 leases and 6 wells, and the rule below applies to all of them.

Discovered
1961-04-01
as the register files it
Field class
Gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

The Commission's schedule remark for this field reads: FIELD ADMINISTRATIVELY BALANCED EFF 12-1-01 PER OPERATOR REQUEST

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition22,959 bbl$417,966
GasProduction1,380,108 Mcf$1,978,021
Total$2,395,987

652,264 Mcf of this lease's gas, across 15 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 29.5601, -94.7070. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

29.56014, -94.70696 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
12,100 ft
1 wells filed one
Completion to plug
12.4 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 12,100 ft.

Completions filed
Oct 1995
1 of 1 wells
Plug dates filed
Mar 2008
1 of 1 wells

Last completion to plug: a median of 12.4 years across the 1 well that filed both dates, with the middle half between 12.4 years and 12.4 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-07130464412,100 ftOct 1995Mar 2008Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (162)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

162 months

Mar 20090042.144.06$0
Feb 20090032.814.63$0
Jan 20090035.865.37$0
Dec 20080037.105.98$0
Nov 20080055.496.86$0
Oct 20080075.246.92$0
Sep 200800101.767.88$0
Aug 200800114.228.48$0
Jul 200800131.0811.39$0
Jun 200800131.3313.03$0
May 200800123.1711.57$0
Apr 200800110.3110.45$0
Mar 200800101.909.66$0
Feb 20080092.538.77$0
Jan 20080090.388.21$0
Dec 20070088.337.30$0
Nov 20070091.677.29$0
Oct 20070082.856.92$0
Sep 20070075.846.24$0
Aug 20070069.066.39$0
Jul 20070070.906.39$0
Jun 20070062.007.55$0
May 20070058.747.85$0
Apr 20070059.617.81$0
Mar 20070056.927.30$0
Feb 20070055.108.22$0
Jan 20070050.306.73$0
Dec 20060056.656.92$0
Nov 20060054.207.62$0
Oct 20060054.906.01$0
Sep 20060060.085.04$0
Aug 20060068.717.34$0
Jul 20060069.376.34$0
Jun 20060066.286.38$0
May 20060066.016.42$0
Apr 20060064.397.36$0
Mar 20060056.707.08$0
Feb 20060057.597.75$0
Jan 20060060.598.93$0
Dec 20050054.9413.42$0
Nov 20050054.6910.59$0
Oct 20050058.3413.80$0
Sep 20050061.4512.08$0
Aug 20050061.519.80$0
Jul 20050055.697.84$0
Jun 20050052.337.38$0
May 20050045.226.65$0
Apr 20050049.207.36$0
Mar 20050050.377.15$0
Feb 20050045.226.31$0
Jan 20050043.166.32$0
Dec 20040039.866.75$0
Nov 20040045.286.33$0
Oct 20040049.706.52$0
Sep 20040043.245.28$0
Aug 20040042.375.55$0
Jul 20040038.286.08$0
Jun 20040036.106.43$0
May 20040037.486.49$0
Apr 20040034.475.86$0
Mar 20040034.365.53$0
Feb 20040032.455.51$0
Jan 20040032.036.30$0
Dec 20030030.266.30$0
Nov 20030028.804.60$0
Oct 20030028.174.76$0
Sep 20030026.314.75$0
Aug 20030029.765.13$0
Jul 20030029.415.17$0
Jun 20030028.565.98$0
May 20030026.595.97$0
Apr 20030026.675.41$0
Mar 20030031.146.10$0
Feb 20030033.487.93$0
Jan 20030030.315.58$0
Dec 20020026.914.85$0
Nov 20020024.664.14$0
Oct 20020026.464.23$0
Sep 20020027.443.64$0
Aug 20020025.963.16$0
Jul 20020024.583.06$0
Jun 20020023.733.34$0
May 200291024.663.58$2,244
Apr 20020223.653.51$7
Mar 200203422.003.10$105
Feb 200203218.222.38$76
Jan 2002981,23317.172.38$4,612
Dec 200103,81216.932.36$9,013
Nov 200173,48518.072.41$8,510
Oct 2001547,97819.782.53$21,244
Sep 20014311,49024.262.25$26,911
Aug 200126116,62924.873.05$57,262
Jul 200113412,17823.933.20$42,141
Jun 20011625,72424.563.82$25,868
May 200123214,56625.524.31$68,661
Apr 2001523,87924.685.34$21,979
Mar 20011442,66824.545.38$17,878
Feb 2001631,32227.755.77$9,372
Jan 200119327827.478.40$7,637
Dec 2000504,83326.889.12$45,433
Nov 200006,06332.215.66$34,304
Oct 200007,97431.235.15$41,030
Sep 200088,52531.875.19$44,470
Aug 200009,24629.644.54$41,984
Jul 200008,13528.534.09$33,270
Jun 200009,61229.304.40$42,266
May 200018910,45927.263.68$43,639
Apr 200003,17324.513.12$9,887
Mar 20001794,46928.422.86$17,867
Feb 200008,94027.622.73$24,375
Jan 20002184,60725.272.48$16,937
Dec 1999159,02524.282.42$22,238
Nov 19991829,93523.192.43$28,402
Oct 199908,76220.982.80$24,566
Sep 199901,08021.752.62$2,828
Aug 19991833,45619.262.88$13,463
Jul 199908,56717.892.37$20,324
Jun 19991597,69715.942.36$20,716
May 199908,55315.792.32$19,852
Apr 19993008,60415.102.21$23,528
Mar 199918011,09312.471.84$22,637
Feb 19994910,7559.981.82$20,039
Jan 199921712,61510.381.90$26,220
Dec 199818912,2759.201.77$23,506
Nov 199819411,63710.892.19$27,548
Oct 199818513,09812.421.97$28,090
Sep 199820312,33712.592.08$28,249
Aug 1998213,11911.301.91$25,045
Jul 199818813,06311.742.24$31,433
Jun 199818212,82411.242.24$30,736
May 199818814,02212.622.21$33,310
Apr 1998014,12813.042.51$35,395
Mar 199836113,87012.802.31$36,653
Feb 1998014,67013.952.30$33,728
Jan 199818917,15614.702.15$39,746
Dec 199737818,31216.322.41$50,321
Nov 1997019,56318.193.09$60,416
Oct 199718721,38019.253.15$70,943
Sep 199718320,49917.742.95$63,819
Aug 199721328,30017.862.55$76,103
Jul 199736230,99617.582.25$76,010
Jun 199723631,45817.242.26$75,076
May 199750034,07118.972.31$88,138
Apr 199748441,92217.882.08$95,968
Mar 199727225,87718.951.94$55,334
Feb 19970020.492.21$0
Jan 199741721,77923.483.54$86,882
Dec 199664843,94023.32$15,111
Nov 199648430,66621.97$10,633
Oct 199642826,77023.31$9,977
Sep 199640312,18222.22$8,955
Aug 199624919,94120.26$5,045
Jul 199664123,58519.55$12,532
Jun 199624626,92618.73$4,608
May 199656432,65519.43$10,959
Apr 199659132,05121.51$12,712
Mar 199695053,96819.38$18,411
Feb 19961,13361,97816.98$19,238
Jan 19961,74373,61817.07$29,753
Dec 19951,86073,83017.19$31,973
Nov 19952,24575,17116.00$35,920
Oct 19952,19864,98315.43$33,915

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2002 — as filed, then multipliedworked
Condensate            91 bbl  × $ 24.66 =     $2,244
Gas                    0 Mcf  × $  3.58 =         $0

────────────────────────────────────────────────────
Month total                                   $2,244

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 03/G/155982 is the state's own key, not one this site invented.