Operated by VIPER S.W.D., LLC (P-5 886209) in the WOLFPACK (LOWER WILCOX CONS.) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 236349District 03Field 984285002 tax incentive programmesCondensateGasSaveExport
Value, all time
$5.9 M
Aug 2007 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
226
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 3 leases and 3 wells, and the rule below applies to all of them.

Discovered
2005-12-30
as the register files it
Field class
Gas
the register's own label
Between wells
1,200 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2006-08-08.

The Commission's schedule remark for this field reads: AOF-1 AND AOF-2 EFFECTIVE 05/01/2007.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112008-09-17184588
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition460 bbl$37,861
GasProduction935,785 Mcf$5,817,600
Total$5,855,462

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 29.3499, -96.5712. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

29.34992, -96.57123 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
15,850 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 15,850 ft.

Completions filed
Sep 2010
1 of 1 wells

1 well

42-08932531315,850 ftSep 2010

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (226)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

226 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 202302,85972.852.39$6,842
Feb 202303,34275.112.47$8,240
Jan 202302,16176.533.39$7,321
Dec 2022017576.415.73$1,003
Nov 2022049685.005.65$2,801
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 20200057.252.09$0
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 20190053.472.42$0
Sep 20190055.052.66$0
Aug 20190053.112.30$0
Jul 20190056.272.46$0
Jun 20190052.782.49$0
May 20190058.482.74$0
Apr 20190062.632.75$0
Mar 20190056.803.06$0
Feb 20190050.852.79$0
Jan 20190046.033.23$0
Dec 20180046.594.19$0
Nov 20180052.934.24$0
Oct 20180061.443.40$0
Sep 20180059.543.11$0
Aug 20180059.403.07$0
Jul 20180065.142.93$0
Jun 20180060.183.08$0
May 20180065.382.90$0
Apr 20180063.842.90$0
Mar 20180061.222.79$0
Feb 20180061.782.77$0
Jan 20180062.874.01$0
Dec 20170057.272.92$0
Nov 20170055.423.12$0
Oct 20170049.292.98$0
Sep 20170047.523.09$0
Aug 20170045.373.00$0
Jul 20170043.873.09$0
Jun 20170042.493.09$0
May 20170045.373.26$0
Apr 20170047.933.21$0
Mar 20170046.772.98$0
Feb 20170050.452.95$0
Jan 20170049.413.42$0
Dec 20160048.763.72$0
Nov 20169042.492.64$382
Oct 201601,50946.193.09$4,663
Sep 201602,02941.553.10$6,291
Aug 201601,69441.442.92$4,954
Jul 201601,64441.622.92$4,808
Jun 201601,60345.352.69$4,305
May 201601,65542.521.99$3,295
Apr 201601,62036.561.99$3,225
Mar 201601,67733.011.79$3,009
Feb 201601,56926.472.06$3,238
Jan 201601,61327.352.36$3,814
Dec 201502,55132.362.00$5,106
Nov 201501,72938.792.17$3,747
Oct 201501,73343.552.43$4,205
Sep 201501,35442.992.76$3,735
Aug 201501,43440.162.87$4,119
Jul 201501,60448.152.95$4,724
Jun 201501,57356.152.88$4,535
May 201501,87655.212.96$5,544
Apr 201502,96849.822.71$8,033
Mar 201503,32742.892.93$9,764
Feb 201502,91244.662.98$8,667
Jan 201503,40943.433.10$10,570
Dec 201403,75154.693.59$13,471
Nov 201403,57870.464.25$15,213
Oct 201403,64278.303.90$14,207
Sep 201404,01086.164.05$16,222
Aug 201404,24689.394.04$17,133
Jul 201404,22096.564.18$17,638
Jun 201403,38398.164.74$16,025
May 201404,61894.734.73$21,827
Apr 201404,41895.944.81$21,247
Mar 2014664,90095.895.06$31,107
Feb 201404,58797.406.19$28,403
Jan 201404,96190.404.86$24,114
Dec 201305,18491.824.35$22,574
Nov 201305,48788.853.74$20,512
Oct 201305,30597.423.78$20,050
Sep 201302,052104.113.72$7,629
Aug 201301,578104.253.52$5,559
Jul 201302,843102.523.72$10,570
Jun 201301,01394.403.93$3,985
May 201301,53294.834.15$6,356
Apr 201302,71393.964.28$11,619
Mar 201303,26893.623.91$12,787
Feb 201301,92791.233.42$6,590
Jan 201302,02591.603.42$6,925
Dec 201202,07486.773.42$7,093
Nov 201203,01686.953.62$10,933
Oct 201203,83289.383.40$13,028
Sep 201202,66794.672.92$7,783
Aug 201202,58192.662.91$7,506
Jul 201202,85685.133.02$8,627
Jun 201203,03579.822.52$7,645
May 201203,46891.612.49$8,629
Apr 201204,109101.652.00$8,205
Mar 201205,148105.052.22$11,439
Feb 201204,806101.102.57$12,353
Jan 201204,56598.092.73$12,481
Dec 201103,51196.873.24$11,375
Nov 20111763,79695.723.31$29,416
Oct 201105,27184.983.65$19,231
Sep 201104,01583.623.99$16,003
Aug 201105,92383.404.15$24,576
Jul 201107,69894.144.52$34,774
Jun 201108,60592.904.64$39,926
May 201108,81498.134.40$38,824
Apr 201106,672105.964.33$28,912
Mar 201107,54296.364.06$30,600
Feb 201105,20985.644.18$21,774
Jan 201106,82386.504.59$31,309
Dec 201005,81185.734.35$25,265
Nov 201005,16080.843.80$19,584
Oct 201006,58578.103.51$23,106
Sep 201005,23772.633.98$20,840
Aug 201003,58973.684.42$15,861
Jul 201002,15172.554.74$10,188
Jun 201005,11670.364.91$25,122
May 201002,46771.124.24$10,448
Apr 201005,12781.694.12$21,137
Mar 201005,10978.394.39$22,422
Feb 201005,08073.585.44$27,647
Jan 201005,87774.365.96$35,051
Dec 200908,29071.445.48$45,460
Nov 200908,05274.593.75$30,207
Oct 200909,52372.544.11$39,142
Sep 20091556,79965.543.06$30,996
Aug 2009010,15567.423.22$32,684
Jul 2009010,35161.133.46$35,861
Jun 2009010,75666.163.90$41,895
May 2009012,13354.743.93$47,631
Apr 2009012,91146.773.59$46,318
Mar 2009015,21042.144.06$61,737
Feb 2009014,76332.814.63$68,397
Jan 2009016,44635.865.37$88,331
Dec 2008016,13337.105.98$96,429
Nov 2008016,87455.496.86$115,762
Oct 2008018,43875.246.92$127,627
Sep 2008017,062101.767.88$134,399
Aug 2008021,185114.228.48$179,713
Jul 2008023,557131.0811.39$268,301
Jun 2008023,082131.3313.03$300,819
May 2008027,571123.1711.57$319,115
Apr 2008027,636110.3110.45$288,931
Mar 2008031,181101.909.66$301,335
Feb 2008030,19592.538.77$264,828
Jan 2008037,45290.388.21$307,321
Dec 2007039,07088.337.30$285,288
Nov 2007043,94891.677.29$320,456
Oct 2007949,36282.856.92$342,428
Sep 20074361,38175.846.24$386,534
Aug 200725,56769.066.39$35,700

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Mar 2023 — as filed, then multipliedworked
Condensate             0 bbl  × $ 72.85 =         $0
Gas                2,859 Mcf  × $  2.39 =     $6,842

────────────────────────────────────────────────────
Month total                                   $6,842

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 03/G/236349 is the state's own key, not one this site invented.