TXI OPERATIONS, L. P.

Operated by CAMOIL, INC. (P-5 127449) in the CLODINE (LOWER WILCOX) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 169773District 03Field 190482402 tax incentive programmesGasSaveExport
Value, all time
$3.1 M
Mar 1998 – Nov 2005
Value, last 12 filed months
$0
at the published price for each month
Months reported
93
no gaps in the span
Streams
1
gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 1 leases and 1 wells, and the rule below applies to all of them.

Discovered
1998-03-02
as the register files it
Field class
Gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas111999-05-07140350
NGPA2none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
GasProduction826,686 Mcf$3,133,133
Total$3,133,133

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 29.7014, -95.7023. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

29.70140, -95.70226 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
19,174 ft
1 wells filed one
Completion to plug
7.7 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 19,174 ft.

Completions filed
Mar 1998
1 of 1 wells
Plug dates filed
Nov 2005
1 of 1 wells

Last completion to plug: a median of 7.7 years across the 1 well that filed both dates, with the middle half between 7.7 years and 7.7 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-15731982119,174 ftMar 1998Nov 2005Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (93)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

93 months

Nov 2005054.6910.59$0
Oct 2005058.3413.80$0
Sep 2005061.4512.08$0
Aug 2005061.519.80$0
Jul 2005055.697.84$0
Jun 2005052.337.38$0
May 2005045.226.65$0
Apr 2005049.207.36$0
Mar 2005050.377.15$0
Feb 2005045.226.31$0
Jan 2005043.166.32$0
Dec 2004039.866.75$0
Nov 2004045.286.33$0
Oct 2004049.706.52$0
Sep 2004043.245.28$0
Aug 2004042.375.55$0
Jul 2004038.286.08$0
Jun 2004036.106.43$0
May 2004037.486.49$0
Apr 2004034.475.86$0
Mar 2004034.365.53$0
Feb 2004032.455.51$0
Jan 2004032.036.30$0
Dec 2003030.266.30$0
Nov 20031,64428.804.60$7,554
Oct 20031,94228.174.76$9,243
Sep 20033,23026.314.75$15,340
Aug 20031,50929.765.13$7,741
Jul 2003029.415.17$0
Jun 20038,69228.565.98$52,004
May 20038,41326.595.97$50,248
Apr 200311,02126.675.41$59,594
Mar 20035,60331.146.10$34,156
Feb 20034,54433.487.93$36,015
Jan 20038,79630.315.58$49,100
Dec 20028,38226.914.85$40,684
Nov 20028,19524.664.14$33,902
Oct 20028,36426.464.23$35,372
Sep 20026,89427.443.64$25,061
Aug 20026,10425.963.16$19,314
Jul 200210,36124.583.06$31,723
Jun 200212,39923.733.34$41,391
May 200214,29824.663.58$51,244
Apr 200215,38523.653.51$54,037
Mar 200216,78922.003.10$52,092
Feb 200215,98618.222.38$37,978
Jan 200214,26217.172.38$33,882
Dec 200112,85116.932.36$30,385
Nov 200111,66518.072.41$28,060
Oct 200117,56819.782.53$44,427
Sep 200115,67024.262.25$35,278
Aug 200116,93224.873.05$51,696
Jul 200116,39823.933.20$52,426
Jun 200116,30424.563.82$62,349
May 200115,98025.524.31$68,831
Apr 200117,85224.685.34$95,246
Mar 200117,87924.545.38$96,125
Feb 200115,87427.755.77$91,547
Jan 200119,23327.478.40$161,533
Dec 200020,70526.889.12$188,881
Nov 200017,03232.215.66$96,367
Oct 200017,55531.235.15$90,329
Sep 200018,56131.875.19$96,267
Aug 200020,57329.644.54$93,417
Jul 200021,38228.534.09$87,447
Jun 200018,70329.304.40$82,242
May 200023,51827.263.68$86,540
Apr 200020,36124.513.12$63,445
Mar 20009,68628.422.86$27,700
Feb 200020,37027.622.73$55,539
Jan 200019,45925.272.48$48,268
Dec 199920,80524.282.42$50,425
Nov 199916,95423.192.43$41,266
Oct 199920,65720.982.80$57,916
Sep 199923,43921.752.62$61,383
Aug 199923,04319.262.88$66,262
Jul 199924,09317.892.37$57,158
Jun 199926,20515.942.36$61,899
May 199929,16915.792.32$67,702
Apr 19995,93315.102.21$13,100
Mar 19998,80312.471.84$16,183
Feb 19992,8199.981.82$5,124
Jan 19999010.381.90$171
Dec 199809.201.77$0
Nov 1998010.892.19$0
Oct 1998012.421.97$0
Sep 1998012.592.08$0
Aug 1998011.301.91$0
Jul 1998011.742.24$0
Jun 1998011.242.24$0
May 1998012.622.21$0
Apr 1998013.042.51$0
Mar 19989,75212.802.31$22,522

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Nov 2003 — as filed, then multipliedworked
Gas                1,644 Mcf  × $  4.60 =     $7,554

────────────────────────────────────────────────────
Month total                                   $7,554

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 03/G/169773 is the state's own key, not one this site invented.