GIESENSCHLAG-HENSZ UNIT

Operated by SILVER OAK OPERATING, LLC (P-5 781872) in the CALDWELL (AUSTIN CHALK) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 180835District 03Field 14710500CondensateGasSaveExport
Value, all time
$426 k
Jan 2001 – Aug 2012
Value, last 12 filed months
$31 k
at the published price for each month
Months reported
140
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 256 leases and 330 wells, and the rule below applies to all of them.

Discovered
1978-06-29
as the register files it
Field class
Oil and gas
the register's own label
Between wells
1,200 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 80 acres. The field rule took effect on 1991-11-25.

The Commission's schedule remark for this field reads: PER DOCKET 3-97101 EFF 11-25-91, PERM RULES. 80 ACRE OPT/3250 DIAG

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition807 bbl$52,717
GasProduction67,678 Mcf$372,792
Total$425,509

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.4702, -96.5463. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.47023, -96.54634 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
10,794 ft
1 wells filed one
Completion to plug
21.8 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 10,794 ft.

Completions filed
Jul 1990
1 of 1 wells
Plug dates filed
Apr 2012
1 of 1 wells

Last completion to plug: a median of 21.8 years across the 1 well that filed both dates, with the middle half between 21.8 years and 21.8 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-05133065110,794 ftJul 1990Apr 2012Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (140)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

140 months

Aug 20120092.662.91$0
Jul 20120085.133.02$0
Jun 20120079.822.52$0
May 2012169091.612.49$15,482
Apr 201200101.652.00$0
Mar 20120153105.052.22$340
Feb 20120100101.102.57$257
Jan 201208898.092.73$241
Dec 201106296.873.24$201
Nov 2011012495.723.31$411
Oct 2011013984.983.65$507
Sep 201115513683.623.99$13,503
Aug 2011011583.404.15$477
Jul 2011013494.144.52$605
Jun 2011013492.904.64$622
May 201109498.134.40$414
Apr 20110112105.964.33$485
Mar 201109896.364.06$398
Feb 201109385.644.18$389
Jan 2011013286.504.59$606
Dec 2010022685.734.35$983
Nov 201009080.843.80$342
Oct 2010010278.103.51$358
Sep 2010018872.633.98$748
Aug 2010014973.684.42$658
Jul 2010012872.554.74$606
Jun 2010014370.364.91$702
May 201005571.124.24$233
Apr 201008881.694.12$363
Mar 2010010178.394.39$443
Feb 201006573.585.44$354
Jan 2010013374.365.96$793
Dec 2009013471.445.48$735
Nov 2009010874.593.75$405
Oct 2009018372.544.11$752
Sep 2009020965.543.06$641
Aug 200917424567.423.22$12,520
Jul 2009023861.133.46$825
Jun 2009015066.163.90$584
May 2009022254.743.93$872
Apr 200917226046.773.59$8,977
Mar 2009041942.144.06$1,701
Feb 200913624532.814.63$5,597
Jan 2009133835.865.37$1,851
Dec 2008031037.105.98$1,853
Nov 2008030355.496.86$2,079
Oct 2008024475.246.92$1,689
Sep 20080287101.767.88$2,261
Aug 20080368114.228.48$3,122
Jul 20080206131.0811.39$2,346
Jun 2008070131.3313.03$912
May 20080143123.1711.57$1,655
Apr 20080218110.3110.45$2,279
Mar 20080213101.909.66$2,058
Feb 2008020492.538.77$1,789
Jan 200801590.388.21$123
Dec 200703388.337.30$241
Nov 200705091.677.29$365
Oct 200704482.856.92$305
Sep 200703675.846.24$225
Aug 200707269.066.39$460
Jul 200705670.906.39$358
Jun 200706562.007.55$491
May 20070558.747.85$39
Apr 20070059.617.81$0
Mar 20070056.927.30$0
Feb 200702855.108.22$230
Jan 200703550.306.73$235
Dec 200602956.656.92$201
Nov 200608454.207.62$640
Oct 2006013054.906.01$782
Sep 200607160.085.04$358
Aug 2006015168.717.34$1,108
Jul 2006012769.376.34$806
Jun 2006015966.286.38$1,015
May 2006084566.016.42$5,429
Apr 2006077564.397.36$5,704
Mar 2006031556.707.08$2,231
Feb 2006018257.597.75$1,411
Jan 2006030960.598.93$2,760
Dec 200501,07754.9413.42$14,448
Nov 200501,64254.6910.59$17,386
Oct 200501,05458.3413.80$14,541
Sep 2005091961.4512.08$11,101
Aug 2005071961.519.80$7,044
Jul 2005048455.697.84$3,796
Jun 2005046652.337.38$3,440
May 2005027045.226.65$1,796
Apr 2005026249.207.36$1,928
Mar 2005043650.377.15$3,120
Feb 2005033445.226.31$2,108
Jan 2005090043.166.32$5,690
Dec 2004091539.866.75$6,177
Nov 2004082645.286.33$5,229
Oct 2004088149.706.52$5,740
Sep 2004080843.245.28$4,269
Aug 2004098742.375.55$5,479
Jul 2004046038.286.08$2,799
Jun 2004032636.106.43$2,097
May 2004048037.486.49$3,117
Apr 2004028034.475.86$1,640
Mar 2004028334.365.53$1,565
Feb 2004043332.455.51$2,386
Jan 2004043832.036.30$2,759
Dec 2003072830.266.30$4,588
Nov 2003035528.804.60$1,631
Oct 2003093028.174.76$4,426
Sep 200301,46326.314.75$6,948
Aug 200301,68129.765.13$8,623
Jul 200301,45429.415.17$7,518
Jun 200301,43328.565.98$8,574
May 200301,39826.595.97$8,350
Apr 200301,68626.675.41$9,117
Mar 200301,61031.146.10$9,815
Feb 2003081433.487.93$6,452
Jan 2003080230.315.58$4,477
Dec 2002078126.914.85$3,791
Nov 2002081324.664.14$3,363
Oct 2002078526.464.23$3,320
Sep 200201,05427.443.64$3,832
Aug 200201,26425.963.16$4,000
Jul 200201,30024.583.06$3,980
Jun 200201,29123.733.34$4,310
May 200201,38324.663.58$4,957
Apr 200201,29423.653.51$4,545
Mar 200201,46822.003.10$4,555
Feb 200201,61918.222.38$3,846
Jan 200201,57217.172.38$3,735
Dec 2001058216.932.36$1,376
Nov 2001096818.072.41$2,329
Oct 2001099919.782.53$2,526
Sep 2001093524.262.25$2,105
Aug 200101,24124.873.05$3,789
Jul 200101,13423.933.20$3,625
Jun 2001086424.563.82$3,304
May 200101,07225.524.31$4,617
Apr 200101,00224.685.34$5,346
Mar 2001094924.545.38$5,102
Feb 2001049027.755.77$2,826
Jan 2001066927.478.40$5,619

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2012 — as filed, then multipliedworked
Condensate           169 bbl  × $ 91.61 =    $15,482
Gas                    0 Mcf  × $  2.49 =         $0

────────────────────────────────────────────────────
Month total                                  $15,482

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 03/G/180835 is the state's own key, not one this site invented.