BAYOU DEVELOPMENT B

Operated by COLUMBUS ENERGY, LLC (P-5 169313) in the DICKINSON (FRIO CONS.) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 193911District 03Field 24674800CondensateGasSaveExport
Value, all time
$1.3 M
Feb 2003 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
280
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 25 leases and 31 wells, and the rule below applies to all of them.

Discovered
2004-08-01
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 10 acres. The field rule took effect on 2004-08-10.

The Commission's schedule remark for this field reads: THAT NO P15 & PRORATION PLAT NEED BE FILED.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition1,127 bbl$46,122
GasProduction205,913 Mcf$1,272,480
Total$1,318,603

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 29.4513, -94.9983. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

29.45131, -94.99830 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
9,750 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 9,750 ft.

Completions filed
Feb 2003
1 of 1 wells

1 well

42-167305893OU9,750 ftFeb 2003

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (280)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

280 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 20200057.252.09$0
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 20190053.472.42$0
Sep 20190055.052.66$0
Aug 20190053.112.30$0
Jul 20190056.272.46$0
Jun 20190052.782.49$0
May 2019037358.482.74$1,022
Apr 2019017262.632.75$473
Mar 2019013256.803.06$404
Feb 2019021750.852.79$606
Jan 20190046.033.23$0
Dec 20180046.594.19$0
Nov 2018011752.934.24$496
Oct 2018017961.443.40$608
Sep 201805559.543.11$171
Aug 20180059.403.07$0
Jul 20180065.142.93$0
Jun 20180060.183.08$0
May 20180065.382.90$0
Apr 2018015463.842.90$447
Mar 2018013461.222.79$373
Feb 2018025361.782.77$700
Jan 20180062.874.01$0
Dec 20170057.272.92$0
Nov 20170055.423.12$0
Oct 20170049.292.98$0
Sep 2017060247.523.09$1,859
Aug 2017098445.373.00$2,956
Jul 201702,30643.873.09$7,119
Jun 201701,82342.493.09$5,628
May 2017012045.373.26$392
Apr 201701,72947.933.21$5,553
Mar 201701,22346.772.98$3,649
Feb 20170050.452.95$0
Jan 20170049.413.42$0
Dec 20160048.763.72$0
Nov 20160042.492.64$0
Oct 20160046.193.09$0
Sep 20160041.553.10$0
Aug 20160041.442.92$0
Jul 20160041.622.92$0
Jun 20160045.352.69$0
May 20160042.521.99$0
Apr 20160036.561.99$0
Mar 20160033.011.79$0
Feb 20160026.472.06$0
Jan 20160027.352.36$0
Dec 20150032.362.00$0
Nov 20150038.792.17$0
Oct 20150043.552.43$0
Sep 20150042.992.76$0
Aug 20150040.162.87$0
Jul 20150048.152.95$0
Jun 20150056.152.88$0
May 20150055.212.96$0
Apr 20150049.822.71$0
Mar 20150042.892.93$0
Feb 20150044.662.98$0
Jan 20150043.433.10$0
Dec 20140054.693.59$0
Nov 20140070.464.25$0
Oct 20140078.303.90$0
Sep 20140086.164.05$0
Aug 20140089.394.04$0
Jul 20140096.564.18$0
Jun 20140098.164.74$0
May 20140094.734.73$0
Apr 20140095.944.81$0
Mar 20140095.895.06$0
Feb 20140097.406.19$0
Jan 20140090.404.86$0
Dec 20130091.824.35$0
Nov 20130088.853.74$0
Oct 20130097.423.78$0
Sep 201300104.113.72$0
Aug 201300104.253.52$0
Jul 201300102.523.72$0
Jun 20130094.403.93$0
May 20130094.834.15$0
Apr 20130093.964.28$0
Mar 20130093.623.91$0
Feb 20130091.233.42$0
Jan 20130091.603.42$0
Dec 20120086.773.42$0
Nov 20120086.953.62$0
Oct 20120089.383.40$0
Sep 20120094.672.92$0
Aug 20120092.662.91$0
Jul 20120085.133.02$0
Jun 20120079.822.52$0
May 20120091.612.49$0
Apr 201200101.652.00$0
Mar 201200105.052.22$0
Feb 201200101.102.57$0
Jan 20120098.092.73$0
Dec 20110096.873.24$0
Nov 20110095.723.31$0
Oct 20110084.983.65$0
Sep 20110083.623.99$0
Aug 20110083.404.15$0
Jul 20110094.144.52$0
Jun 20110092.904.64$0
May 20110098.134.40$0
Apr 201100105.964.33$0
Mar 20110096.364.06$0
Feb 20110085.644.18$0
Jan 20110086.504.59$0
Dec 20100085.734.35$0
Nov 20100080.843.80$0
Oct 20100478.103.51$14
Sep 2010041872.633.98$1,663
Aug 2010038673.684.42$1,706
Jul 2010049472.554.74$2,340
Jun 2010053570.364.91$2,627
May 2010763871.124.24$3,200
Apr 20101454381.694.12$3,382
Mar 201001,79078.394.39$7,856
Feb 2010214,49773.585.44$26,019
Jan 201052,37274.365.96$14,519
Dec 2009410471.445.48$856
Nov 200908074.593.75$300
Oct 2009610572.544.11$867
Sep 2009016165.543.06$493
Aug 2009311967.423.22$585
Jul 20092210861.133.46$1,719
Jun 2009930566.163.90$1,783
May 2009033654.743.93$1,319
Apr 200984546.773.59$536
Mar 20091511742.144.06$1,107
Feb 2009013532.814.63$625
Jan 20094715135.865.37$2,496
Dec 200811726337.105.98$5,913
Nov 20082210555.496.86$1,941
Oct 2008267175.246.92$2,448
Sep 200823600101.767.88$7,067
Aug 200841426114.228.48$8,297
Jul 200802,038131.0811.39$23,212
Jun 200883,284131.3313.03$43,850
May 200800123.1711.57$0
Apr 20080320110.3110.45$3,346
Mar 20080420101.909.66$4,059
Feb 200801,38892.538.77$12,174
Jan 200807,20090.388.21$59,081
Dec 2007050488.337.30$3,680
Nov 2007088191.677.29$6,424
Oct 200701,24382.856.92$8,604
Sep 200701,22575.846.24$7,649
Aug 200701,04869.066.39$6,695
Jul 200701,07470.906.39$6,861
Jun 200701,08462.007.55$8,183
May 200701,27858.747.85$10,028
Apr 200701,31059.617.81$10,225
Mar 200701,37256.927.30$10,018
Feb 200701,11455.108.22$9,153
Jan 200701,33950.306.73$9,007
Dec 20060056.656.92$0
Nov 20060054.207.62$0
Oct 200602854.906.01$168
Sep 20060960.085.04$45
Aug 2006020168.717.34$1,475
Jul 2006092769.376.34$5,880
Jun 200601,07766.286.38$6,875
May 200601,09366.016.42$7,023
Apr 200601,08364.397.36$7,971
Mar 2006053756.707.08$3,804
Feb 2006071557.597.75$5,542
Jan 2006057360.598.93$5,119
Dec 2005086854.9413.42$11,645
Nov 2005043354.6910.59$4,585
Oct 2005028458.3413.80$3,918
Sep 2005049861.4512.08$6,015
Aug 2005083461.519.80$8,171
Jul 2005040655.697.84$3,185
Jun 200501,27152.337.38$9,381
May 200503,14945.226.65$20,945
Apr 200502,03749.207.36$14,993
Mar 200504,28450.377.15$30,652
Feb 2005039345.226.31$2,481
Jan 2005098243.166.32$6,208
Dec 200401,18439.866.75$7,993
Nov 200401,40045.286.33$8,863
Oct 200407,05949.706.52$45,990
Sep 2004038543.245.28$2,034
Aug 20040042.375.55$0
Jul 2004082338.286.08$5,007
Jun 200404,16836.106.43$26,813
May 2004012,28537.486.49$79,786
Apr 200401,95634.475.86$11,459
Mar 20041096334.365.53$5,669
Feb 2004594,89732.455.51$28,895
Jan 2004625,13532.036.30$34,335
Dec 20036867930.266.30$6,336
Nov 20031976,52428.804.60$35,652
Oct 20032376,76928.174.76$38,894
Sep 200308,43826.314.75$40,075
Aug 2003678,50329.765.13$45,612
Jul 2003011,16829.415.17$57,748
Jun 2003012,80228.565.98$76,594
May 20032912,98826.595.97$78,344
Apr 200309,21326.675.41$49,817
Mar 200308,25431.146.10$50,317
Feb 200305,03533.487.93$39,907

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2019 — as filed, then multipliedworked
Condensate             0 bbl  × $ 58.48 =         $0
Gas                  373 Mcf  × $  2.74 =     $1,022

────────────────────────────────────────────────────
Month total                                   $1,022

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 03/G/193911 is the state's own key, not one this site invented.