SVOBODA

Operated by F-W OIL INTERESTS, INC. (P-5 257599) in the SVOBODA (MIOCENE) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 182368District 03Field 87433250CondensateGasSaveExport
Value, all time
$2.5 M
Nov 2000 – Dec 2006
Value, last 12 filed months
$121 k
at the published price for each month
Months reported
74
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 1 leases and 1 wells, and the rule below applies to all of them.

Discovered
2001-01-16
as the register files it
Field class
Gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

The Commission's schedule remark for this field reads: FIELD ADMINISTRATIVELY BALANCED EFF 6-1-01 PER OPERATOR REQUEST.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition1,339 bbl$39,434
GasProduction501,845 Mcf$2,412,214
Total$2,451,648

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 29.5844, -96.0546. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

29.58436, -96.05457 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
2,901 ft
1 wells filed one
Completion to plug
6.1 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 2,901 ft.

Completions filed
Nov 2000
1 of 1 wells
Plug dates filed
Dec 2006
1 of 1 wells

Last completion to plug: a median of 6.1 years across the 1 well that filed both dates, with the middle half between 6.1 years and 6.1 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-1573212012,901 ftNov 2000Dec 2006Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (74)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

74 months

Dec 20060056.656.92$0
Nov 20060054.207.62$0
Oct 20060054.906.01$0
Sep 20060060.085.04$0
Aug 20060068.717.34$0
Jul 20060069.376.34$0
Jun 200601,05266.286.38$6,716
May 200602,67666.016.42$17,193
Apr 200603,05164.397.36$22,457
Mar 200603,39556.707.08$24,047
Feb 200602,56957.597.75$19,913
Jan 200603,42060.598.93$30,552
Dec 200503,90754.9413.42$52,414
Nov 200504,33354.6910.59$45,880
Oct 200505,54258.3413.80$76,456
Sep 200501,24161.4512.08$14,990
Aug 20051002,91761.519.80$34,728
Jul 200501,92355.697.84$15,083
Jun 200503,07152.337.38$22,667
May 200503,50345.226.65$23,299
Apr 200503,29449.207.36$24,245
Mar 200501,01050.377.15$7,226
Feb 20050045.226.31$0
Jan 20050043.166.32$0
Dec 200401,01939.866.75$6,879
Nov 200401,31245.286.33$8,306
Oct 200405,35749.706.52$34,901
Sep 200403,88443.245.28$20,523
Aug 200404,09642.375.55$22,736
Jul 200406,49538.286.08$39,517
Jun 200406,65636.106.43$42,818
May 200406,56737.486.49$42,650
Apr 200406,41234.475.86$37,564
Mar 2004835,77934.365.53$34,811
Feb 200405,22132.455.51$28,766
Jan 200406,04432.036.30$38,075
Dec 200305,64930.266.30$35,598
Nov 200306,70928.804.60$30,829
Oct 20031118,21428.174.76$42,223
Sep 200308,64026.314.75$41,034
Aug 200309,58929.765.13$49,189
Jul 200309,80729.415.17$50,710
Jun 20031209,47228.565.98$60,098
May 2003010,44126.595.97$62,361
Apr 200308,43926.675.41$45,632
Mar 2003012,12731.146.10$73,927
Feb 200315310,57533.487.93$88,939
Jan 2003012,76130.315.58$71,232
Dec 2002013,85426.914.85$67,244
Nov 200213412,81724.664.14$56,328
Oct 2002014,16726.464.23$59,914
Sep 200215514,11127.443.64$55,550
Aug 2002014,31725.963.16$45,301
Jul 2002014,61424.583.06$44,745
Jun 2002014,52523.733.34$48,488
May 200217713,77624.663.58$53,738
Apr 2002013,67623.653.51$48,034
Mar 2002013,34422.003.10$41,403
Feb 2002012,17818.222.38$28,931
Jan 2002013,19817.172.38$31,354
Dec 2001013,25016.932.36$31,328
Nov 2001013,83618.072.41$33,283
Oct 200114311,93019.782.53$32,998
Sep 2001010,28124.262.25$23,146
Aug 200105,54224.873.05$16,921
Jul 2001013,58723.933.20$43,439
Jun 200116313,03624.563.82$53,855
May 2001013,04425.524.31$56,185
Apr 2001011,86024.685.34$63,277
Mar 2001011,33524.545.38$60,942
Feb 200101,39827.755.77$8,062
Jan 20010027.478.40$0
Dec 20000026.889.12$0
Nov 20000032.215.66$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jun 2006 — as filed, then multipliedworked
Condensate             0 bbl  × $ 66.28 =         $0
Gas                1,052 Mcf  × $  6.38 =     $6,716

────────────────────────────────────────────────────
Month total                                   $6,716

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 03/G/182368 is the state's own key, not one this site invented.