JONES, CARLA

Operated by BRAMMER ENGINEERING, INC. (P-5 88595) in the AMES (HEBERT) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 182381District 03Field 02341215CondensateGasSave
Value, all time
$2.0 M
Dec 2000 – Feb 2004
Value, last 12 filed months
$2 k
at the published price for each month
Months reported
39
no gaps in the span
Streams
2
condensate, gas

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition1,136 bbl$26,408
GasProduction511,995 Mcf$1,928,307
Total$1,954,715

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.0472, -94.7235. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.04716, -94.72353 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
4,714 ft
1 wells filed one
Completion to plug
3.2 years
median over 1 wells

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 4,714 ft.

Completions filed
Dec 2000
1 of 1 wells
Plug dates filed
Feb 2004
1 of 1 wells

Last completion to plug: a median of 3.2 years across the 1 well that filed both dates, with the middle half between 3.2 years and 3.2 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-2913237214,714 ftDec 2000Feb 2004Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (39)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

39 months

Feb 20040032.455.51$0
Jan 20040032.036.30$0
Dec 20030030.266.30$0
Nov 20030028.804.60$0
Oct 20030028.174.76$0
Sep 20030026.314.75$0
Aug 20030029.765.13$0
Jul 200363029.415.17$1,853
Jun 20030028.565.98$0
May 20030026.595.97$0
Apr 20030026.675.41$0
Mar 20030031.146.10$0
Feb 20030033.487.93$0
Jan 20030030.315.58$0
Dec 20020026.914.85$0
Nov 20020024.664.14$0
Oct 20020026.464.23$0
Sep 20020027.443.64$0
Aug 20020025.963.16$0
Jul 2002265124.583.06$2,042
Jun 200210823,88823.733.34$82,307
May 200216545,85424.663.58$168,410
Apr 2002040,43223.653.51$142,010
Mar 20026732,07922.003.10$101,006
Feb 20025819,51418.222.38$47,416
Jan 20026926,06917.172.38$63,116
Dec 20017630,10116.932.36$72,457
Nov 2001022,18218.072.41$53,359
Oct 20019133,79919.782.53$87,274
Sep 20015822,39224.262.25$51,819
Aug 2001026,92424.873.05$82,203
Jul 20014325,09623.933.20$81,263
Jun 20015728,28324.563.82$109,559
May 20016030,61225.524.31$133,387
Apr 20016729,35424.685.34$158,267
Mar 20015223,02424.545.38$125,063
Feb 200110019,62527.755.77$115,954
Jan 2001023,52727.478.40$197,598
Dec 200008,58926.889.12$78,353

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jul 2003 — as filed, then multipliedworked
Condensate            63 bbl  × $ 29.41 =     $1,853
Gas                    0 Mcf  × $  5.17 =         $0

────────────────────────────────────────────────────
Month total                                   $1,853

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 03/G/182381 is the state's own key, not one this site invented.