B. P. AMERICA K

Operated by C & E OPERATING, INC. (P-5 120079) in the HAMPTON, SOUTH (YEGUA E-4) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 218741District 03Field 38613329CondensateGasSaveExport
Value, all time
$2.1 M
Dec 2005 – May 2014
Value, last 12 filed months
$0
at the published price for each month
Months reported
102
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 2 leases and 2 wells, and the rule below applies to all of them.

Discovered
1960-01-25
as the register files it
Field class
Gas
the register's own label
Between wells
2,640 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 160 acres.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition4,459 bbl$299,687
GasProduction261,676 Mcf$1,834,871
Total$2,134,558

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.4050, -94.2053. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.40500, -94.20534 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
8,000 ft
1 wells filed one
Completion to plug
4.4 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 8,000 ft.

Completions filed
Dec 2005
1 of 1 wells
Plug dates filed
May 2010
1 of 1 wells

Last completion to plug: a median of 4.4 years across the 1 well that filed both dates, with the middle half between 4.4 years and 4.4 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-1993297918,000 ftDec 2005May 2010Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (102)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

102 months

May 20140094.734.73$0
Apr 20140095.944.81$0
Mar 20140095.895.06$0
Feb 20140097.406.19$0
Jan 20140090.404.86$0
Dec 20130091.824.35$0
Nov 20130088.853.74$0
Oct 20130097.423.78$0
Sep 201300104.113.72$0
Aug 201300104.253.52$0
Jul 201300102.523.72$0
Jun 20130094.403.93$0
May 20130094.834.15$0
Apr 20130093.964.28$0
Mar 20130093.623.91$0
Feb 20130091.233.42$0
Jan 20130091.603.42$0
Dec 20120086.773.42$0
Nov 20120086.953.62$0
Oct 20120089.383.40$0
Sep 20120094.672.92$0
Aug 20120092.662.91$0
Jul 20120085.133.02$0
Jun 20120079.822.52$0
May 20120091.612.49$0
Apr 201200101.652.00$0
Mar 201200105.052.22$0
Feb 201200101.102.57$0
Jan 20120098.092.73$0
Dec 20110096.873.24$0
Nov 20110095.723.31$0
Oct 20110084.983.65$0
Sep 20110083.623.99$0
Aug 20110083.404.15$0
Jul 20110094.144.52$0
Jun 20110092.904.64$0
May 20110098.134.40$0
Apr 201100105.964.33$0
Mar 20110096.364.06$0
Feb 20110085.644.18$0
Jan 20110086.504.59$0
Dec 20100085.734.35$0
Nov 20100080.843.80$0
Oct 20100078.103.51$0
Sep 20100072.633.98$0
Aug 20100073.684.42$0
Jul 20100072.554.74$0
Jun 20100070.364.91$0
May 20100071.124.24$0
Apr 20100081.694.12$0
Mar 20100078.394.39$0
Feb 20100073.585.44$0
Jan 20100074.365.96$0
Dec 20091802271.445.48$12,980
Nov 2009042374.593.75$1,587
Oct 2009056172.544.11$2,306
Sep 2009042365.543.06$1,296
Aug 2009091167.423.22$2,932
Jul 2009013761.133.46$475
Jun 2009013766.163.90$534
May 2009065454.743.93$2,567
Apr 20090046.773.59$0
Mar 2009067942.144.06$2,756
Feb 2009073132.814.63$3,387
Jan 20090035.865.37$0
Dec 200807537.105.98$448
Nov 2008066255.496.86$4,542
Oct 200801,06475.246.92$7,365
Sep 20080313101.767.88$2,466
Aug 20080713114.228.48$6,048
Jul 2008086131.0811.39$979
Jun 200800131.3313.03$0
May 20080155123.1711.57$1,794
Apr 200801,404110.3110.45$14,679
Mar 20081793,837101.909.66$55,321
Feb 200803,37692.538.77$29,609
Jan 20081826,34190.388.21$68,482
Dec 20071798,59988.337.30$78,601
Nov 20071768,46591.677.29$77,858
Oct 200717610,37282.856.92$86,376
Sep 200717010,44875.846.24$78,132
Aug 200717711,56469.066.39$86,094
Jul 200735514,52770.906.39$117,967
Jun 200718214,80362.007.55$123,024
May 200718113,93458.747.85$119,962
Apr 20071787,57459.617.81$69,727
Mar 200718014,83556.927.30$118,570
Feb 200717913,81355.108.22$123,351
Jan 200736215,16750.306.73$120,235
Dec 200636114,32156.656.92$119,530
Nov 200618014,64954.207.62$121,344
Oct 200635515,21954.906.01$111,014
Sep 200617814,33760.085.04$82,913
Aug 200617915,17368.717.34$123,668
Jul 200617013,39169.376.34$96,729
Jun 200601,01966.286.38$6,505
May 20060066.016.42$0
Apr 200606,54264.397.36$48,152
Mar 2006011056.707.08$779
Feb 20060057.597.75$0
Jan 20060060.598.93$0
Dec 2005011054.9413.42$1,476

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Dec 2009 — as filed, then multipliedworked
Condensate           180 bbl  × $ 71.44 =    $12,859
Gas                   22 Mcf  × $  5.48 =       $121

────────────────────────────────────────────────────
Month total                                  $12,980

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 03/G/218741 is the state's own key, not one this site invented.