CAUSEY

Operated by LIGHTHOUSE OPERATING, INC. (P-5 500602) in the GRACEY (YEGUA) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 233259District 03Field 36238600CondensateGasSaveExport
Value, all time
$2.8 M
Oct 2007 – Jun 2021
Value, last 12 filed months
$0
at the published price for each month
Months reported
165
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 3 leases and 3 wells, and the rule below applies to all of them.

Discovered
1982-10-01
as the register files it
Field class
Oil and gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition1,292 bbl$128,057
GasProduction477,132 Mcf$2,652,136
Total$2,780,193

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 29.5280, -96.5572. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

29.52798, -96.55724 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
6,000 ft
1 wells filed one
Completion to plug
12.6 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,000 ft.

Completions filed
Oct 2007
1 of 1 wells
Plug dates filed
May 2020
1 of 1 wells

Last completion to plug: a median of 12.6 years across the 1 well that filed both dates, with the middle half between 12.6 years and 12.6 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-0893253916,000 ftOct 2007May 2020Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (165)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

165 months

Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 20200057.252.09$0
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 20190053.472.42$0
Sep 20190055.052.66$0
Aug 20190053.112.30$0
Jul 20190056.272.46$0
Jun 20190052.782.49$0
May 20190058.482.74$0
Apr 20190062.632.75$0
Mar 20190056.803.06$0
Feb 20190050.852.79$0
Jan 20190046.033.23$0
Dec 20180046.594.19$0
Nov 20180052.934.24$0
Oct 20180061.443.40$0
Sep 20180059.543.11$0
Aug 20180059.403.07$0
Jul 20180065.142.93$0
Jun 20180060.183.08$0
May 20180065.382.90$0
Apr 20180063.842.90$0
Mar 20180061.222.79$0
Feb 20180061.782.77$0
Jan 20180062.874.01$0
Dec 20170057.272.92$0
Nov 20170055.423.12$0
Oct 20170049.292.98$0
Sep 20170047.523.09$0
Aug 20170045.373.00$0
Jul 20170043.873.09$0
Jun 20170042.493.09$0
May 20170045.373.26$0
Apr 20170047.933.21$0
Mar 20170046.772.98$0
Feb 20170050.452.95$0
Jan 20170049.413.42$0
Dec 20160048.763.72$0
Nov 20160042.492.64$0
Oct 20160046.193.09$0
Sep 20160041.553.10$0
Aug 20160041.442.92$0
Jul 20160041.622.92$0
Jun 20160045.352.69$0
May 20160042.521.99$0
Apr 20160036.561.99$0
Mar 20160033.011.79$0
Feb 20160026.472.06$0
Jan 20160027.352.36$0
Dec 20150032.362.00$0
Nov 20150038.792.17$0
Oct 20150043.552.43$0
Sep 20150042.992.76$0
Aug 2015095140.162.87$2,732
Jul 2015093348.152.95$2,748
Jun 201503,08556.152.88$8,894
May 201503,65955.212.96$10,814
Apr 201503,69249.822.71$9,993
Mar 201504,33542.892.93$12,722
Feb 201504,17344.662.98$12,420
Jan 201503,93543.433.10$12,201
Dec 201403,60154.693.59$12,932
Nov 201404,29570.464.25$18,262
Oct 201404,20078.303.90$16,384
Sep 201404,36586.164.05$17,658
Aug 201404,16289.394.04$16,794
Jul 201404,46996.564.18$18,679
Jun 201403,91998.164.74$18,564
May 201403,90594.734.73$18,457
Apr 201403,97595.944.81$19,116
Mar 201404,84195.895.06$24,480
Feb 201404,19197.406.19$25,951
Jan 201404,68590.404.86$22,772
Dec 201304,76291.824.35$20,736
Nov 201304,72688.853.74$17,667
Oct 201304,90797.423.78$18,545
Sep 201304,704104.113.72$17,488
Aug 201304,556104.253.52$16,049
Jul 201304,571102.523.72$16,994
Jun 201304,79494.403.93$18,857
May 201304,96194.834.15$20,584
Apr 201304,96893.964.28$21,276
Mar 201305,31793.623.91$20,805
Feb 201305,35491.233.42$18,310
Jan 201302,15191.603.42$7,356
Dec 2012054486.773.42$1,861
Nov 201202,26386.953.62$8,203
Oct 201203,05689.383.40$10,389
Sep 201203,50294.672.92$10,220
Aug 201203,23292.662.91$9,399
Jul 201203,37585.133.02$10,195
Jun 201203,92779.822.52$9,892
May 201203,71791.612.49$9,249
Apr 201203,188101.652.00$6,366
Mar 201203,788105.052.22$8,417
Feb 201203,183101.102.57$8,181
Jan 201203,01898.092.73$8,251
Dec 201102,97696.873.24$9,641
Nov 201102,80495.723.31$9,285
Oct 201102,65384.983.65$9,680
Sep 201102,83783.623.99$11,308
Aug 201103,15783.404.15$13,099
Jul 201103,40294.144.52$15,368
Jun 201103,67292.904.64$17,038
May 201103,21698.134.40$14,166
Apr 201103,038105.964.33$13,165
Mar 201103,14296.364.06$12,748
Feb 201103,28085.644.18$13,710
Jan 201102,92586.504.59$13,422
Dec 201003,45985.734.35$15,039
Nov 201003,43380.843.80$13,029
Oct 201003,33178.103.51$11,688
Sep 201004,08872.633.98$16,268
Aug 201004,27673.684.42$18,897
Jul 201004,89372.554.74$23,176
Jun 201004,23970.364.91$20,815
May 201004,58071.124.24$19,397
Apr 201004,69181.694.12$19,340
Mar 201005,01678.394.39$22,014
Feb 201005,18373.585.44$28,208
Jan 201005,60074.365.96$33,399
Dec 200905,14071.445.48$28,186
Nov 200903,82674.593.75$14,353
Oct 200903,97072.544.11$16,318
Sep 200904,53365.543.06$13,893
Aug 200904,00067.423.22$12,874
Jul 200903,10661.133.46$10,761
Jun 200902,98366.163.90$11,619
May 200903,78654.743.93$14,863
Apr 200903,84446.773.59$13,790
Mar 200904,27442.144.06$17,348
Feb 200903,29432.814.63$15,261
Jan 200904,01635.865.37$21,570
Dec 200804,48537.105.98$26,807
Nov 200804,24255.496.86$29,102
Oct 200804,15575.246.92$28,761
Sep 200801,579101.767.88$12,438
Aug 200800114.228.48$0
Jul 200800131.0811.39$0
Jun 200818175131.3313.03$24,748
May 200800123.1711.57$0
Apr 2008014,711110.3110.45$153,801
Mar 200836835,922101.909.66$384,652
Feb 200818530,51992.538.77$284,787
Jan 200818624,23790.388.21$215,693
Dec 200737232,81688.337.30$272,480
Nov 2007019,79391.677.29$144,325
Oct 20070082.856.92$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Aug 2015 — as filed, then multipliedworked
Condensate             0 bbl  × $ 40.16 =         $0
Gas                  951 Mcf  × $  2.87 =     $2,732

────────────────────────────────────────────────────
Month total                                   $2,732

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 03/G/233259 is the state's own key, not one this site invented.