VASTAR

Operated by NOBLE ENERGY INC (P-5 611665) in the VIDOR AMES, S. (YEGUA DY) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 162020District 03Field 93770495CondensateGasSaveExport
Value, all time
$459 k
Aug 1996 – Jun 2006
Value, last 12 filed months
$2 k
at the published price for each month
Months reported
119
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 2 leases and 2 wells, and the rule below applies to all of them.

Discovered
1996-08-12
as the register files it
Field class
Gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

The Commission's schedule remark for this field reads: AOF-1 AND AOF-2 EFFECTIVE 12/01/2001.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition2,924 bbl$45,779
GasProduction142,425 Mcf$412,860
Total$458,639

2,931 Mcf of this lease's gas, across 1 month, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.1353, -93.9993. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
14,024 ft
1 wells filed one
Completion to plug
5.2 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 14,024 ft.

Completions filed
Apr 2001
1 of 1 wells
Plug dates filed
Jun 2006
1 of 1 wells

Last completion to plug: a median of 5.2 years across the 1 well that filed both dates, with the middle half between 5.2 years and 5.2 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-36130717114,024 ftApr 2001Jun 2006Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (119)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

119 months

Jun 20060066.286.38$0
May 20060066.016.42$0
Apr 20060064.397.36$0
Mar 20060056.707.08$0
Feb 20060057.597.75$0
Jan 200605960.598.93$527
Dec 20050054.9413.42$0
Nov 20050054.6910.59$0
Oct 20050058.3413.80$0
Sep 2005110061.4512.08$1,269
Aug 20050061.519.80$0
Jul 20050055.697.84$0
Jun 200507052.337.38$517
May 20050045.226.65$0
Apr 2005012249.207.36$898
Mar 20050050.377.15$0
Feb 20050045.226.31$0
Jan 2005011043.166.32$695
Dec 20040039.866.75$0
Nov 2004111145.286.33$748
Oct 20040049.706.52$0
Sep 2004011443.245.28$602
Aug 2004019842.375.55$1,099
Jul 200408738.286.08$529
Jun 200406936.106.43$444
May 200409537.486.49$617
Apr 2004016734.475.86$978
Mar 2004018934.365.53$1,045
Feb 2004012332.455.51$678
Jan 2004012232.036.30$769
Dec 200308430.266.30$529
Nov 200309928.804.60$455
Oct 200319928.174.76$499
Sep 2003011926.314.75$565
Aug 2003010229.765.13$523
Jul 20030029.415.17$0
Jun 200301,19128.565.98$7,126
May 2003037126.595.97$2,216
Apr 200302,85526.675.41$15,438
Mar 200352,09531.146.10$12,927
Feb 20030033.487.93$0
Jan 2003110930.315.58$639
Dec 2002110926.914.85$556
Nov 20020024.664.14$0
Oct 20021326.464.23$39
Sep 200249227.443.64$444
Aug 20020025.963.16$0
Jul 200238124.583.06$322
Jun 20020023.733.34$0
May 200232324.663.58$156
Apr 20020023.653.51$0
Mar 200201622.003.10$50
Feb 200202818.222.38$67
Jan 20020017.172.38$0
Dec 20010016.932.36$0
Nov 20010018.072.41$0
Oct 2001218119.782.53$497
Sep 2001857724.262.25$1,493
Aug 2001361,86924.873.05$6,602
Jul 20011406,89823.933.20$25,404
Jun 2001634,60024.563.82$19,138
May 200113911,23625.524.31$51,944
Apr 20011217,19924.685.34$41,395
Mar 20010024.545.38$0
Feb 20010027.755.77$0
Jan 20010027.478.40$0
Dec 20000026.889.12$0
Nov 20000032.215.66$0
Oct 20000031.235.15$0
Sep 20000031.875.19$0
Aug 20000029.644.54$0
Jul 20000028.534.09$0
Jun 2000859629.304.40$2,855
May 20000027.263.68$0
Apr 20001033724.513.12$1,295
Mar 20001333928.422.86$1,339
Feb 20000027.622.73$0
Jan 20000025.272.48$0
Dec 19990024.282.42$0
Nov 19990023.192.43$0
Oct 19990020.982.80$0
Sep 19990021.752.62$0
Aug 19990019.262.88$0
Jul 19990017.892.37$0
Jun 19990015.942.36$0
May 19990015.792.32$0
Apr 19990015.102.21$0
Mar 19990012.471.84$0
Feb 1999135469.981.82$1,122
Jan 19994459410.381.90$1,585
Dec 1998235189.201.77$1,130
Nov 1998738610.892.19$920
Oct 1998884912.421.97$1,771
Sep 19981012.592.08$13
Aug 1998561,83911.301.91$4,140
Jul 19981082,81611.742.24$7,568
Jun 19981565,67811.242.24$14,457
May 199828513,32412.622.21$32,994
Apr 199849421,78513.042.51$61,020
Mar 199830914,47512.802.31$37,384
Feb 199819612,04413.952.30$30,425
Jan 199846516,62314.702.15$42,655
Dec 19971214,97316.322.41$13,965
Nov 19970018.193.09$0
Oct 19970019.253.15$0
Sep 19970017.742.95$0
Aug 19970017.862.55$0
Jul 19970017.582.25$0
Jun 19970017.242.26$0
May 19970018.972.31$0
Apr 19970017.882.08$0
Mar 19970018.951.94$0
Feb 19970020.492.21$0
Jan 19970023.483.54$0
Dec 19960023.32$0
Nov 19960021.97$0
Oct 19960023.31$0
Sep 19960022.22$0
Aug 1996772,93120.26$1,560

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jan 2006 — as filed, then multipliedworked
Condensate             0 bbl  × $ 60.59 =         $0
Gas                   59 Mcf  × $  8.93 =       $527

────────────────────────────────────────────────────
Month total                                     $527

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 03/G/162020 is the state's own key, not one this site invented.