HASTEDT, EMMA 'B'

Operated by STRAND ENERGY, L.C. (P-5 824758) in the COLUMBUS (CONSOLIDATED) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 174932District 03Field 19837005CondensateGasSaveExport
Value, all time
$2.0 M
Oct 1999 – Aug 2018
Value, last 12 filed months
$95 k
at the published price for each month
Months reported
227
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 70 leases and 110 wells, and the rule below applies to all of them.

Discovered
2001-08-21
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2001-08-21.

The Commission's schedule remark for this field reads: WHICH IS SUSPENDED.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition11,521 bbl$407,668
GasProduction372,313 Mcf$1,543,055
Total$1,950,723

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 29.7763, -96.5491. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

29.77632, -96.54913 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
9,150 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 9,150 ft.

Completions filed
Aug 2022
1 of 1 wells

1 well

42-08932165189,150 ftAug 2022Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (227)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

227 months

Aug 20180059.403.07$0
Jul 20180065.142.93$0
Jun 20180060.183.08$0
May 20180065.382.90$0
Apr 20180063.842.90$0
Mar 2018141061.222.79$8,632
Feb 2018981,70061.782.77$10,757
Jan 20181751,51662.874.01$17,080
Dec 20172711,05557.272.92$18,602
Nov 20171511,05155.423.12$11,646
Oct 20172131,28749.292.98$14,339
Sep 201724570647.523.09$13,822
Aug 201712577645.373.00$8,003
Jul 20173291,61143.873.09$19,407
Jun 20175427542.493.09$3,143
May 20171132,05045.373.26$11,817
Apr 2017822,05547.933.21$10,530
Mar 2017972,81246.772.98$12,927
Feb 20171353,43350.452.95$16,947
Jan 2017264,55849.413.42$16,868
Dec 20160048.763.72$0
Nov 20160042.492.64$0
Oct 20160046.193.09$0
Sep 20160041.553.10$0
Aug 20160041.442.92$0
Jul 20160041.622.92$0
Jun 20160045.352.69$0
May 20160042.521.99$0
Apr 20160036.561.99$0
Mar 20160033.011.79$0
Feb 20160026.472.06$0
Jan 20160027.352.36$0
Dec 20150032.362.00$0
Nov 20150038.792.17$0
Oct 20150043.552.43$0
Sep 20150042.992.76$0
Aug 20150040.162.87$0
Jul 20150048.152.95$0
Jun 20150056.152.88$0
May 20150055.212.96$0
Apr 20150049.822.71$0
Mar 20150042.892.93$0
Feb 20150044.662.98$0
Jan 20150043.433.10$0
Dec 20140054.693.59$0
Nov 20140070.464.25$0
Oct 20140078.303.90$0
Sep 20140086.164.05$0
Aug 20140089.394.04$0
Jul 20140096.564.18$0
Jun 20140098.164.74$0
May 20140094.734.73$0
Apr 20140095.944.81$0
Mar 20140095.895.06$0
Feb 20140097.406.19$0
Jan 20140090.404.86$0
Dec 20130091.824.35$0
Nov 20130088.853.74$0
Oct 20130097.423.78$0
Sep 201300104.113.72$0
Aug 201300104.253.52$0
Jul 201300102.523.72$0
Jun 20130094.403.93$0
May 20130094.834.15$0
Apr 20131093.964.28$94
Mar 20130093.623.91$0
Feb 20130091.233.42$0
Jan 20130091.603.42$0
Dec 20120086.773.42$0
Nov 20120086.953.62$0
Oct 20120089.383.40$0
Sep 20120094.672.92$0
Aug 20120092.662.91$0
Jul 20120085.133.02$0
Jun 20120079.822.52$0
May 20120091.612.49$0
Apr 201200101.652.00$0
Mar 201200105.052.22$0
Feb 201200101.102.57$0
Jan 20120098.092.73$0
Dec 20110096.873.24$0
Nov 20110095.723.31$0
Oct 20110084.983.65$0
Sep 20110083.623.99$0
Aug 20110083.404.15$0
Jul 20110094.144.52$0
Jun 20110092.904.64$0
May 20110098.134.40$0
Apr 201100105.964.33$0
Mar 20110096.364.06$0
Feb 20110085.644.18$0
Jan 20110086.504.59$0
Dec 20100085.734.35$0
Nov 20100080.843.80$0
Oct 20100078.103.51$0
Sep 20100072.633.98$0
Aug 20100073.684.42$0
Jul 20100072.554.74$0
Jun 20100070.364.91$0
May 20100071.124.24$0
Apr 20100081.694.12$0
Mar 20100078.394.39$0
Feb 20100073.585.44$0
Jan 20100074.365.96$0
Dec 20090071.445.48$0
Nov 20090074.593.75$0
Oct 20090072.544.11$0
Sep 20090065.543.06$0
Aug 20090067.423.22$0
Jul 20090061.133.46$0
Jun 20092066.163.90$132
May 20091054.743.93$55
Apr 20091046.773.59$47
Mar 20091042.144.06$42
Feb 20092032.814.63$66
Jan 20094035.865.37$143
Dec 20085037.105.98$186
Nov 20080055.496.86$0
Oct 20088075.246.92$602
Sep 200800101.767.88$0
Aug 200860114.228.48$685
Jul 200880131.0811.39$1,049
Jun 2008240131.3313.03$3,152
May 200800123.1711.57$0
Apr 2008190110.3110.45$2,096
Mar 2008440101.909.66$4,484
Feb 20080092.538.77$0
Jan 200879090.388.21$7,140
Dec 200753088.337.30$4,681
Nov 20077312891.677.29$7,625
Oct 200726815382.856.92$23,263
Sep 2007015475.846.24$962
Aug 200702869.066.39$179
Jul 20071177970.906.39$8,800
Jun 20076519762.007.55$5,517
May 20079922958.747.85$7,612
Apr 20070059.617.81$0
Mar 20070056.927.30$0
Feb 20070055.108.22$0
Jan 20070050.306.73$0
Dec 20063356.656.92$191
Nov 20065054.207.62$271
Oct 200676154.906.01$751
Sep 20060060.085.04$0
Aug 20060968.717.34$66
Jul 200604869.376.34$304
Jun 20060066.286.38$0
May 20060066.016.42$0
Apr 200605064.397.36$368
Mar 20060056.707.08$0
Feb 20060057.597.75$0
Jan 20060060.598.93$0
Dec 20050054.9413.42$0
Nov 20050054.6910.59$0
Oct 20050058.3413.80$0
Sep 20050061.4512.08$0
Aug 200509361.519.80$911
Jul 20050055.697.84$0
Jun 20051052.337.38$52
May 2005111245.226.65$790
Apr 20054049.207.36$197
Mar 200586750.377.15$882
Feb 2005010545.226.31$663
Jan 200504543.166.32$285
Dec 20040039.866.75$0
Nov 20040045.286.33$0
Oct 20040049.706.52$0
Sep 200406543.245.28$343
Aug 20040042.375.55$0
Jul 200405838.286.08$353
Jun 200405036.106.43$322
May 200417237.486.49$505
Apr 200432034.475.86$221
Mar 200454034.365.53$1,855
Feb 2004661,36632.455.51$9,668
Jan 20041283,98532.036.30$29,204
Dec 2003674,04730.266.30$27,530
Nov 20031133,93528.804.60$21,336
Oct 20031044,28128.174.76$23,306
Sep 20031054,09426.314.75$22,206
Aug 2003683,85629.765.13$21,804
Jul 20031023,92529.415.17$23,295
Jun 20031054,11928.565.98$27,643
May 2003764,41426.595.97$28,384
Apr 20031474,52426.675.41$28,383
Mar 2003804,65231.146.10$30,850
Feb 20031134,33333.487.93$38,126
Jan 20031045,25730.315.58$32,497
Dec 20021164,61426.914.85$25,517
Nov 20021134,75624.664.14$22,462
Oct 2002324,50726.464.23$19,907
Sep 2002541,21727.443.64$5,906
Aug 2002855,04625.963.16$18,173
Jul 2002865,41724.583.06$18,699
Jun 2002935,40823.733.34$20,260
May 20021065,06824.663.58$20,778
Apr 20021624,52123.653.51$19,711
Mar 20021245,65522.003.10$20,274
Feb 20021675,41118.222.38$15,898
Jan 20021705,80717.172.38$16,714
Dec 20011835,47016.932.36$16,031
Nov 20011254,88318.072.41$14,005
Oct 20011507,01219.782.53$20,700
Sep 20011006,39624.262.25$16,825
Aug 2001392,25924.873.05$7,867
Jul 2001843,65123.933.20$13,683
Jun 20011325,27824.563.82$23,426
May 20011885,77125.524.31$29,655
Apr 20011576,09424.685.34$36,388
Mar 20011927,81324.545.38$46,718
Feb 20011557,15227.755.77$45,547
Jan 20012398,87027.478.40$81,062
Dec 20002079,19926.889.12$89,482
Nov 20001369,29632.215.66$56,977
Oct 20001959,30131.235.15$53,948
Sep 20001599,11931.875.19$52,363
Aug 20001689,11829.644.54$46,382
Jul 20001448,60128.534.09$39,284
Jun 20002589,59229.304.40$49,738
May 200031611,92227.263.68$52,484
Apr 200041416,36924.513.12$61,153
Mar 200036814,14228.422.86$50,901
Feb 200036114,93127.622.73$50,680
Jan 200050018,68125.272.48$58,973
Dec 199952315,68924.282.42$50,724
Nov 1999613,55823.192.43$10,075
Oct 1999591,22020.982.80$4,658

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Mar 2018 — as filed, then multipliedworked
Condensate           141 bbl  × $ 61.22 =     $8,632
Gas                    0 Mcf  × $  2.79 =         $0

────────────────────────────────────────────────────
Month total                                   $8,632

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 03/G/174932 is the state's own key, not one this site invented.