KALLINA

Operated by MOHICAN OIL & GAS, L.L.C. (P-5 573678) in the GARWOOD (3800) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 164838District 03Field 34090924GasSaveExport
Value, all time
$1.5 M
Sep 1997 – Sep 2008
Value, last 12 filed months
$1 k
at the published price for each month
Months reported
133
no gaps in the span
Streams
1
gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 9 leases and 9 wells, and the rule below applies to all of them.

Discovered
1961-05-17
as the register files it
Field class
Gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

The Commission's schedule remark for this field reads: AOF-1 AND AOF-2 EFFECTIVE 05/01/98.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
GasProduction424,080 Mcf$1,511,657
Total$1,511,657

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 29.3683, -96.5475. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

29.36826, -96.54752 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
6,455 ft
1 wells filed one
Completion to plug
12 months
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,455 ft.

Completions filed
May 2011
1 of 1 wells
Plug dates filed
May 2012
1 of 1 wells

Last completion to plug: a median of 12 months across the 1 well that filed both dates, with the middle half between 12 months and 12 months. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-0893204126,455 ftMay 2011May 2012Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (133)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

133 months

Sep 20080101.767.88$0
Aug 20080114.228.48$0
Jul 20080131.0811.39$0
Jun 20080131.3313.03$0
May 20080123.1711.57$0
Apr 20080110.3110.45$0
Mar 20080101.909.66$0
Feb 2008092.538.77$0
Jan 2008090.388.21$0
Dec 2007088.337.30$0
Nov 20075791.677.29$416
Oct 200711582.856.92$796
Sep 2007075.846.24$0
Aug 2007069.066.39$0
Jul 20075670.906.39$358
Jun 200713362.007.55$1,004
May 200718958.747.85$1,483
Apr 200712159.617.81$944
Mar 200714656.927.30$1,066
Feb 200713355.108.22$1,093
Jan 200722850.306.73$1,534
Dec 200639256.656.92$2,712
Nov 200651154.207.62$3,893
Oct 200644954.906.01$2,700
Sep 200678660.085.04$3,959
Aug 200679568.717.34$5,835
Jul 200668969.376.34$4,370
Jun 200662266.286.38$3,971
May 20061,01266.016.42$6,502
Apr 20061,07664.397.36$7,920
Mar 200671956.707.08$5,093
Feb 200683757.597.75$6,488
Jan 200690460.598.93$8,076
Dec 200575054.9413.42$10,062
Nov 20051,34054.6910.59$14,188
Oct 200599058.3413.80$13,658
Sep 20051,10761.4512.08$13,371
Aug 20051,43561.519.80$14,058
Jul 20051,60455.697.84$12,581
Jun 20051,65852.337.38$12,238
May 20051,21945.226.65$8,108
Apr 200585649.207.36$6,301
Mar 20051,46450.377.15$10,475
Feb 20051,25745.226.31$7,934
Jan 20051,42343.166.32$8,996
Dec 20041,21039.866.75$8,169
Nov 20041,29245.286.33$8,179
Oct 20041,31149.706.52$8,541
Sep 20041,24943.245.28$6,600
Aug 20041,39942.375.55$7,765
Jul 20041,40538.286.08$8,548
Jun 20041,39636.106.43$8,981
May 20041,51937.486.49$9,865
Apr 20041,45334.475.86$8,512
Mar 20041,56834.365.53$8,671
Feb 20041,42932.455.51$7,873
Jan 20042,18732.036.30$13,777
Dec 20031,60130.266.30$10,089
Nov 20032,19628.804.60$10,091
Oct 20032,87328.174.76$13,674
Sep 20032,38326.314.75$11,318
Aug 20032,60729.765.13$13,373
Jul 20032,55629.415.17$13,217
Jun 20032,67428.565.98$15,998
May 20031,85826.595.97$11,097
Apr 20032,09726.675.41$11,339
Mar 20032,00931.146.10$12,247
Feb 20032,18733.487.93$17,334
Jan 20032,36130.315.58$13,179
Dec 20022,35626.914.85$11,435
Nov 20021,90224.664.14$7,869
Oct 20022,37226.464.23$10,031
Sep 20022,38927.443.64$8,684
Aug 20022,27825.963.16$7,208
Jul 20022,33224.583.06$7,140
Jun 20022,30123.733.34$7,681
May 20022,10224.663.58$7,534
Apr 20022,27223.653.51$7,980
Mar 20022,03422.003.10$6,311
Feb 20022,27718.222.38$5,409
Jan 20022,51417.172.38$5,972
Dec 20012,93116.932.36$6,930
Nov 20013,26718.072.41$7,859
Oct 20013,01319.782.53$7,620
Sep 20013,00224.262.25$6,758
Aug 20013,95724.873.05$12,081
Jul 20013,28023.933.20$10,486
Jun 20013,44124.563.82$13,159
May 20013,67225.524.31$15,816
Apr 20013,84724.685.34$20,525
Mar 20013,82924.545.38$20,586
Feb 20013,84027.755.77$22,146
Jan 20014,43727.478.40$37,265
Dec 20004,42526.889.12$40,367
Nov 20003,96132.215.66$22,411
Oct 20004,32031.235.15$22,229
Sep 20003,08731.875.19$16,011
Aug 20003,59829.644.54$16,338
Jul 20003,74728.534.09$15,324
Jun 20004,34329.304.40$19,097
May 20004,82127.263.68$17,740
Apr 20005,14124.513.12$16,019
Mar 20008,11728.422.86$23,213
Feb 200012,79027.622.73$34,872
Jan 200013,53025.272.48$33,561
Dec 199911,58024.282.42$28,067
Nov 199910,41323.192.43$25,345
Oct 19999,86820.982.80$27,667
Sep 19999,69621.752.62$25,392
Aug 19999,91719.262.88$28,517
Jul 19999,50917.892.37$22,559
Jun 19997,29115.942.36$17,222
May 19996,84115.792.32$15,878
Apr 19996,97015.102.21$15,390
Mar 19997,03512.471.84$12,933
Feb 19996,8359.981.82$12,425
Jan 19996,99110.381.90$13,283
Dec 19986,7099.201.77$11,897
Nov 19987,26010.892.19$15,868
Oct 19986,61012.421.97$13,016
Sep 19985,88312.592.08$12,252
Aug 19987,70711.301.91$14,700
Jul 19988,01711.742.24$17,936
Jun 19986,37211.242.24$14,256
May 19987,69312.622.21$16,973
Apr 19987,15213.042.51$17,918
Mar 19986,89612.802.31$15,926
Feb 19986,63513.952.30$15,255
Jan 19987,56014.702.15$16,290
Dec 19977,81416.322.41$18,840
Nov 19977,31818.193.09$22,600
Oct 19975,87919.253.15$18,518
Sep 19974,21117.742.95$12,443

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Nov 2007 — as filed, then multipliedworked
Gas                   57 Mcf  × $  7.29 =       $416

────────────────────────────────────────────────────
Month total                                     $416

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 03/G/164838 is the state's own key, not one this site invented.