COLUMBUS FIELD UNIT

Operated by DAYLIGHT PETROLEUM LLC (P-5 208171) in the COLUMBUS (CONSOLIDATED) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 173112District 03Field 19837005CondensateGasSaveExport
Value, all time
$1.1 M
Apr 1999 – Sep 2021
Value, last 12 filed months
$0
at the published price for each month
Months reported
270
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 70 leases and 110 wells, and the rule below applies to all of them.

Discovered
2001-08-21
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2001-08-21.

The Commission's schedule remark for this field reads: WHICH IS SUSPENDED.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition4,757 bbl$210,759
GasProduction251,886 Mcf$932,039
Total$1,142,798

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 29.7658, -96.5589. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

29.76580, -96.55889 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
9,767 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 9,767 ft.

Completions filed
Sep 2021
1 of 1 wells

1 well

42-089000605049,767 ftSep 2021Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (270)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

270 months

Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 20200057.252.09$0
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 20193053.472.42$160
Sep 2019362555.052.66$2,048
Aug 2019569253.112.30$3,186
Jul 20193810156.272.46$2,387
Jun 20194110452.782.49$2,423
May 20195211458.482.74$3,353
Apr 20196011562.632.75$4,074
Mar 20198311456.803.06$5,063
Feb 201916610350.852.79$8,729
Jan 2019564846.033.23$2,733
Dec 2018846246.594.19$4,173
Nov 201811616352.934.24$6,831
Oct 20187617561.443.40$5,264
Sep 20185814459.543.11$3,901
Aug 201813015259.403.07$8,188
Jul 20189418065.142.93$6,651
Jun 201814614660.183.08$9,236
May 201811619065.382.90$8,135
Apr 2018517563.842.90$3,473
Mar 20181151361.222.79$7,077
Feb 20182057261.782.77$12,864
Jan 2018494262.874.01$3,249
Dec 20170057.272.92$0
Nov 20170055.423.12$0
Oct 20171049.292.98$49
Sep 20176160347.523.09$4,760
Aug 201713278545.373.00$8,347
Jul 201719879043.873.09$11,125
Jun 201715082442.493.09$8,917
May 201712289945.373.26$8,469
Apr 201714079847.933.21$9,273
Mar 201718884846.772.98$11,323
Feb 201720278550.452.95$12,509
Jan 201719887649.413.42$12,778
Dec 201622996548.763.72$14,759
Nov 20166865242.492.64$4,613
Oct 2016594946.193.09$2,877
Sep 2016030941.553.10$958
Aug 2016015941.442.92$465
Jul 2016019241.622.92$561
Jun 2016019545.352.69$524
May 2016018942.521.99$376
Apr 2016018936.561.99$376
Mar 2016019033.011.79$341
Feb 2016018726.472.06$386
Jan 2016021527.352.36$508
Dec 2015022432.362.00$448
Nov 2015019938.792.17$431
Oct 2015020643.552.43$500
Sep 2015067442.992.76$1,859
Aug 2015050340.162.87$1,445
Jul 2015066748.152.95$1,964
Jun 2015045056.152.88$1,297
May 2015057955.212.96$1,711
Apr 2015056049.822.71$1,516
Mar 2015048942.892.93$1,435
Feb 2015028344.662.98$842
Jan 2015039343.433.10$1,219
Dec 2014039754.693.59$1,426
Nov 2014024670.464.25$1,046
Oct 2014032278.303.90$1,256
Sep 2014037186.164.05$1,501
Aug 2014050289.394.04$2,026
Jul 2014048596.564.18$2,027
Jun 2014045598.164.74$2,155
May 2014039794.734.73$1,876
Apr 2014021995.944.81$1,053
Mar 2014043995.895.06$2,220
Feb 2014012197.406.19$749
Jan 2014042990.404.86$2,085
Dec 2013035591.824.35$1,546
Nov 2013033188.853.74$1,237
Oct 2013021497.423.78$809
Sep 20130184104.113.72$684
Aug 20130400104.253.52$1,409
Jul 20130287102.523.72$1,067
Jun 2013026194.403.93$1,027
May 2013025494.834.15$1,054
Apr 2013024093.964.28$1,028
Mar 2013026693.623.91$1,041
Feb 2013025191.233.42$858
Jan 2013030891.603.42$1,053
Dec 2012027986.773.42$954
Nov 2012028886.953.62$1,044
Oct 2012029389.383.40$996
Sep 2012026294.672.92$765
Aug 2012028992.662.91$840
Jul 2012025685.133.02$773
Jun 2012027679.822.52$695
May 2012028591.612.49$709
Apr 20120322101.652.00$643
Mar 20120146105.052.22$324
Feb 20120253101.102.57$650
Jan 2012021498.092.73$585
Dec 2011023496.873.24$758
Nov 2011013095.723.31$430
Oct 2011034384.983.65$1,251
Sep 2011033183.623.99$1,319
Aug 2011036183.404.15$1,498
Jul 2011033394.144.52$1,504
Jun 2011026992.904.64$1,248
May 2011025298.134.40$1,110
Apr 20110121105.964.33$524
Mar 2011012396.364.06$499
Feb 2011012685.644.18$527
Jan 2011016486.504.59$753
Dec 2010014785.734.35$639
Nov 201009680.843.80$364
Oct 2010011278.103.51$393
Sep 2010014972.633.98$593
Aug 2010018173.684.42$800
Jul 2010015972.554.74$753
Jun 2010016170.364.91$791
May 2010015671.124.24$661
Apr 2010016781.694.12$688
Mar 2010015178.394.39$663
Feb 2010012673.585.44$686
Jan 2010016874.365.96$1,002
Dec 2009017771.445.48$971
Nov 2009018674.593.75$698
Oct 2009017772.544.11$728
Sep 2009027265.543.06$834
Aug 2009025767.423.22$827
Jul 2009023561.133.46$814
Jun 2009019766.163.90$767
May 200908354.743.93$326
Apr 2009019946.773.59$714
Mar 2009054742.144.06$2,220
Feb 2009021232.814.63$982
Jan 2009215635.865.37$910
Dec 2008120837.105.98$1,280
Nov 2008116655.496.86$1,194
Oct 2008126875.246.92$1,930
Sep 20081284101.767.88$2,339
Aug 20080259114.228.48$2,197
Jul 20080252131.0811.39$2,870
Jun 20080198131.3313.03$2,580
May 20080135123.1711.57$1,563
Apr 20080191110.3110.45$1,997
Mar 20080299101.909.66$2,890
Feb 2008113392.538.77$1,259
Jan 2008120890.388.21$1,797
Dec 2007112188.337.30$972
Nov 2007130891.677.29$2,338
Oct 2007142882.856.92$3,045
Sep 2007140475.846.24$2,598
Aug 2007162269.066.39$4,042
Jul 2007133970.906.39$2,236
Jun 2007133362.007.55$2,576
May 2007230158.747.85$2,479
Apr 2007076359.617.81$5,955
Mar 2007158156.927.30$4,299
Feb 2007548255.108.22$4,236
Jan 2007062050.306.73$4,171
Dec 200601,06156.656.92$7,340
Nov 2006077954.207.62$5,934
Oct 200611,41054.906.01$8,534
Sep 2006086260.085.04$4,342
Aug 2006038468.717.34$2,819
Jul 2006081869.376.34$5,188
Jun 200601,52866.286.38$9,755
May 200601,67966.016.42$10,788
Apr 2006068164.397.36$5,012
Mar 2006056056.707.08$3,966
Feb 2006032057.597.75$2,480
Jan 2006045660.598.93$4,074
Dec 200502,82854.9413.42$37,939
Nov 2005028454.6910.59$3,007
Oct 200501,16058.3413.80$16,003
Sep 200501,13861.4512.08$13,746
Aug 200501,14861.519.80$11,247
Jul 200501,77755.697.84$13,938
Jun 2005093152.337.38$6,872
May 200531,10645.226.65$7,492
Apr 2005013149.207.36$964
Mar 2005182650.377.15$5,960
Feb 20051147645.226.31$3,502
Jan 2005024243.166.32$1,530
Dec 2004043539.866.75$2,937
Nov 2004151945.286.33$3,331
Oct 2004059849.706.52$3,896
Sep 2004060843.245.28$3,213
Aug 2004065742.375.55$3,647
Jul 2004058238.286.08$3,541
Jun 2004064136.106.43$4,124
May 2004062537.486.49$4,059
Apr 2004049034.475.86$2,871
Mar 2004056234.365.53$3,108
Feb 2004064432.455.51$3,548
Jan 2004461332.036.30$3,990
Dec 2003960630.266.30$4,091
Nov 2003951928.804.60$2,644
Oct 2003948228.174.76$2,548
Sep 2003948726.314.75$2,550
Aug 2003953629.765.13$3,017
Jul 20031260929.415.17$3,502
Jun 20031259528.565.98$3,903
May 20031261626.595.97$3,998
Apr 20031275926.675.41$4,424
Mar 2003111,81231.146.10$11,389
Feb 2003135533.487.93$2,847
Jan 20030030.315.58$0
Dec 2002429326.914.85$1,530
Nov 200261,21124.664.14$5,158
Oct 20020026.464.23$0
Sep 20020927.443.64$33
Aug 20020025.963.16$0
Jul 20020024.583.06$0
Jun 20020023.733.34$0
May 20020024.663.58$0
Apr 20020023.653.51$0
Mar 20020022.003.10$0
Feb 200201818.222.38$43
Jan 200211,07117.172.38$2,562
Dec 2001277916.932.36$1,876
Nov 2001383018.072.41$2,051
Oct 2001194819.782.53$2,417
Sep 200143,15824.262.25$7,207
Aug 20010024.873.05$0
Jul 2001035023.933.20$1,119
Jun 2001193824.563.82$3,612
May 200103,28325.524.31$14,141
Apr 200132,55724.685.34$13,716
Mar 2001035024.545.38$1,882
Feb 20010027.755.77$0
Jan 20010027.478.40$0
Dec 20000026.889.12$0
Nov 20000032.215.66$0
Oct 2000122731.235.15$1,199
Sep 200002,13731.875.19$11,084
Aug 200042,76329.644.54$12,665
Jul 2000143,64728.534.09$15,315
Jun 200074,71129.304.40$20,921
May 200062,65027.263.68$9,915
Apr 200054,67924.513.12$14,702
Mar 200035,34928.422.86$15,382
Feb 200035,44827.622.73$14,937
Jan 200036,19525.272.48$15,443
Dec 199946,99624.282.42$17,053
Nov 1999297,71423.192.43$19,448
Oct 199965,68320.982.80$16,059
Sep 1999177,68521.752.62$20,496
Aug 1999710,47319.262.88$30,251
Jul 19993710,23917.892.37$24,953
Jun 19991818,17015.942.36$43,206
May 199938423,11515.792.32$59,714
Apr 199945627,06115.102.21$66,638

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Oct 2019 — as filed, then multipliedworked
Condensate             3 bbl  × $ 53.47 =       $160
Gas                    0 Mcf  × $  2.42 =         $0

────────────────────────────────────────────────────
Month total                                     $160

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 03/G/173112 is the state's own key, not one this site invented.