BEAR CREEK SOUTHEAST UNIT

Operated by ZARVONA ENERGY LLC (P-5 950523) in the DOUBLE A WELLS, N (AUSTIN CHALK) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 251937District 03Field 25646100CondensateGasSave
Value, all time
$37.1 M
Feb 2008 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
220
no gaps in the span
Streams
2
condensate, gas

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition231,650 bbl$20,642,617
GasProduction2,184,094 Mcf$16,414,127
Total$37,056,745

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.7707, -94.7027. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.77070, -94.70268 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
13,500 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 13,500 ft.

Completions filed
Feb 2008
1 of 1 wells

1 well

42-373311051H13,500 ftFeb 2008

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (220)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

220 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 20200057.252.09$0
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 20190053.472.42$0
Sep 20190055.052.66$0
Aug 20190053.112.30$0
Jul 20190056.272.46$0
Jun 20190052.782.49$0
May 20190058.482.74$0
Apr 20190062.632.75$0
Mar 20190056.803.06$0
Feb 20190050.852.79$0
Jan 20190746.033.23$23
Dec 20180046.594.19$0
Nov 20180052.934.24$0
Oct 20180061.443.40$0
Sep 20180059.543.11$0
Aug 20180159.403.07$3
Jul 20180165.142.93$3
Jun 201801060.183.08$31
May 20180665.382.90$17
Apr 20180063.842.90$0
Mar 201818915461.222.79$12,000
Feb 201808161.782.77$224
Jan 2018019662.874.01$786
Dec 201709757.272.92$283
Nov 2017033555.423.12$1,045
Oct 20170049.292.98$0
Sep 201719719247.523.09$9,954
Aug 2017016145.373.00$484
Jul 201707143.873.09$219
Jun 201709442.493.09$290
May 20171873345.373.26$8,592
Apr 201706347.933.21$202
Mar 2017026746.772.98$797
Feb 2017020250.452.95$596
Jan 2017019949.413.42$680
Dec 2016021448.763.72$797
Nov 201618114242.492.64$8,066
Oct 2016028546.193.09$881
Sep 2016026541.553.10$822
Aug 2016027141.442.92$793
Jul 201618027141.622.92$8,284
Jun 2016023445.352.69$628
May 201617832442.521.99$8,214
Apr 201607236.561.99$143
Mar 2016039433.011.79$707
Feb 201607926.472.06$163
Jan 2016030227.352.36$714
Dec 201508632.362.00$172
Nov 2015029038.792.17$629
Oct 20150043.552.43$0
Sep 2015178042.992.76$7,652
Aug 2015028640.162.87$822
Jul 2015023248.152.95$683
Jun 201517929456.152.88$10,898
May 2015076455.212.96$2,258
Apr 201517621749.822.71$9,356
Mar 2015028542.892.93$836
Feb 2015090244.662.98$2,685
Jan 201518120743.433.10$8,503
Dec 201401,16354.693.59$4,177
Nov 201417593170.464.25$16,289
Oct 201402,08478.303.90$8,130
Sep 20140386.164.05$12
Aug 2014174689.394.04$15,578
Jul 201417348096.564.18$18,711
Jun 201401298.164.74$57
May 20141806094.734.73$17,335
Apr 201403495.944.81$164
Mar 2014014795.895.06$743
Feb 20141788197.406.19$17,839
Jan 2014010390.404.86$501
Dec 201303391.824.35$144
Nov 201317610188.853.74$16,015
Oct 201317920497.423.78$18,209
Sep 20130432104.113.72$1,606
Aug 2013180405104.253.52$20,192
Jul 20130298102.523.72$1,108
Jun 20131776294.403.93$16,953
May 201306194.834.15$253
Apr 201322526993.964.28$22,293
Mar 2013044193.623.91$1,726
Feb 2013041091.233.42$1,402
Jan 201336163691.603.42$35,243
Dec 2012073486.773.42$2,510
Nov 201218190586.953.62$19,019
Oct 20121674,76889.383.40$31,136
Sep 201209594.672.92$277
Aug 201217674092.662.91$18,460
Jul 201217710,55185.133.02$46,940
Jun 201236047179.822.52$29,922
May 201218044091.612.49$17,585
Apr 2012359840101.652.00$38,170
Mar 20123583,410105.052.22$45,185
Feb 20123621,394101.102.57$40,181
Jan 20125074,28998.092.73$61,458
Dec 20115442,76196.873.24$61,642
Nov 20115383,34595.723.31$62,574
Oct 20113644,01984.983.65$45,596
Sep 20118887,16083.623.99$102,793
Aug 20111,43915,33983.404.15$183,659
Jul 20111,24112,91394.144.52$175,159
Jun 20111,24310,79392.904.64$165,553
May 20111,61913,26198.134.40$217,285
Apr 20111,44312,370105.964.33$206,503
Mar 20111,62014,89496.364.06$216,533
Feb 20111,45814,76185.644.18$186,564
Jan 20112,21716,70186.504.59$268,408
Dec 20101,81316,72785.734.35$228,153
Nov 20101,62518,20280.843.80$200,448
Oct 20101,78119,58378.103.51$207,811
Sep 20102,32619,51372.633.98$246,589
Aug 20101,96019,63173.684.42$231,169
Jul 20102,14620,35172.554.74$252,085
Jun 20102,36320,38670.364.91$266,364
May 20102,22421,78471.124.24$250,431
Apr 20102,31322,83681.694.12$283,095
Mar 20102,50722,47178.394.39$295,142
Feb 20102,52224,20873.585.44$317,317
Jan 20103,10929,53474.365.96$407,329
Dec 20092,52530,48271.445.48$347,542
Nov 20093,05530,37074.593.75$341,806
Oct 20093,47132,44972.544.11$385,160
Sep 20093,29933,08465.543.06$317,611
Aug 20093,49133,95967.423.22$344,660
Jul 20094,17937,68961.133.46$386,036
Jun 20093,86839,63466.163.90$410,281
May 20094,44140,02154.743.93$400,213
Apr 20094,65442,53846.773.59$370,273
Mar 20094,71042,65442.144.06$371,612
Feb 20094,73345,41132.814.63$365,679
Jan 20096,10256,44035.865.37$521,957
Dec 20086,14456,80337.105.98$567,462
Nov 20086,45964,31355.496.86$799,620
Oct 20088,09474,17575.246.92$1,122,430
Sep 20086,35956,954101.767.88$1,095,724
Aug 20088,83592,734114.228.48$1,795,798
Jul 200810,459107,209131.0811.39$2,592,015
Jun 20089,87698,345131.3313.03$2,578,709
May 200815,150153,495123.1711.57$3,642,621
Apr 200823,175232,275110.3110.45$4,984,837
Mar 200840,437353,838101.909.66$7,540,046
Feb 20080092.538.77$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jan 2019 — as filed, then multipliedworked
Condensate             0 bbl  × $ 46.03 =         $0
Gas                    7 Mcf  × $  3.23 =        $23

────────────────────────────────────────────────────
Month total                                      $23

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 03/G/251937 is the state's own key, not one this site invented.