O'BRIEN

Operated by MAGNUM PRODUCING, LP (P-5 521516) in the LOVELLS LAKE, N. (7800) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 179047District 03Field 55186852CondensateGasSaveExport
Value, all time
$3.2 M
Jun 2000 – Feb 2015
Value, last 12 filed months
$0
at the published price for each month
Months reported
177
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 8 leases and 8 wells, and the rule below applies to all of them.

Discovered
1953-08-09
as the register files it
Field class
Gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

The Commission's schedule remark for this field reads: AOF-1 AND AOF-2 EFFECTIVE 05/01/2000.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition5,639 bbl$145,964
GasProduction591,748 Mcf$3,083,325
Total$3,229,289

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 29.9703, -94.1665. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

29.97031, -94.16650 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
9,400 ft
1 wells filed one
Completion to plug
14.7 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 9,400 ft.

Completions filed
Jun 2000
1 of 1 wells
Plug dates filed
Feb 2015
1 of 1 wells

Last completion to plug: a median of 14.7 years across the 1 well that filed both dates, with the middle half between 14.7 years and 14.7 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-2453224919,400 ftJun 2000Feb 2015Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (177)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

177 months

Feb 20150044.662.98$0
Jan 20150043.433.10$0
Dec 20140054.693.59$0
Nov 20140070.464.25$0
Oct 20140078.303.90$0
Sep 20140086.164.05$0
Aug 20140089.394.04$0
Jul 20140096.564.18$0
Jun 20140098.164.74$0
May 20140094.734.73$0
Apr 20140095.944.81$0
Mar 20140095.895.06$0
Feb 20140097.406.19$0
Jan 20140090.404.86$0
Dec 20130091.824.35$0
Nov 20130088.853.74$0
Oct 20130097.423.78$0
Sep 201300104.113.72$0
Aug 201300104.253.52$0
Jul 201300102.523.72$0
Jun 20130094.403.93$0
May 20130094.834.15$0
Apr 20130093.964.28$0
Mar 20130093.623.91$0
Feb 20130091.233.42$0
Jan 20130091.603.42$0
Dec 20120086.773.42$0
Nov 20120086.953.62$0
Oct 20120089.383.40$0
Sep 20120094.672.92$0
Aug 20120092.662.91$0
Jul 20120085.133.02$0
Jun 20120079.822.52$0
May 20120091.612.49$0
Apr 201200101.652.00$0
Mar 201200105.052.22$0
Feb 201200101.102.57$0
Jan 2012020498.092.73$558
Dec 2011030296.873.24$978
Nov 20110095.723.31$0
Oct 2011019684.983.65$715
Sep 20110083.623.99$0
Aug 2011017683.404.15$730
Jul 20110094.144.52$0
Jun 201103892.904.64$176
May 2011020798.134.40$912
Apr 201100105.964.33$0
Mar 2011023596.364.06$953
Feb 20110085.644.18$0
Jan 20110086.504.59$0
Dec 20100085.734.35$0
Nov 2010027280.843.80$1,032
Oct 20100078.103.51$0
Sep 20100072.633.98$0
Aug 20100073.684.42$0
Jul 201031,24772.554.74$6,124
Jun 201039870.364.91$692
May 201004,07771.124.24$17,267
Apr 20100081.694.12$0
Mar 2010010778.394.39$470
Feb 20100073.585.44$0
Jan 2010111074.365.96$730
Dec 2009326971.445.48$1,689
Nov 20090074.593.75$0
Oct 2009115672.544.11$714
Sep 20090065.543.06$0
Aug 20090067.423.22$0
Jul 2009441761.133.46$1,689
Jun 20090066.163.90$0
May 2009043954.743.93$1,723
Apr 20090046.773.59$0
Mar 2009734442.144.06$1,691
Feb 20093332.814.63$112
Jan 20090035.865.37$0
Dec 2008167237.105.98$4,054
Nov 200811,25155.496.86$8,638
Oct 20080075.246.92$0
Sep 200811,134101.767.88$9,034
Aug 200811,313114.228.48$11,252
Jul 200800131.0811.39$0
Jun 20080491131.3313.03$6,399
May 200800123.1711.57$0
Apr 20083530110.3110.45$5,872
Mar 20080249101.909.66$2,406
Feb 200809892.538.77$860
Jan 2008336490.388.21$3,258
Dec 20070088.337.30$0
Nov 20070091.677.29$0
Oct 20070082.856.92$0
Sep 20070075.846.24$0
Aug 2007274469.066.39$4,891
Jul 20070070.906.39$0
Jun 2007037962.007.55$2,861
May 2007271058.747.85$5,688
Apr 20070059.617.81$0
Mar 2007531856.927.30$2,607
Feb 20070055.108.22$0
Jan 2007368250.306.73$4,739
Dec 20060056.656.92$0
Nov 2006114354.207.62$1,144
Oct 20060054.906.01$0
Sep 20061646460.085.04$3,299
Aug 20060068.717.34$0
Jul 2006236569.376.34$2,454
Jun 20060066.286.38$0
May 2006173066.016.42$4,756
Apr 20060064.397.36$0
Mar 200601,35856.707.08$9,619
Feb 20060057.597.75$0
Jan 2006613,33960.598.93$33,524
Dec 2005485,14754.9413.42$71,686
Nov 200511,22054.6910.59$12,973
Oct 20050058.3413.80$0
Sep 2005339,34961.4512.08$114,954
Aug 2005299861.519.80$9,900
Jul 2005150255.697.84$3,993
Jun 20050052.337.38$0
May 20050045.226.65$0
Apr 20050049.207.36$0
Mar 200502450.377.15$172
Feb 200514045.226.31$298
Jan 2005019143.166.32$1,208
Dec 200406639.866.75$446
Nov 2004016845.286.33$1,064
Oct 2004012049.706.52$782
Sep 2004017243.245.28$909
Aug 200408942.375.55$494
Jul 2004013938.286.08$846
Jun 2004010336.106.43$663
May 2004010437.486.49$675
Apr 2004019834.475.86$1,160
Mar 2004116234.365.53$930
Feb 2004050232.455.51$2,766
Jan 2004016732.036.30$1,052
Dec 200302430.266.30$151
Nov 2003163428.804.60$617
Oct 20030928.174.76$43
Sep 20030426.314.75$19
Aug 200302229.765.13$113
Jul 20030929.415.17$47
Jun 20030628.565.98$36
May 2003018226.595.97$1,087
Apr 2003025826.675.41$1,395
Mar 2003022231.146.10$1,353
Feb 2003270233.487.93$5,631
Jan 200316330.315.58$382
Dec 200214893926.914.85$8,540
Nov 200246,10124.664.14$25,338
Oct 20022226,28526.464.23$32,454
Sep 2002116,42827.443.64$23,669
Aug 20022084,38225.963.16$19,265
Jul 20022286,66624.583.06$26,014
Jun 2002336,97823.733.34$24,077
May 20022318,65724.663.58$36,723
Apr 20021997,33323.653.51$30,462
Mar 20022089,65722.003.10$34,539
Feb 2002279,08318.222.38$22,070
Jan 200220610,26517.172.38$27,923
Dec 200121210,89316.932.36$29,345
Nov 200121511,66718.072.41$31,950
Oct 200120111,82819.782.53$33,887
Sep 20011909,72024.262.25$26,492
Aug 200121314,16124.873.05$48,533
Jul 200125825,16323.933.20$86,622
Jun 200143138,53124.563.82$157,934
May 200130443,22725.524.31$193,951
Apr 200139637,59024.685.34$210,328
Mar 200126641,68124.545.38$230,623
Feb 20019639,71827.755.77$231,721
Jan 200127238,30227.478.40$329,161
Dec 200019635,88926.889.12$332,666
Nov 200043028,75232.215.66$176,529
Oct 2000050,86831.235.15$261,741
Sep 2000024,47231.875.19$126,924
Aug 20000029.644.54$0
Jul 20000028.534.09$0
Jun 200001,28529.304.40$5,650

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jan 2012 — as filed, then multipliedworked
Condensate             0 bbl  × $ 98.09 =         $0
Gas                  204 Mcf  × $  2.73 =       $558

────────────────────────────────────────────────────
Month total                                     $558

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 03/G/179047 is the state's own key, not one this site invented.