BOWERS

Operated by DJ EXPLORATION, INC. (P-5 221664) in the COLLEGEPORT (7-A) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 242854District 03Field 19637570CondensateGasSaveExport
Value, all time
$1.7 M
Aug 2008 – Apr 2015
Value, last 12 filed months
$0
at the published price for each month
Months reported
81
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6 leases and 6 wells, and the rule below applies to all of them.

Discovered
1969-04-19
as the register files it
Field class
Gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

The Commission's schedule remark for this field reads: FORMULA ADOPTED.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition667 bbl$54,612
GasProduction389,147 Mcf$1,639,771
Total$1,694,383

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 28.7123, -96.0719. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

28.71233, -96.07193 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
5,650 ft
1 wells filed one
Completion to plug
6.7 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 5,650 ft.

Completions filed
Aug 2008
1 of 1 wells
Plug dates filed
Apr 2015
1 of 1 wells

Last completion to plug: a median of 6.7 years across the 1 well that filed both dates, with the middle half between 6.7 years and 6.7 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-3213215015,650 ftAug 2008Apr 2015Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (81)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

81 months

Apr 20150049.822.71$0
Mar 20150042.892.93$0
Feb 20150044.662.98$0
Jan 20150043.433.10$0
Dec 20140054.693.59$0
Nov 20140070.464.25$0
Oct 20140078.303.90$0
Sep 20140086.164.05$0
Aug 20140089.394.04$0
Jul 20140096.564.18$0
Jun 20140098.164.74$0
May 20140094.734.73$0
Apr 201401,89095.944.81$9,089
Mar 201401,08695.895.06$5,492
Feb 2014068097.406.19$4,211
Jan 201402,70390.404.86$13,139
Dec 201303,47691.824.35$15,136
Nov 201304,12588.853.74$15,420
Oct 201306,38597.423.78$24,131
Sep 201305,453104.113.72$20,273
Aug 201303,741104.253.52$13,178
Jul 201306,239102.523.72$23,195
Jun 2013072294.403.93$2,840
May 20130094.834.15$0
Apr 20130093.964.28$0
Mar 20130093.623.91$0
Feb 2013039891.233.42$1,361
Jan 201302,94591.603.42$10,072
Dec 201204,73986.773.42$16,208
Nov 201205,82686.953.62$21,119
Oct 201205,44689.383.40$18,515
Sep 20121738,32494.672.92$40,671
Aug 201209,69292.662.91$28,186
Jul 201203,95285.133.02$11,938
Jun 201207,73879.822.52$19,492
May 201207,75891.612.49$19,304
Apr 201201,571101.652.00$3,137
Mar 201202,090105.052.22$4,644
Feb 201204,756101.102.57$12,224
Jan 20120898.092.73$22
Dec 201105,57396.873.24$18,055
Nov 201106,05395.723.31$20,043
Oct 201106,12984.983.65$22,362
Sep 201105,25383.623.99$20,937
Aug 201105,91883.404.15$24,556
Jul 201104,82694.144.52$21,800
Jun 20111696,83492.904.64$47,409
May 201107,00598.134.40$30,856
Apr 201106,917105.964.33$29,973
Mar 201107,06896.364.06$28,677
Feb 201106,14785.644.18$25,694
Jan 201106,84886.504.59$31,424
Dec 201006,91085.734.35$30,043
Nov 201007,05680.843.80$26,780
Oct 201007,14578.103.51$25,071
Sep 20101747,05172.633.98$40,697
Aug 201007,13173.684.42$31,514
Jul 201007,77672.554.74$36,831
Jun 201007,07170.364.91$34,721
May 201007,52771.124.24$31,879
Apr 201006,98481.694.12$28,793
Mar 201007,43178.394.39$32,612
Feb 201006,72373.585.44$36,589
Jan 201007,72574.365.96$46,073
Dec 200907,86671.445.48$43,135
Nov 200907,19974.593.75$27,007
Oct 200907,80672.544.11$32,085
Sep 20091517,82365.543.06$33,872
Aug 200907,77167.423.22$25,011
Jul 200907,75261.133.46$26,857
Jun 200907,73466.163.90$30,124
May 200908,07554.743.93$31,700
Apr 200907,60146.773.59$27,269
Mar 200907,81842.144.06$31,733
Feb 200907,68732.814.63$35,614
Jan 200908,58635.865.37$46,115
Dec 200809,11937.105.98$54,506
Nov 200808,07055.496.86$55,363
Oct 200806,44075.246.92$44,578
Sep 200804,861101.767.88$38,291
Aug 200804,095114.228.48$34,738

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Apr 2014 — as filed, then multipliedworked
Condensate             0 bbl  × $ 95.94 =         $0
Gas                1,890 Mcf  × $  4.81 =     $9,089

────────────────────────────────────────────────────
Month total                                   $9,089

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 03/G/242854 is the state's own key, not one this site invented.