CRANEK GAS UNIT

Operated by CHEVRON MIDCONTINENT, L.P. (P-5 147862) in the MENEFEE (YEGUA 9950 SD) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 181998District 03Field 60476980CondensateGasSaveExport
Value, all time
$3.7 M
Jan 2001 – Oct 2007
Value, last 12 filed months
$4 k
at the published price for each month
Months reported
82
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 1 leases and 1 wells, and the rule below applies to all of them.

Discovered
2001-01-25
as the register files it
Field class
Gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

The Commission's schedule remark for this field reads: CANCEL OVERAGE FOR PURE RESOURCES LP CRANEK GAS UNIT #B-1 WELL.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition32,136 bbl$966,787
GasProduction532,567 Mcf$2,707,313
Total$3,674,100

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 29.1104, -96.4530. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

29.11043, -96.45304 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
10,500 ft
1 wells filed one
Completion to plug
6.8 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 10,500 ft.

Completions filed
Jan 2001
1 of 1 wells
Plug dates filed
Nov 2007
1 of 1 wells

Last completion to plug: a median of 6.8 years across the 1 well that filed both dates, with the middle half between 6.8 years and 6.8 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-48134287B 110,500 ftJan 2001Nov 2007Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (82)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

82 months

Oct 20070082.856.92$0
Sep 20070075.846.24$0
Aug 20070069.066.39$0
Jul 20070070.906.39$0
Jun 20070062.007.55$0
May 200767058.747.85$3,936
Apr 20070059.617.81$0
Mar 20070056.927.30$0
Feb 20070055.108.22$0
Jan 20070050.306.73$0
Dec 20060056.656.92$0
Nov 20060054.207.62$0
Oct 20060054.906.01$0
Sep 20060060.085.04$0
Aug 20060068.717.34$0
Jul 2006046469.376.34$2,943
Jun 20061751,86266.286.38$23,486
May 200602,00566.016.42$12,882
Apr 200602,36564.397.36$17,408
Mar 20061882,69356.707.08$29,734
Feb 20063643,10857.597.75$45,053
Jan 20061693,60560.598.93$42,444
Dec 20053583,51654.9413.42$66,837
Nov 20051793,79654.6910.59$49,983
Oct 20053574,36958.3413.80$81,101
Sep 20051744,40961.4512.08$63,949
Aug 20053585,18561.519.80$72,817
Jul 20051775,12455.697.84$50,048
Jun 20053595,84052.337.38$61,892
May 20053516,76045.226.65$60,834
Apr 20055407,54449.207.36$82,095
Mar 20051828,13250.377.15$67,351
Feb 20053675,60945.226.31$51,999
Jan 20051826,33843.166.32$47,925
Dec 20043715,83339.866.75$54,167
Nov 2004024045.286.33$1,519
Oct 200436925749.706.52$20,014
Sep 20041824,04143.245.28$29,222
Aug 200404,47242.375.55$24,823
Jul 20043754,47238.286.08$41,563
Jun 200405,19336.106.43$33,407
May 20041795,18737.486.49$40,396
Apr 20043355,73734.475.86$45,157
Mar 20041856,24934.365.53$40,914
Feb 20041855,38432.455.51$35,667
Jan 20047486,20132.036.30$63,023
Dec 20031907,08130.266.30$50,371
Nov 20033687,04728.804.60$42,980
Oct 20031948,06628.174.76$43,856
Sep 20033607,52526.314.75$45,211
Aug 20035448,92729.765.13$61,982
Jul 20033589,80029.415.17$61,203
Jun 20033489,18528.565.98$64,892
May 20035318,57526.595.97$65,335
Apr 20031834,79026.675.41$30,781
Mar 20037396,86931.146.10$64,886
Feb 20035605,94933.487.93$65,900
Jan 20035305,76930.315.58$48,267
Dec 20023924,01226.914.85$30,022
Nov 20023596,39424.664.14$35,305
Oct 20023777,74026.464.23$42,709
Sep 20021846,26127.443.64$27,809
Aug 20025717,97425.963.16$40,054
Jul 20021826,78424.583.06$25,245
Jun 20023636,58223.733.34$30,586
May 20025576,70424.663.58$37,763
Apr 20022174,52023.653.51$21,008
Mar 20025516,37822.003.10$31,911
Feb 20028858,41018.222.38$36,104
Jan 200251710,76617.172.38$34,453
Dec 200180510,94416.932.36$39,505
Nov 200173410,83218.072.41$39,320
Oct 20011,02113,73319.782.53$54,924
Sep 200197314,01424.262.25$55,155
Aug 20011,48417,10924.873.05$89,144
Jul 20011,37824,45823.933.20$111,170
Jun 20011,43125,44124.563.82$132,436
May 20011,40920,52325.524.31$124,357
Apr 20011,43219,10624.685.34$137,278
Mar 20012,33431,72824.545.38$227,860
Feb 20011,59934,91327.755.77$245,718
Jan 200101,66827.478.40$14,009

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2007 — as filed, then multipliedworked
Condensate            67 bbl  × $ 58.74 =     $3,936
Gas                    0 Mcf  × $  7.85 =         $0

────────────────────────────────────────────────────
Month total                                   $3,936

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 03/G/181998 is the state's own key, not one this site invented.