BROOK, M. I.

Operated by WRD OPERATING LLC (P-5 100758) in the DYERSDALE, N. (8100) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 201402District 03Field 26878850CondensateGasSaveExport
Value, all time
$320 k
May 2003 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
277
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6 leases and 6 wells, and the rule below applies to all of them.

Discovered
1977-06-07
as the register files it
Field class
Oil and gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

The Commission's schedule remark for this field reads: AOF TO ONE WELL EFF 10-1-93

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition1,108 bbl$84,912
GasProduction47,860 Mcf$235,479
Total$320,391

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 29.9147, -95.2982. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

29.91471, -95.29817 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
9,350 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 9,350 ft.

Completions filed
May 2003
1 of 1 wells

1 well

42-2013087829,350 ftMay 2003

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (277)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

277 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 202501362.363.54$46
Mar 20250967.704.27$38
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 202301,52077.892.81$4,267
Oct 202301,73685.443.09$5,360
Sep 202301,69089.042.74$4,622
Aug 202301,70580.522.67$4,557
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210571.323.90$20
Nov 20210777.435.24$37
Oct 20210979.795.71$51
Sep 20210869.865.35$43
Aug 202101066.024.22$42
Jul 202101170.783.98$44
Jun 202101069.493.38$34
May 202101163.483.02$33
Apr 202101060.362.76$28
Mar 202101561.302.72$41
Feb 202101257.805.55$67
Jan 202101550.412.81$42
Dec 202001744.642.68$45
Nov 202002538.772.71$68
Oct 20203541636.972.48$13,127
Sep 20200737.091.99$14
Aug 20200339.982.39$7
Jul 202001438.371.83$26
Jun 202001134.901.69$19
May 202002216.921.81$40
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 20200057.252.09$0
Dec 2019010159.012.30$233
Nov 2019011055.302.75$303
Oct 2019011453.472.42$276
Sep 2019010155.052.66$268
Aug 2019011553.112.30$265
Jul 2019011256.272.46$276
Jun 2019011652.782.49$289
May 2019011758.482.74$321
Apr 2019011062.632.75$303
Mar 2019010356.803.06$315
Feb 201901150.852.79$31
Jan 201902246.033.23$71
Dec 2018011046.594.19$460
Nov 201801152.934.24$47
Oct 201801261.443.40$41
Sep 201809259.543.11$286
Aug 201801159.403.07$34
Jul 20180965.142.93$26
Jun 201809760.183.08$298
May 2018013665.382.90$395
Apr 201806263.842.90$180
Mar 201802361.222.79$64
Feb 201801161.782.77$30
Jan 201801162.874.01$44
Dec 201701057.272.92$29
Nov 201702955.423.12$90
Oct 2017020349.292.98$606
Sep 2017012347.523.09$380
Aug 2017027445.373.00$823
Jul 2017030643.873.09$945
Jun 2017014942.493.09$460
May 201709345.373.26$304
Apr 201703047.933.21$96
Mar 2017011346.772.98$337
Feb 201708150.452.95$239
Jan 2017013949.413.42$475
Dec 201606148.763.72$227
Nov 201603842.492.64$100
Oct 2016037146.193.09$1,146
Sep 2016020441.553.10$633
Aug 2016020241.442.92$591
Jul 2016030841.622.92$901
Jun 2016010345.352.69$277
May 2016010842.521.99$215
Apr 201604436.561.99$88
Mar 2016013133.011.79$235
Feb 201603726.472.06$76
Jan 2016013727.352.36$324
Dec 2015018632.362.00$372
Nov 2015022038.792.17$477
Oct 2015035843.552.43$869
Sep 2015011042.992.76$303
Aug 2015010840.162.87$310
Jul 2015010548.152.95$309
Jun 2015011056.152.88$317
May 2015011255.212.96$331
Apr 2015011049.822.71$298
Mar 2015010242.892.93$299
Feb 2015011044.662.98$327
Jan 20150143.433.10$3
Dec 201405854.693.59$208
Nov 2014022070.464.25$935
Oct 2014014278.303.90$554
Sep 201407386.164.05$295
Aug 20140089.394.04$0
Jul 20140096.564.18$0
Jun 20140098.164.74$0
May 2014033294.734.73$1,569
Apr 2014023895.944.81$1,145
Mar 201401,21295.895.06$6,129
Feb 2014077497.406.19$4,793
Jan 2014013390.404.86$646
Dec 201303891.824.35$165
Nov 201302488.853.74$90
Oct 2013854597.423.78$8,451
Sep 20130183104.113.72$680
Aug 201362110104.253.52$6,851
Jul 2013168312102.523.72$18,383
Jun 20133592,56194.403.93$43,963
May 201303,48594.834.15$14,460
Apr 2013035993.964.28$1,537
Mar 2013011593.623.91$450
Feb 201306291.233.42$212
Jan 201305591.603.42$188
Dec 201204286.773.42$144
Nov 201206286.953.62$225
Oct 201207789.383.40$262
Sep 2012013794.672.92$400
Aug 2012011092.662.91$320
Jul 2012010685.133.02$320
Jun 20120079.822.52$0
May 2012012091.612.49$299
Apr 20120165101.652.00$329
Mar 20120147105.052.22$327
Feb 20120110101.102.57$283
Jan 201206498.092.73$175
Dec 201108996.873.24$288
Nov 201106595.723.31$215
Oct 201107784.983.65$281
Sep 201102683.623.99$104
Aug 20110083.404.15$0
Jul 201109094.144.52$407
Jun 201103492.904.64$158
May 201106798.134.40$295
Apr 201100105.964.33$0
Mar 20110096.364.06$0
Feb 20110085.644.18$0
Jan 20110086.504.59$0
Dec 20100085.734.35$0
Nov 20100080.843.80$0
Oct 201004278.103.51$147
Sep 201003872.633.98$151
Aug 20100073.684.42$0
Jul 20100072.554.74$0
Jun 20100070.364.91$0
May 20100071.124.24$0
Apr 20100081.694.12$0
Mar 20100078.394.39$0
Feb 20100073.585.44$0
Jan 20100074.365.96$0
Dec 20090071.445.48$0
Nov 200980074.593.75$5,967
Oct 20090072.544.11$0
Sep 20090065.543.06$0
Aug 20090067.423.22$0
Jul 20090061.133.46$0
Jun 20090066.163.90$0
May 20090054.743.93$0
Apr 20090046.773.59$0
Mar 20090042.144.06$0
Feb 2009012632.814.63$584
Jan 2009020035.865.37$1,074
Dec 200803037.105.98$179
Nov 200805055.496.86$343
Oct 200803075.246.92$208
Sep 2008030101.767.88$236
Aug 2008050114.228.48$424
Jul 2008030131.0811.39$342
Jun 2008038131.3313.03$495
May 2008025123.1711.57$289
Apr 2008012110.3110.45$125
Mar 2008015101.909.66$145
Feb 20080792.538.77$61
Jan 200803590.388.21$287
Dec 200702088.337.30$146
Nov 200703591.677.29$255
Oct 200702082.856.92$138
Sep 200701575.846.24$94
Aug 200703369.066.39$211
Jul 200705070.906.39$319
Jun 200709662.007.55$725
May 2007010058.747.85$785
Apr 2007010059.617.81$781
Mar 2007010056.927.30$730
Feb 2007010055.108.22$822
Jan 2007010050.306.73$673
Dec 2006015856.656.92$1,093
Nov 2006013754.207.62$1,044
Oct 2006030054.906.01$1,804
Sep 2006030060.085.04$1,511
Aug 2006014468.717.34$1,057
Jul 2006097969.376.34$6,210
Jun 20060066.286.38$0
May 2006012066.016.42$771
Apr 20060064.397.36$0
Mar 2006012556.707.08$885
Feb 20060057.597.75$0
Jan 2006036260.598.93$3,234
Dec 2005020054.9413.42$2,683
Nov 2005041054.6910.59$4,341
Oct 2005045058.3413.80$6,208
Sep 2005049061.4512.08$5,919
Aug 2005060061.519.80$5,878
Jul 2005024055.697.84$1,882
Jun 200501,80052.337.38$13,286
May 2005029445.226.65$1,955
Apr 2005020049.207.36$1,472
Mar 2005018550.377.15$1,324
Feb 2005019045.226.31$1,199
Jan 2005020043.166.32$1,264
Dec 2004019539.866.75$1,316
Nov 2004018545.286.33$1,171
Oct 2004019049.706.52$1,238
Sep 2004017543.245.28$925
Aug 2004015042.375.55$833
Jul 2004015038.286.08$913
Jun 2004014536.106.43$933
May 2004048037.486.49$3,117
Apr 2004069034.475.86$4,042
Mar 2004035034.365.53$1,936
Feb 2004032532.455.51$1,791
Jan 2004035032.036.30$2,205
Dec 2003030030.266.30$1,890
Nov 2003034628.804.60$1,590
Oct 200301,25128.174.76$5,954
Sep 200301,20026.314.75$5,699
Aug 200301,43029.765.13$7,336
Jul 200301,54829.415.17$8,004
Jun 200301,35128.565.98$8,083
May 200301,96526.595.97$11,736

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Apr 2025 — as filed, then multipliedworked
Condensate             0 bbl  × $ 62.36 =         $0
Gas                   13 Mcf  × $  3.54 =        $46

────────────────────────────────────────────────────
Month total                                      $46

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 03/G/201402 is the state's own key, not one this site invented.