MCMILLAN UNIT

Operated by CARRIZO OIL & GAS, INC. (P-5 135401) in the W. D. MCMILLAN (YEGUA 9650) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 169272District 03Field 94256495CondensateGasSaveExport
Value, all time
$17.8 M
Jun 1998 – Apr 2006
Value, last 12 filed months
$0
at the published price for each month
Months reported
95
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 11 leases and 11 wells, and the rule below applies to all of them.

Discovered
1998-01-31
as the register files it
Field class
Oil and gas
the register's own label
Between wells
1,200 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 80 acres. The field rule took effect on 2015-08-28.

The Commission's schedule remark for this field reads: P-16 ALONG WITH A LEASE PLAT OR PRORATION PLAT IF THEY SO CHOOSE.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition381,251 bbl$7,976,345
GasProduction2,612,914 Mcf$9,830,297
Total$17,806,641

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 29.2856, -96.1616. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

29.28559, -96.16158 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
9,696 ft
1 wells filed one
Completion to plug
5.0 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 9,696 ft.

Completions filed
Jun 1998
1 of 1 wells
Plug dates filed
Jun 2003
1 of 1 wells

Last completion to plug: a median of 5.0 years across the 1 well that filed both dates, with the middle half between 5.0 years and 5.0 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-4813403329,696 ftJun 1998Jun 2003Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (95)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

95 months

Apr 20060064.397.36$0
Mar 20060056.707.08$0
Feb 20060057.597.75$0
Jan 20060060.598.93$0
Dec 20050054.9413.42$0
Nov 20050054.6910.59$0
Oct 20050058.3413.80$0
Sep 20050061.4512.08$0
Aug 20050061.519.80$0
Jul 20050055.697.84$0
Jun 20050052.337.38$0
May 20050045.226.65$0
Apr 20050049.207.36$0
Mar 20050050.377.15$0
Feb 20050045.226.31$0
Jan 20050043.166.32$0
Dec 20040039.866.75$0
Nov 20040045.286.33$0
Oct 20040049.706.52$0
Sep 20040043.245.28$0
Aug 20040042.375.55$0
Jul 20040038.286.08$0
Jun 20040036.106.43$0
May 20040037.486.49$0
Apr 2004139034.475.86$4,791
Mar 20040034.365.53$0
Feb 20040032.455.51$0
Jan 20040032.036.30$0
Dec 20030030.266.30$0
Nov 20030028.804.60$0
Oct 20030028.174.76$0
Sep 20030026.314.75$0
Aug 20030029.765.13$0
Jul 20030029.415.17$0
Jun 20030028.565.98$0
May 20030026.595.97$0
Apr 20030026.675.41$0
Mar 200343031.146.10$1,339
Feb 20030033.487.93$0
Jan 2003790030.315.58$23,945
Dec 20020026.914.85$0
Nov 20020024.664.14$0
Oct 200274076826.464.23$22,828
Sep 2002115,09327.443.64$54,894
Aug 200255716,55025.963.16$66,827
Jul 200236117,01324.583.06$60,963
Jun 200240514,70123.733.34$58,686
May 200229,93724.663.58$35,664
Apr 20025623.653.51$139
Mar 200218577422.003.10$6,472
Feb 200222,04118.222.38$4,885
Jan 20025677,30517.172.38$27,090
Dec 200153916,74516.932.36$48,717
Nov 200192033,56318.072.41$97,361
Oct 200191039,39519.782.53$117,625
Sep 20011,12137,04424.262.25$110,593
Aug 20011,29842,66724.873.05$162,550
Jul 20011,46444,99023.933.20$178,870
Jun 20011,77954,50124.563.82$252,113
May 20012,43970,86325.524.31$367,473
Apr 20013,21584,89724.685.34$532,299
Mar 20014,32593,82924.545.38$610,601
Feb 20014,84791,69127.755.77$663,294
Jan 20016,877103,49027.478.40$1,058,099
Dec 20008,31399,67826.889.12$1,132,766
Nov 20009,829100,93332.215.66$887,671
Oct 200011,38594,50531.235.15$841,829
Sep 20009,37565,13931.875.19$636,625
Aug 200010,22454,39729.644.54$550,043
Jul 200011,14753,11528.534.09$535,251
Jun 200011,93957,02729.304.40$600,575
May 200012,99559,81427.263.68$574,344
Apr 200013,23060,40024.513.12$512,474
Mar 200012,43855,25928.422.86$511,515
Feb 200011,81450,66227.622.73$464,433
Jan 200012,07453,56225.272.48$437,971
Dec 199912,75653,86024.282.42$440,257
Nov 199912,65554,12223.192.43$425,202
Oct 199913,25657,43420.982.80$439,139
Sep 199912,29955,36821.752.62$412,504
Aug 199912,52459,19219.262.88$411,425
Jul 199912,40755,28517.892.37$353,118
Jun 199911,22449,56715.942.36$295,993
May 199911,91352,96415.792.32$311,037
Apr 199910,87654,04515.102.21$283,562
Mar 199912,35255,79812.471.84$256,605
Feb 199910,74550,3019.981.82$198,672
Jan 199912,26255,78410.381.90$233,266
Dec 199811,48558,3299.201.77$209,098
Nov 199810,82655,22310.892.19$238,597
Oct 199811,03758,38712.421.97$252,056
Sep 199810,31654,00812.592.08$242,357
Aug 199810,03455,68611.301.91$219,597
Jul 199810,08054,00811.742.24$239,170
Jun 19983,91021,19911.242.24$91,376

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Apr 2004 — as filed, then multipliedworked
Condensate           139 bbl  × $ 34.47 =     $4,791
Gas                    0 Mcf  × $  5.86 =         $0

────────────────────────────────────────────────────
Month total                                   $4,791

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 03/G/169272 is the state's own key, not one this site invented.