THOMAS

Operated by TRI-C RESOURCES, INC. (P-5 868554) in the WYLIE field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 199381District 03Field 99035001CondensateGasSaveExport
Value, all time
$604 k
Jan 2004 – Aug 2005
Value, last 12 filed months
$0
at the published price for each month
Months reported
20
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 11 leases and 11 wells, and the rule below applies to all of them.

Discovered
1980-04-15
as the register files it
Field class
Gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

The Commission's schedule remark for this field reads: AND AOF2 EFFECTIVE 1-1-96.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition1,296 bbl$44,620
GasProduction96,533 Mcf$559,029
Total$603,650

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 29.5538, -96.3070. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

29.55384, -96.30697 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
10,505 ft
1 wells filed one
Completion to plug
9 months
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 10,505 ft.

Completions filed
Jan 2004
1 of 1 wells
Plug dates filed
Oct 2004
1 of 1 wells

Last completion to plug: a median of 9 months across the 1 well that filed both dates, with the middle half between 9 months and 9 months. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-08932355110,505 ftJan 2004Oct 2004Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (20)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

20 months

Aug 20050061.519.80$0
Jul 20050055.697.84$0
Jun 20050052.337.38$0
May 20050045.226.65$0
Apr 20050049.207.36$0
Mar 20050050.377.15$0
Feb 20050045.226.31$0
Jan 20050043.166.32$0
Dec 20040039.866.75$0
Nov 20040045.286.33$0
Oct 20040049.706.52$0
Sep 20040043.245.28$0
Aug 20040042.375.55$0
Jul 2004149038.286.08$5,704
Jun 200414,32636.106.43$27,865
May 200418814,97437.486.49$104,296
Apr 200417711,87734.475.86$75,682
Mar 200420426,75734.365.53$154,979
Feb 200457733,87332.455.51$205,351
Jan 200404,72632.036.30$29,772

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jul 2004 — as filed, then multipliedworked
Condensate           149 bbl  × $ 38.28 =     $5,704
Gas                    0 Mcf  × $  6.08 =         $0

────────────────────────────────────────────────────
Month total                                   $5,704

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 03/G/199381 is the state's own key, not one this site invented.