RGGS LAND & MINERALS

Operated by YUMA E & P COMPANY, INC. (P-5 950358) in the BEACH CITY (VKSBG GYRO K) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 210151District 03Field 06405415CondensateGasSaveExport
Value, all time
$20.1 M
Apr 2005 – Oct 2012
Value, last 12 filed months
$0
at the published price for each month
Months reported
91
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 5 leases and 5 wells, and the rule below applies to all of them.

Discovered
2002-06-03
as the register files it
Field class
Gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

The Commission's schedule remark for this field reads: AOF-1 AND AOF-2 EFFECTIVE 04/01/2004.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition150,934 bbl$9,529,932
GasProduction1,355,443 Mcf$10,578,385
Total$20,108,317

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 29.7329, -94.8776. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

29.73291, -94.87763 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
10,578 ft
1 wells filed one
Completion to plug
6.8 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 10,578 ft.

Completions filed
Apr 2005
1 of 1 wells
Plug dates filed
Feb 2012
1 of 1 wells

Last completion to plug: a median of 6.8 years across the 1 well that filed both dates, with the middle half between 6.8 years and 6.8 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-07132290210,578 ftApr 2005Feb 2012Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (91)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

91 months

Oct 20120089.383.40$0
Sep 20120094.672.92$0
Aug 20120092.662.91$0
Jul 20120085.133.02$0
Jun 20120079.822.52$0
May 20120091.612.49$0
Apr 201200101.652.00$0
Mar 201200105.052.22$0
Feb 201200101.102.57$0
Jan 20120098.092.73$0
Dec 20110096.873.24$0
Nov 20110095.723.31$0
Oct 20110084.983.65$0
Sep 20110083.623.99$0
Aug 20110083.404.15$0
Jul 20110094.144.52$0
Jun 20110092.904.64$0
May 20110098.134.40$0
Apr 201100105.964.33$0
Mar 20110096.364.06$0
Feb 20110085.644.18$0
Jan 20110086.504.59$0
Dec 20100085.734.35$0
Nov 20100080.843.80$0
Oct 20100078.103.51$0
Sep 201002472.633.98$96
Aug 20103502673.684.42$25,903
Jul 201004072.554.74$189
Jun 201003170.364.91$152
May 201003671.124.24$152
Apr 201003581.694.12$144
Mar 20100778.394.39$31
Feb 2010061973.585.44$3,369
Jan 20103594,58174.365.96$54,017
Dec 20097259,63271.445.48$104,613
Nov 200954211,73074.593.75$84,433
Oct 200990713,48772.544.11$121,229
Sep 200953614,40765.543.06$79,283
Aug 20091,04919,31467.423.22$132,886
Jul 20091,04419,52261.133.46$131,454
Jun 200971416,69866.163.90$112,277
May 200989217,89054.743.93$119,060
Apr 200991412,71546.773.59$88,363
Mar 20091,22113,13942.144.06$104,784
Feb 20091,06011,65132.814.63$88,758
Jan 20091,03913,21935.865.37$108,258
Dec 20081,38316,54837.105.98$150,219
Nov 20081,07916,08055.496.86$170,188
Oct 20081,76821,90575.246.92$284,650
Sep 20087048,504101.767.88$138,626
Aug 20087116,072114.228.48$132,719
Jul 20088576,944131.0811.39$191,424
Jun 20087097,713131.3313.03$193,634
May 20087058,304123.1711.57$182,948
Apr 20081,0468,174110.3110.45$200,842
Mar 20088818,672101.909.66$173,581
Feb 20081,2638,44192.538.77$190,898
Jan 20081,2539,73190.388.21$193,096
Dec 20071,0629,93588.337.30$166,352
Nov 20071,23010,32591.677.29$188,041
Oct 20071,04310,96782.856.92$162,326
Sep 20071,03410,98475.846.24$147,004
Aug 20071,40211,45469.066.39$169,990
Jul 20071,23311,46070.906.39$160,625
Jun 20071,22411,52562.007.55$162,884
May 20071,59412,49058.747.85$191,632
Apr 20071,60812,14559.617.81$190,647
Mar 20071,85613,02956.927.30$200,781
Feb 20071,4449,66355.108.22$158,956
Jan 20071,45311,32250.306.73$149,247
Dec 20068965,02156.656.92$85,496
Nov 20062,50225,94754.207.62$333,259
Oct 20062,70036,65654.906.01$368,672
Sep 20063,24746,42260.085.04$428,917
Aug 20064,30658,61768.717.34$726,109
Jul 20065,11165,44769.376.34$769,665
Jun 20065,78260,53366.286.38$769,666
May 20067,16966,22266.016.42$898,702
Apr 20067,23163,70964.397.36$934,533
Mar 20069,27264,10956.707.08$979,801
Feb 20068,54457,85357.597.75$940,475
Jan 200610,60071,90660.598.93$1,284,613
Dec 200510,03064,32154.9413.42$1,413,940
Nov 20058,94661,49754.6910.59$1,140,412
Oct 20059,02458,98158.3413.80$1,340,148
Sep 20056,99445,51761.4512.08$979,581
Aug 20057,51049,87861.519.80$950,587
Jul 20057749,50755.697.84$117,674
Jun 20050052.337.38$0
May 20050045.226.65$0
Apr 20054022,11049.207.36$35,309

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Sep 2010 — as filed, then multipliedworked
Condensate             0 bbl  × $ 72.63 =         $0
Gas                   24 Mcf  × $  3.98 =        $96

────────────────────────────────────────────────────
Month total                                      $96

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 03/G/210151 is the state's own key, not one this site invented.