OHIO-SUN UNIT

Operated by REMORA MANAGEMENT, LLC (P-5 701560) in the MARKHAM N.-BAY CITY, N (W. 3 UP) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 199351District 03Field 57578912CondensateGasSaveExport
Value, all time
$3.7 M
Jan 2004 – Sep 2018
Value, last 12 filed months
$0
at the published price for each month
Months reported
177
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 8 leases and 8 wells, and the rule below applies to all of them.

Discovered
1955-03-19
as the register files it
Field class
Gas
the register's own label
Between wells
933 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 1978-10-16.

The Commission's schedule remark for this field reads: OPERATING RULES FOR THE RESULTING FIELD.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition9 bbl$837
GasProduction493,284 Mcf$3,696,036
Total$3,696,873

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 29.0442, -95.9979. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

29.04422, -95.99789 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
8,900 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 8,900 ft.

Completions filed
Sep 2018
1 of 1 wells

1 well

42-3210037812F8,900 ftSep 2018Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (177)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

177 months

Sep 20180059.543.11$0
Aug 20180059.403.07$0
Jul 20180065.142.93$0
Jun 20180060.183.08$0
May 20180065.382.90$0
Apr 20180063.842.90$0
Mar 20180061.222.79$0
Feb 20180061.782.77$0
Jan 20180062.874.01$0
Dec 20170057.272.92$0
Nov 20170055.423.12$0
Oct 20170049.292.98$0
Sep 20170047.523.09$0
Aug 20170045.373.00$0
Jul 20170043.873.09$0
Jun 20170042.493.09$0
May 20170045.373.26$0
Apr 20170047.933.21$0
Mar 20170046.772.98$0
Feb 20170050.452.95$0
Jan 20170049.413.42$0
Dec 20160048.763.72$0
Nov 20160042.492.64$0
Oct 20160046.193.09$0
Sep 20160041.553.10$0
Aug 20160041.442.92$0
Jul 20160041.622.92$0
Jun 20160045.352.69$0
May 20160042.521.99$0
Apr 20160036.561.99$0
Mar 20160033.011.79$0
Feb 20160026.472.06$0
Jan 20160027.352.36$0
Dec 20150032.362.00$0
Nov 20150038.792.17$0
Oct 20150043.552.43$0
Sep 20151042.992.76$43
Aug 20150040.162.87$0
Jul 20150048.152.95$0
Jun 20150056.152.88$0
May 20150055.212.96$0
Apr 20150049.822.71$0
Mar 20150042.892.93$0
Feb 20150044.662.98$0
Jan 20150043.433.10$0
Dec 20140054.693.59$0
Nov 20140070.464.25$0
Oct 20140078.303.90$0
Sep 20140086.164.05$0
Aug 20140089.394.04$0
Jul 20140096.564.18$0
Jun 20140098.164.74$0
May 20140094.734.73$0
Apr 20140095.944.81$0
Mar 20140095.895.06$0
Feb 20140097.406.19$0
Jan 20140090.404.86$0
Dec 20130091.824.35$0
Nov 20130088.853.74$0
Oct 20130097.423.78$0
Sep 201300104.113.72$0
Aug 201300104.253.52$0
Jul 201300102.523.72$0
Jun 20130094.403.93$0
May 20130094.834.15$0
Apr 20130093.964.28$0
Mar 20130093.623.91$0
Feb 20130091.233.42$0
Jan 20130091.603.42$0
Dec 20120086.773.42$0
Nov 20120086.953.62$0
Oct 20120089.383.40$0
Sep 20120094.672.92$0
Aug 20120092.662.91$0
Jul 20120085.133.02$0
Jun 20120079.822.52$0
May 20120091.612.49$0
Apr 201200101.652.00$0
Mar 201200105.052.22$0
Feb 201200101.102.57$0
Jan 20120098.092.73$0
Dec 20110096.873.24$0
Nov 20110095.723.31$0
Oct 20110084.983.65$0
Sep 20110083.623.99$0
Aug 20110083.404.15$0
Jul 20111094.144.52$94
Jun 2011253492.904.64$2,664
May 20112098.134.40$196
Apr 201132,491105.964.33$11,112
Mar 20110096.364.06$0
Feb 20110085.644.18$0
Jan 20110086.504.59$0
Dec 20100085.734.35$0
Nov 20100080.843.80$0
Oct 20100078.103.51$0
Sep 20100072.633.98$0
Aug 20100073.684.42$0
Jul 20100072.554.74$0
Jun 20100070.364.91$0
May 20100071.124.24$0
Apr 20100081.694.12$0
Mar 20100078.394.39$0
Feb 20100073.585.44$0
Jan 20100074.365.96$0
Dec 20090071.445.48$0
Nov 20090074.593.75$0
Oct 20090072.544.11$0
Sep 20090065.543.06$0
Aug 20090067.423.22$0
Jul 20090061.133.46$0
Jun 20090066.163.90$0
May 20090054.743.93$0
Apr 20090046.773.59$0
Mar 20090042.144.06$0
Feb 20090032.814.63$0
Jan 20090035.865.37$0
Dec 20080037.105.98$0
Nov 20080055.496.86$0
Oct 20080075.246.92$0
Sep 2008025101.767.88$197
Aug 200800114.228.48$0
Jul 200800131.0811.39$0
Jun 200800131.3313.03$0
May 200800123.1711.57$0
Apr 200800110.3110.45$0
Mar 200802,480101.909.66$23,967
Feb 20080092.538.77$0
Jan 20080090.388.21$0
Dec 200704,22388.337.30$30,836
Nov 200704,78291.677.29$34,869
Oct 200704,56682.856.92$31,606
Sep 200703,56075.846.24$22,229
Aug 20070069.066.39$0
Jul 20070070.906.39$0
Jun 20070062.007.55$0
May 20070058.747.85$0
Apr 2007080259.617.81$6,260
Mar 20070056.927.30$0
Feb 200701,78055.108.22$14,624
Jan 2007014,15750.306.73$95,232
Dec 2006013,97056.656.92$96,651
Nov 2006012,41554.207.62$94,571
Oct 2006013,73554.906.01$82,600
Sep 2006013,30560.085.04$67,020
Aug 2006013,99568.717.34$102,722
Jul 2006014,89069.376.34$94,444
Jun 2006013,65566.286.38$87,172
May 2006014,42066.016.42$92,649
Apr 2006013,53064.397.36$99,587
Mar 2006012,81556.707.08$90,768
Feb 2006011,94057.597.75$92,548
Jan 2006012,61560.598.93$112,694
Dec 2005013,37654.9413.42$179,444
Nov 2005015,57054.6910.59$164,861
Oct 2005019,23458.3413.80$265,348
Sep 2005018,25461.4512.08$220,490
Aug 2005014,70361.519.80$144,043
Jul 2005012,25555.697.84$96,124
Jun 200506,51952.337.38$48,117
May 2005015,01445.226.65$99,861
Apr 200509,19849.207.36$67,702
Mar 200506,01450.377.15$43,029
Feb 200505,02245.226.31$31,698
Jan 200509,68243.166.32$61,212
Dec 200406,01639.866.75$40,615
Nov 2004016,88845.286.33$106,908
Oct 2004010,99549.706.52$71,634
Sep 2004012,73343.245.28$67,280
Aug 2004015,62342.375.55$86,718
Jul 2004015,14738.286.08$92,157
Jun 2004013,26036.106.43$85,302
May 2004011,62837.486.49$75,519
Apr 200409,82434.475.86$57,554
Mar 2004014,94134.365.53$82,626
Feb 2004011,57232.455.51$63,757
Jan 200409,13132.036.30$57,522

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Sep 2015 — as filed, then multipliedworked
Condensate             1 bbl  × $ 42.99 =        $43
Gas                    0 Mcf  × $  2.76 =         $0

────────────────────────────────────────────────────
Month total                                      $43

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 03/G/199351 is the state's own key, not one this site invented.