HINTZ ESTATE 'A'

Operated by MAGNUM PRODUCING, LP (P-5 521516) in the SEALY (WILCOX CONS.) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 201550District 03Field 819483002 tax incentive programmesCondensateGasSaveExport
Value, all time
$1.5 M
Feb 2004 – May 2026
Value, last 12 filed months
$762
at the published price for each month
Months reported
268
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 15 leases and 15 wells, and the rule below applies to all of them.

Discovered
2007-09-11
as the register files it
Field class
Gas
the register's own label
Between wells
1,200 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2007-09-11.

The Commission's schedule remark for this field reads: SUSPENDED.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112007-05-22174563
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition1,497 bbl$78,357
GasProduction202,432 Mcf$1,458,337
Total$1,536,695

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 29.7657, -96.1892. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

29.76566, -96.18919 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
12,000 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 12,000 ft.

Completions filed
Feb 2004
1 of 1 wells

1 well

42-01530273312,000 ftFeb 2004

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (268)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

268 months

May 202600106.413.05$0
Apr 202602798.932.87$77
Mar 20260089.753.15$0
Feb 20260963.503.75$34
Jan 202601559.138.00$120
Dec 202503556.664.41$154
Nov 202501558.593.93$59
Oct 202501759.383.30$56
Sep 202503262.743.08$98
Aug 202502363.933.01$69
Jul 202501366.743.32$43
Jun 202501666.483.13$50
May 20250960.553.23$29
Apr 20250962.363.54$32
Mar 202502267.704.27$94
Feb 202501970.884.34$82
Jan 202502574.324.28$107
Dec 202402568.993.12$78
Nov 202402569.052.20$55
Oct 202402871.372.28$64
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 202402078.812.20$44
Apr 202403484.451.66$56
Mar 202403180.301.55$48
Feb 202403376.091.78$59
Jan 202401973.023.30$63
Dec 202302871.262.61$73
Nov 202303277.892.81$90
Oct 202304485.443.09$136
Sep 202302189.042.74$57
Aug 202302680.522.67$69
Jul 202303874.852.64$100
Jun 202302568.962.26$56
May 202304770.622.23$105
Apr 202301578.122.24$34
Mar 202303172.852.39$74
Feb 202302875.112.47$69
Jan 202304576.533.39$152
Dec 202204576.415.73$258
Nov 202202685.005.65$147
Oct 202202187.185.86$123
Sep 2022032884.888.16$2,678
Aug 202202794.529.13$246
Jul 2022019101.587.54$143
Jun 2022026115.097.98$207
May 2022016109.378.43$135
Apr 2022044104.226.84$301
Mar 20220107108.885.08$543
Feb 202202791.054.86$131
Jan 202202281.844.54$100
Dec 20210071.323.90$0
Nov 202102077.435.24$105
Oct 202101879.795.71$103
Sep 202101369.865.35$70
Aug 202102066.024.22$84
Jul 202101070.783.98$40
Jun 20210069.493.38$0
May 202102863.483.02$84
Apr 202102160.362.76$58
Mar 202101961.302.72$52
Feb 202102757.805.55$150
Jan 202104650.412.81$129
Dec 202008544.642.68$227
Nov 20200038.772.71$0
Oct 20200536.972.48$12
Sep 202002237.091.99$44
Aug 202001839.982.39$43
Jul 202003338.371.83$60
Jun 202003034.901.69$51
May 202001916.921.81$34
Apr 202003114.751.80$56
Mar 202007330.341.86$136
Feb 202008949.881.98$176
Jan 202003357.252.09$69
Dec 2019012059.012.30$277
Nov 201908255.302.75$226
Oct 201908953.472.42$215
Sep 201909455.052.66$250
Aug 201908553.112.30$196
Jul 2019011856.272.46$290
Jun 2019010952.782.49$272
May 201906158.482.74$167
Apr 2019014662.632.75$402
Mar 2019014856.803.06$453
Feb 2019015050.852.79$419
Jan 2019013746.033.23$442
Dec 201801346.594.19$54
Nov 201804252.934.24$178
Oct 2018014661.443.40$496
Sep 20180059.543.11$0
Aug 20180659.403.07$18
Jul 20180065.142.93$0
Jun 201807460.183.08$228
May 2018010965.382.90$316
Apr 2018012063.842.90$348
Mar 2018013561.222.79$376
Feb 2018010861.782.77$299
Jan 2018013662.874.01$545
Dec 201705257.272.92$152
Nov 2017013455.423.12$418
Oct 2017013249.292.98$394
Sep 201708647.523.09$266
Aug 2017010945.373.00$327
Jul 201709643.873.09$296
Jun 201709442.493.09$290
May 2017011845.373.26$385
Apr 201707147.933.21$228
Mar 2017014346.772.98$427
Feb 2017013650.452.95$402
Jan 2017013149.413.42$448
Dec 2016013748.763.72$510
Nov 201602442.492.64$63
Oct 201609946.193.09$306
Sep 2016015841.553.10$490
Aug 2016015041.442.92$439
Jul 2016013541.622.92$395
Jun 2016031345.352.69$841
May 2016019042.521.99$378
Apr 2016068136.561.99$1,356
Mar 2016051833.011.79$929
Feb 2016029826.472.06$615
Jan 2016036027.352.36$851
Dec 2015042532.362.00$851
Nov 2015027038.792.17$585
Oct 2015030043.552.43$728
Sep 201506142.992.76$168
Aug 2015013940.162.87$399
Jul 2015022448.152.95$660
Jun 20150056.152.88$0
May 2015025255.212.96$745
Apr 2015011749.822.71$317
Mar 2015039042.892.93$1,145
Feb 2015027444.662.98$815
Jan 2015024643.433.10$763
Dec 2014037554.693.59$1,347
Nov 2014033670.464.25$1,429
Oct 2014045178.303.90$1,759
Sep 2014044386.164.05$1,792
Aug 2014036589.394.04$1,473
Jul 2014050196.564.18$2,094
Jun 2014051498.164.74$2,435
May 20140094.734.73$0
Apr 2014045395.944.81$2,179
Mar 2014053295.895.06$2,690
Feb 2014050397.406.19$3,115
Jan 2014055290.404.86$2,683
Dec 2013048291.824.35$2,099
Nov 2013028388.853.74$1,058
Oct 2013042097.423.78$1,587
Sep 20130474104.113.72$1,762
Aug 20130423104.253.52$1,490
Jul 20130441102.523.72$1,640
Jun 2013042094.403.93$1,652
May 2013043094.834.15$1,784
Apr 2013044093.964.28$1,884
Mar 2013042193.623.91$1,647
Feb 2013041491.233.42$1,416
Jan 20130091.603.42$0
Dec 2012043486.773.42$1,484
Nov 2012040886.953.62$1,479
Oct 2012046589.383.40$1,581
Sep 2012040894.672.92$1,191
Aug 2012045792.662.91$1,329
Jul 2012052785.133.02$1,592
Jun 2012038379.822.52$965
May 2012028991.612.49$719
Apr 20120614101.652.00$1,226
Mar 20120801105.052.22$1,780
Feb 20120664101.102.57$1,707
Jan 2012064998.092.73$1,774
Dec 2011035696.873.24$1,153
Nov 2011055895.723.31$1,848
Oct 2011080884.983.65$2,948
Sep 2011036583.623.99$1,455
Aug 2011067683.404.15$2,805
Jul 2011076194.144.52$3,438
Jun 2011014392.904.64$664
May 2011082098.134.40$3,612
Apr 20110845105.964.33$3,662
Mar 2011028996.364.06$1,173
Feb 2011064685.644.18$2,700
Jan 2011017486.504.59$798
Dec 2010067985.734.35$2,952
Nov 2010054380.843.80$2,061
Oct 2010016478.103.51$575
Sep 2010060972.633.98$2,424
Aug 2010071473.684.42$3,155
Jul 2010070872.554.74$3,353
Jun 2010069470.364.91$3,408
May 2010063971.124.24$2,706
Apr 2010067681.694.12$2,787
Mar 2010078878.394.39$3,458
Feb 2010035573.585.44$1,932
Jan 2010084274.365.96$5,022
Dec 2009078171.445.48$4,283
Nov 2009079074.593.75$2,964
Oct 2009184772.544.11$3,554
Sep 2009075065.543.06$2,299
Aug 2009086567.423.22$2,784
Jul 200901,03861.133.46$3,596
Jun 2009093266.163.90$3,630
May 2009089054.743.93$3,494
Apr 2009094946.773.59$3,405
Mar 200901,37542.144.06$5,581
Feb 200901,09432.814.63$5,069
Jan 200901,04835.865.37$5,629
Dec 200801,15637.105.98$6,910
Nov 200801,00655.496.86$6,902
Oct 200801,01975.246.92$7,054
Sep 200801,273101.767.88$10,028
Aug 200801,062114.228.48$9,009
Jul 200801,023131.0811.39$11,651
Jun 200801,314131.3313.03$17,125
May 200801,428123.1711.57$16,528
Apr 200801,285110.3110.45$13,435
Mar 200801,273101.909.66$12,302
Feb 200802,03692.538.77$17,857
Jan 200801,70690.388.21$13,999
Dec 200702,27588.337.30$16,612
Nov 200702,25091.677.29$16,406
Oct 200702,87182.856.92$19,873
Sep 200702,28275.846.24$14,249
Aug 200705,08669.066.39$32,489
Jul 200705,12270.906.39$32,719
Jun 200705,16062.007.55$38,950
May 200703,48058.747.85$27,305
Apr 2007018359.617.81$1,428
Mar 200701856.927.30$131
Feb 20076561155.108.22$8,601
Jan 20070050.306.73$0
Dec 20060056.656.92$0
Nov 2006027454.207.62$2,087
Oct 20061418654.906.01$1,887
Sep 2006041260.085.04$2,075
Aug 2006531,11768.717.34$11,840
Jul 2006034769.376.34$2,201
Jun 200603,05666.286.38$19,509
May 2006652,01266.016.42$17,218
Apr 200603,26364.397.36$24,017
Mar 20061164,80656.707.08$40,618
Feb 200605,22057.597.75$40,461
Jan 2006895,50260.598.93$54,544
Dec 20051096,65854.9413.42$95,308
Nov 200517,21754.6910.59$76,471
Oct 20051028,64658.3413.80$125,229
Sep 20051319,14761.4512.08$118,537
Aug 200515,23461.519.80$51,338
Jul 2005702,62655.697.84$24,496
Jun 200502,37852.337.38$17,552
May 2005552,59245.226.65$19,727
Apr 2005552,31149.207.36$19,716
Mar 2005962,37950.377.15$21,857
Feb 2005462,08445.226.31$15,234
Jan 2005522,38743.166.32$17,335
Dec 20049383239.866.75$9,324
Nov 2004552,62445.286.33$19,101
Oct 2004513,11349.706.52$22,816
Sep 2004792,67043.245.28$17,524
Aug 200401,03342.375.55$5,734
Jul 2004081938.286.08$4,983
Jun 2004333,13736.106.43$21,372
May 2004323,09437.486.49$21,294
Apr 2004332,92834.475.86$18,291
Mar 200403,26334.365.53$18,045
Feb 200401,62332.455.51$8,942

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Apr 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $ 98.93 =         $0
Gas                   27 Mcf  × $  2.87 =        $77

────────────────────────────────────────────────────
Month total                                      $77

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 03/G/201550 is the state's own key, not one this site invented.