PETERS, ALWINE

Operated by CHESAPEAKE OPERATING, L.L.C. (P-5 147699) in the GIDDINGS (AUSTIN CHALK, GAS) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 196450District 03Field 34773550GasSaveExport
Value, all time
$40 k
May 2003 – Mar 2021
Value, last 12 filed months
$0
at the published price for each month
Months reported
215
no gaps in the span
Streams
1
gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 1,061 leases and 1,061 wells, and the rule below applies to all of them.

Discovered
1978-08-01
as the register files it
Field class
Gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 80 acres. The field rule took effect on 2018-10-16.

The Commission's schedule remark for this field reads: AMENDED DRILLING PERMITS, NOTICE, OR HEARING.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
GasProduction6,147 Mcf$39,736
Total$39,736

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.3570, -96.6680. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.35702, -96.66805 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
9,450 ft
1 wells filed one
Completion to plug
39.1 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 9,450 ft.

Completions filed
Feb 1982
1 of 1 wells
Plug dates filed
Mar 2021
1 of 1 wells

Last completion to plug: a median of 39.1 years across the 1 well that filed both dates, with the middle half between 39.1 years and 39.1 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-0513182019,450 ftFeb 1982Mar 2021Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (215)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

215 months

Mar 2021061.302.72$0
Feb 2021057.805.55$0
Jan 2021050.412.81$0
Dec 2020044.642.68$0
Nov 2020038.772.71$0
Oct 2020036.972.48$0
Sep 2020037.091.99$0
Aug 2020039.982.39$0
Jul 2020038.371.83$0
Jun 2020034.901.69$0
May 2020016.921.81$0
Apr 2020014.751.80$0
Mar 2020030.341.86$0
Feb 2020049.881.98$0
Jan 2020057.252.09$0
Dec 2019059.012.30$0
Nov 2019055.302.75$0
Oct 2019053.472.42$0
Sep 2019055.052.66$0
Aug 2019053.112.30$0
Jul 2019056.272.46$0
Jun 2019052.782.49$0
May 2019058.482.74$0
Apr 2019062.632.75$0
Mar 2019056.803.06$0
Feb 2019050.852.79$0
Jan 2019046.033.23$0
Dec 2018046.594.19$0
Nov 2018052.934.24$0
Oct 2018061.443.40$0
Sep 2018059.543.11$0
Aug 2018059.403.07$0
Jul 2018065.142.93$0
Jun 2018060.183.08$0
May 2018065.382.90$0
Apr 2018063.842.90$0
Mar 2018061.222.79$0
Feb 2018061.782.77$0
Jan 2018062.874.01$0
Dec 2017057.272.92$0
Nov 2017055.423.12$0
Oct 2017049.292.98$0
Sep 2017047.523.09$0
Aug 2017045.373.00$0
Jul 2017043.873.09$0
Jun 2017042.493.09$0
May 2017045.373.26$0
Apr 2017047.933.21$0
Mar 2017046.772.98$0
Feb 2017050.452.95$0
Jan 2017049.413.42$0
Dec 2016048.763.72$0
Nov 2016042.492.64$0
Oct 2016046.193.09$0
Sep 2016041.553.10$0
Aug 2016041.442.92$0
Jul 2016041.622.92$0
Jun 2016045.352.69$0
May 2016042.521.99$0
Apr 2016036.561.99$0
Mar 2016033.011.79$0
Feb 2016026.472.06$0
Jan 2016027.352.36$0
Dec 2015032.362.00$0
Nov 2015038.792.17$0
Oct 2015043.552.43$0
Sep 2015042.992.76$0
Aug 2015040.162.87$0
Jul 2015048.152.95$0
Jun 2015056.152.88$0
May 2015055.212.96$0
Apr 2015049.822.71$0
Mar 2015042.892.93$0
Feb 2015744.662.98$21
Jan 20151343.433.10$40
Dec 2014454.693.59$14
Nov 20142270.464.25$94
Oct 20142078.303.90$78
Sep 20141486.164.05$57
Aug 20143989.394.04$157
Jul 20141096.564.18$42
Jun 20142398.164.74$109
May 2014594.734.73$24
Apr 20141695.944.81$77
Mar 2014595.895.06$25
Feb 2014797.406.19$43
Jan 20141190.404.86$53
Dec 2013891.824.35$35
Nov 20131488.853.74$52
Oct 20131197.423.78$42
Sep 201333104.113.72$123
Aug 201319104.253.52$67
Jul 201342102.523.72$156
Jun 20131994.403.93$75
May 20132594.834.15$104
Apr 20139793.964.28$415
Mar 20132893.623.91$110
Feb 2013891.233.42$27
Jan 20131091.603.42$34
Dec 20121586.773.42$51
Nov 20122286.953.62$80
Oct 20122789.383.40$92
Sep 20121594.672.92$44
Aug 20122092.662.91$58
Jul 20123385.133.02$100
Jun 20121479.822.52$35
May 20123491.612.49$85
Apr 201217101.652.00$34
Mar 201217105.052.22$38
Feb 201223101.102.57$59
Jan 20121898.092.73$49
Dec 20111396.873.24$42
Nov 20111395.723.31$43
Oct 20111984.983.65$69
Sep 20112683.623.99$104
Aug 20113583.404.15$145
Jul 20113994.144.52$176
Jun 20112292.904.64$102
May 20112598.134.40$110
Apr 201116105.964.33$69
Mar 20113596.364.06$142
Feb 20112485.644.18$100
Jan 20111886.504.59$83
Dec 20102685.734.35$113
Nov 20102980.843.80$110
Oct 20102378.103.51$81
Sep 20104272.633.98$167
Aug 20103573.684.42$155
Jul 20105372.554.74$251
Jun 20103070.364.91$147
May 20102171.124.24$89
Apr 20105381.694.12$219
Mar 20107678.394.39$334
Feb 2010673.585.44$33
Jan 20101474.365.96$84
Dec 20096171.445.48$335
Nov 20093574.593.75$131
Oct 20095872.544.11$238
Sep 20094165.543.06$126
Aug 20097767.423.22$248
Jul 20093961.133.46$135
Jun 20095666.163.90$218
May 20096654.743.93$259
Apr 20091846.773.59$65
Mar 20099342.144.06$377
Feb 20092832.814.63$130
Jan 20094735.865.37$252
Dec 20082737.105.98$161
Nov 20086355.496.86$432
Oct 20081775.246.92$118
Sep 200860101.767.88$473
Aug 200823114.228.48$195
Jul 200876131.0811.39$866
Jun 200830131.3313.03$391
May 200869123.1711.57$799
Apr 200891110.3110.45$951
Mar 200837101.909.66$358
Feb 20086692.538.77$579
Jan 200811790.388.21$960
Dec 20074088.337.30$292
Nov 20074191.677.29$299
Oct 20076182.856.92$422
Sep 20078875.846.24$549
Aug 20076469.066.39$409
Jul 20076270.906.39$396
Jun 20078562.007.55$642
May 20079658.747.85$753
Apr 200716959.617.81$1,319
Mar 20074856.927.30$350
Feb 20078355.108.22$682
Jan 20075850.306.73$390
Dec 20064156.656.92$284
Nov 20064354.207.62$328
Oct 20064254.906.01$253
Sep 20066260.085.04$312
Aug 20067768.717.34$565
Jul 20066169.376.34$387
Jun 20064866.286.38$306
May 20067166.016.42$456
Apr 20069464.397.36$692
Mar 20068756.707.08$616
Feb 20069257.597.75$713
Jan 20066860.598.93$607
Dec 20054854.9413.42$644
Nov 20055454.6910.59$572
Oct 20056158.3413.80$842
Sep 200514261.4512.08$1,715
Aug 200515861.519.80$1,548
Jul 20057855.697.84$612
Jun 20055252.337.38$384
May 20057945.226.65$525
Apr 20056049.207.36$442
Mar 20055650.377.15$401
Feb 20053945.226.31$246
Jan 20055343.166.32$335
Dec 20045039.866.75$338
Nov 20045845.286.33$367
Oct 20044649.706.52$300
Sep 20044943.245.28$259
Aug 20045242.375.55$289
Jul 20044538.286.08$274
Jun 20045236.106.43$335
May 20043937.486.49$253
Apr 20044734.475.86$275
Mar 20045234.365.53$288
Feb 20045132.455.51$281
Jan 20046632.036.30$416
Dec 20035930.266.30$372
Nov 2003028.804.60$0
Oct 20035128.174.76$243
Sep 2003026.314.75$0
Aug 20035729.765.13$292
Jul 20035929.415.17$305
Jun 2003028.565.98$0
May 2003026.595.97$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Feb 2015 — as filed, then multipliedworked
Gas                    7 Mcf  × $  2.98 =        $21

────────────────────────────────────────────────────
Month total                                      $21

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 03/G/196450 is the state's own key, not one this site invented.