LEHRER GU "C"

Operated by CORONADO ENERGY E&P COMPANY, LLC (P-5 179353) in the GRACELAND (BLUE SUEDE) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 214085District 03Field 36236050CondensateGasSaveExport
Value, all time
$725 k
Jan 2006 – Mar 2009
Value, last 12 filed months
$325 k
at the published price for each month
Months reported
39
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 3 leases and 3 wells, and the rule below applies to all of them.

Discovered
1999-04-24
as the register files it
Field class
Gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition839 bbl$58,312
GasProduction87,900 Mcf$666,577
Total$724,889

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 29.4127, -96.5216. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

29.41274, -96.52165 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
14,025 ft
1 wells filed one
Completion to plug
6.0 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 14,025 ft.

Completions filed
Apr 2009
1 of 1 wells
Plug dates filed
Apr 2015
1 of 1 wells

Last completion to plug: a median of 6.0 years across the 1 well that filed both dates, with the middle half between 6.0 years and 6.0 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-08932330414,025 ftApr 2009Apr 2015Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (39)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

39 months

Mar 20090042.144.06$0
Feb 20090032.814.63$0
Jan 20090035.865.37$0
Dec 20080037.105.98$0
Nov 200831055.496.86$1,720
Oct 2008010,76675.246.92$74,522
Sep 20088125,400101.767.88$208,321
Aug 20080746114.228.48$6,328
Jul 20080666131.0811.39$7,585
Jun 20080633131.3313.03$8,250
May 200838635123.1711.57$12,030
Apr 20080627110.3110.45$6,555
Mar 200832632101.909.66$9,368
Feb 2008169492.538.77$6,179
Jan 2008273790.388.21$6,228
Dec 20071053988.337.30$4,819
Nov 2007063691.677.29$4,638
Oct 20073180682.856.92$8,147
Sep 200701,00975.846.24$6,300
Aug 2007083669.066.39$5,340
Jul 2007976670.906.39$5,531
Jun 20071165362.007.55$5,611
May 20071078158.747.85$6,715
Apr 2007088559.617.81$6,908
Mar 2007351,07556.927.30$9,842
Feb 2007081455.108.22$6,688
Jan 20071975550.306.73$6,034
Dec 2006161,12356.656.92$8,676
Nov 2006131,01554.207.62$8,436
Oct 2006151,29054.906.01$8,581
Sep 200601,20060.085.04$6,045
Aug 2006211,66368.717.34$13,649
Jul 2006181,68869.376.34$11,955
Jun 2006281,83966.286.38$13,596
May 20061113,09366.016.42$27,200
Apr 200602,47364.397.36$18,202
Mar 20061815,04356.707.08$45,982
Feb 200612612,43257.597.75$103,618
Jan 200603,95060.598.93$35,287

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Nov 2008 — as filed, then multipliedworked
Condensate            31 bbl  × $ 55.49 =     $1,720
Gas                    0 Mcf  × $  6.86 =         $0

────────────────────────────────────────────────────
Month total                                   $1,720

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 03/G/214085 is the state's own key, not one this site invented.