WINTERMANN "526"

Operated by JAMEX, INC. (P-5 429659) in the MOHAT (YEGUA) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 184408District 03Field 62373600CondensateGasSaveExport
Value, all time
$6.1 M
Jun 2001 – Aug 2009
Value, last 12 filed months
$16 k
at the published price for each month
Months reported
99
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 2 leases and 2 wells, and the rule below applies to all of them.

Discovered
2001-06-22
as the register files it
Field class
Gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

The Commission's schedule remark for this field reads: AOF-1 AND AOF-2 EFFECTIVE 09/01/2002.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition152 bbl$9,305
GasProduction1,346,596 Mcf$6,116,653
Total$6,125,958

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 29.6250, -96.3645. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

29.62498, -96.36455 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
6,600 ft
1 wells filed one
Completion to plug
8.2 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,600 ft.

Completions filed
Jun 2001
1 of 1 wells
Plug dates filed
Aug 2009
1 of 1 wells

Last completion to plug: a median of 8.2 years across the 1 well that filed both dates, with the middle half between 8.2 years and 8.2 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-0893226116,600 ftJun 2001Aug 2009Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (99)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

99 months

Aug 20090067.423.22$0
Jul 2009012061.133.46$416
Jun 200907766.163.90$300
May 200929254.743.93$471
Apr 2009546146.773.59$1,888
Mar 2009054442.144.06$2,208
Feb 20090532.814.63$23
Jan 2009043635.865.37$2,342
Dec 2008422937.105.98$1,517
Nov 2008032555.496.86$2,230
Oct 200801575.246.92$104
Sep 20080516101.767.88$4,065
Aug 20080314114.228.48$2,664
Jul 2008040131.0811.39$456
Jun 20080133131.3313.03$1,733
May 2008067123.1711.57$775
Apr 20080307110.3110.45$3,210
Mar 20080259101.909.66$2,503
Feb 200823892.538.77$518
Jan 2008566590.388.21$5,909
Dec 200701188.337.30$80
Nov 2007526791.677.29$2,405
Oct 200703182.856.92$215
Sep 20074375.846.24$322
Aug 20070569.066.39$32
Jul 2007145170.906.39$1,318
Jun 2007320562.007.55$1,733
May 200736558.747.85$686
Apr 2007623159.617.81$2,161
Mar 2007111856.927.30$919
Feb 20076355.108.22$355
Jan 20071153750.306.73$4,166
Dec 200635656.656.92$557
Nov 2006241754.207.62$3,285
Oct 2006292654.906.01$5,679
Sep 200601160.085.04$55
Aug 20060968.717.34$66
Jul 200668569.376.34$955
Jun 2006121866.286.38$910
May 20061130166.016.42$2,660
Apr 2006035964.397.36$2,642
Mar 2006134256.707.08$2,479
Feb 2006321457.597.75$1,832
Jan 2006134860.598.93$3,169
Dec 2005015454.9413.42$2,066
Nov 2005048154.6910.59$5,093
Oct 2005029758.3413.80$4,097
Sep 2005455661.4512.08$6,962
Aug 20051150361.519.80$5,604
Jul 2005884355.697.84$7,058
Jun 200581,31452.337.38$10,117
May 200501,03445.226.65$6,877
Apr 200511,26649.207.36$9,368
Mar 2005065750.377.15$4,701
Feb 2005034645.226.31$2,184
Jan 2005030743.166.32$1,941
Dec 200406739.866.75$452
Nov 2004019845.286.33$1,253
Oct 2004028449.706.52$1,850
Sep 200411043.245.28$96
Aug 200421,08542.375.55$6,107
Jul 2004033838.286.08$2,056
Jun 20040036.106.43$0
May 20044437.486.49$176
Apr 2004070934.475.86$4,154
Mar 20040034.365.53$0
Feb 2004034632.455.51$1,906
Jan 2004159,59632.036.30$375,465
Dec 2003059,91430.266.30$377,556
Nov 2003056,29828.804.60$258,698
Oct 2003057,94728.174.76$275,807
Sep 2003055,25726.314.75$262,435
Aug 2003056,76129.765.13$291,168
Jul 2003056,86729.415.17$294,050
Jun 2003055,56728.565.98$332,455
May 2003029,29226.595.97$174,952
Apr 2003053,72326.675.41$290,495
Mar 2003053,04431.146.10$323,358
Feb 2003043,26733.487.93$342,929
Jan 2003049,16430.315.58$274,435
Dec 2002049,36226.914.85$239,591
Nov 2002046,68524.664.14$193,134
Oct 2002047,60026.464.23$201,306
Sep 2002034,11627.443.64$124,018
Aug 2002033,82625.963.16$107,031
Jul 2002033,33624.583.06$102,067
Jun 2002032,34123.733.34$107,962
May 2002033,15724.663.58$118,835
Apr 2002032,20423.653.51$113,111
Mar 2002032,78922.003.10$101,735
Feb 2002030,29118.222.38$71,962
Jan 2002033,46517.172.38$79,502
Dec 2001033,21116.932.36$78,524
Nov 2001031,90318.072.41$76,743
Oct 2001032,52419.782.53$82,249
Sep 2001031,88624.262.25$71,786
Aug 2001033,36824.873.05$101,878
Jul 2001031,71923.933.20$101,408
Jun 200106,06124.563.82$23,178

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jul 2009 — as filed, then multipliedworked
Condensate             0 bbl  × $ 61.13 =         $0
Gas                  120 Mcf  × $  3.46 =       $416

────────────────────────────────────────────────────
Month total                                     $416

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 03/G/184408 is the state's own key, not one this site invented.