HURR UNIT

Operated by AMERICAN ENERGY PARTNERS, INC. (P-5 18046) in the GARWOOD (MIOCENE 1850) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 176794District 03Field 34090261GasSaveExport
Value, all time
$2.0 M
Mar 2000 – Mar 2008
Value, last 12 filed months
$69 k
at the published price for each month
Months reported
97
no gaps in the span
Streams
1
gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 2 leases and 2 wells, and the rule below applies to all of them.

Discovered
1979-12-21
as the register files it
Field class
Gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

The Commission's schedule remark for this field reads: ALLOCATION FORMULA EFF. 7-1-80 PER AMENDMENT TO SWR 28 & 29

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
GasProduction390,612 Mcf$2,024,561
Total$2,024,561

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 29.4582, -96.5690. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

29.45816, -96.56903 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
3,600 ft
1 wells filed one
Completion to plug
8.0 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 3,600 ft.

Completions filed
Mar 2000
1 of 1 wells
Plug dates filed
Mar 2008
1 of 1 wells

Last completion to plug: a median of 8.0 years across the 1 well that filed both dates, with the middle half between 8.0 years and 8.0 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-0893215313,600 ftMar 2000Mar 2008Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (97)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

97 months

Mar 20080101.909.66$0
Feb 200847792.538.77$4,184
Jan 200833290.388.21$2,724
Dec 200788088.337.30$6,426
Nov 200793291.677.29$6,796
Oct 20071,05782.856.92$7,317
Sep 20071,04375.846.24$6,513
Aug 200792869.066.39$5,928
Jul 20071,05570.906.39$6,739
Jun 200791062.007.55$6,869
May 200790058.747.85$7,062
Apr 20071,03859.617.81$8,102
Mar 20071,26956.927.30$9,266
Feb 20071,28955.108.22$10,590
Jan 20071,64450.306.73$11,059
Dec 20061,59956.656.92$11,063
Nov 20061,65554.207.62$12,607
Oct 20061,35254.906.01$8,131
Sep 20062,00060.085.04$10,074
Aug 20061,97568.717.34$14,496
Jul 20061,86369.376.34$11,817
Jun 20061,66966.286.38$10,655
May 20061,99066.016.42$12,786
Apr 20062,02764.397.36$14,920
Mar 20062,18656.707.08$15,483
Feb 20062,17157.597.75$16,828
Jan 20062,29360.598.93$20,484
Dec 20052,26354.9413.42$30,359
Nov 20052,36054.6910.59$24,989
Oct 20052,43658.3413.80$33,606
Sep 20051,80761.4512.08$21,827
Aug 20052,72861.519.80$26,726
Jul 20052,29955.697.84$18,033
Jun 20052,51452.337.38$18,556
May 20052,95345.226.65$19,641
Apr 20052,84349.207.36$20,926
Mar 20052,81150.377.15$20,112
Feb 20052,66345.226.31$16,809
Jan 20053,03143.166.32$19,163
Dec 20043,19739.866.75$21,583
Nov 20043,24045.286.33$20,511
Oct 20043,46449.706.52$22,568
Sep 20043,10743.245.28$16,417
Aug 20043,63042.375.55$20,149
Jul 20043,18438.286.08$19,372
Jun 20042,91536.106.43$18,752
May 20043,40237.486.49$22,095
Apr 20043,31934.475.86$19,444
Mar 20043,43134.365.53$18,974
Feb 20043,03432.455.51$16,716
Jan 20043,20132.036.30$20,165
Dec 20033,37230.266.30$21,249
Nov 20033,52628.804.60$16,203
Oct 20033,59828.174.76$17,125
Sep 20033,71726.314.75$17,653
Aug 20034,03629.765.13$20,704
Jul 20032,68429.415.17$13,879
Jun 20033,67528.565.98$21,987
May 20034,73726.595.97$28,293
Apr 20034,85626.675.41$26,258
Mar 20035,21831.146.10$31,809
Feb 20034,05533.487.93$32,139
Jan 20034,75530.315.58$26,543
Dec 20025,07626.914.85$24,638
Nov 20024,66024.664.14$19,278
Oct 20024,46226.464.23$18,870
Sep 20024,86827.443.64$17,696
Aug 20023,96925.963.16$12,559
Jul 20024,98324.583.06$15,257
Jun 20024,62723.733.34$15,446
May 20024,82324.663.58$17,286
Apr 20024,88423.653.51$17,154
Mar 20025,08122.003.10$15,765
Feb 20025,67018.222.38$13,470
Jan 20025,67017.172.38$13,470
Dec 20016,46316.932.36$15,281
Nov 20017,21718.072.41$17,361
Oct 20016,34319.782.53$16,041
Sep 20016,25024.262.25$14,071
Aug 20017,82724.873.05$23,897
Jul 20018,24923.933.20$26,373
Jun 20018,86524.563.82$33,901
May 20019,47025.524.31$40,790
Apr 20018,24524.685.34$43,990
Mar 20019,60324.545.38$51,630
Feb 20015,67027.755.77$32,699
Jan 20015,67027.478.40$47,621
Dec 20008,98126.889.12$81,929
Nov 20008,97332.215.66$50,769
Oct 20007,64631.235.15$39,342
Sep 20009,25231.875.19$47,986
Aug 20009,30129.644.54$42,234
Jul 20006,73028.534.09$27,524
Jun 20009,81729.304.40$43,168
May 20009,71627.263.68$35,752
Apr 200010,04524.513.12$31,300
Mar 20006,91128.422.86$19,764

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Feb 2008 — as filed, then multipliedworked
Gas                  477 Mcf  × $  8.77 =     $4,184

────────────────────────────────────────────────────
Month total                                   $4,184

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 03/G/176794 is the state's own key, not one this site invented.