PRASIFKA

Operated by AMRWR, LLC (P-5 102699) in the MAGNET WITHERS (MIOCENE 3900) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 278618District 03Field 56688807GasSaveExport
Value, all time
$824 k
Aug 2008 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
204
10 months not filed
Streams
1
gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 8 leases and 8 wells, and the rule below applies to all of them.

Discovered
1976-06-09
as the register files it
Field class
Gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

The Commission's schedule remark for this field reads: ALLOCATION FORMULA EFFECTIVE 05/01/2016.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
GasProduction272,084 Mcf$824,358
Total$824,358

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 29.1634, -95.9983. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

29.16338, -95.99829 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
4,050 ft
1 wells filed one
Completion to plug
1 well filed both, dated out of order

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 4,050 ft.

Completions filed
Feb 2008
1 of 1 wells
Plug dates filed
May 1985
1 of 1 wells

Last completion to plug: no median is published. 1 well on this lease filed both dates, and on that one the last completion is dated after the plug date, so there is no interval to take a median of. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-4813276314,050 ftFeb 2008May 1985

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (204)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

204 months

May 20260106.413.05$0
Apr 2026098.932.87$0
Mar 2026089.753.15$0
Feb 2026063.503.75$0
Jan 2026059.138.00$0
Dec 2025056.664.41$0
Nov 2025058.593.93$0
Oct 2025059.383.30$0
Sep 2025062.743.08$0
Aug 2025063.933.01$0
Jul 2025066.743.32$0
Jun 2025066.483.13$0
May 2025060.553.23$0
Apr 2025062.363.54$0
Mar 2025067.704.27$0
Feb 2025070.884.34$0
Jan 2025074.324.28$0
Dec 2024068.993.12$0
Nov 2024069.052.20$0
Oct 2024071.372.28$0
Sep 2024069.612.36$0
Aug 2024075.632.06$0
Jul 2024079.932.15$0
Jun 2024078.082.63$0
May 2024078.812.20$0
Apr 2024084.451.66$0
Mar 2024080.301.55$0
Feb 2024076.091.78$0
Jan 2024073.023.30$0
Dec 2023071.262.61$0
Nov 2023077.892.81$0
Oct 2023085.443.09$0
Sep 2023089.042.74$0
Aug 2023080.522.67$0
Jul 2023074.852.64$0
Jun 2023068.962.26$0
May 2023070.622.23$0
Apr 2023078.122.24$0
Mar 2023072.852.39$0
Feb 2023075.112.47$0
Jan 2023076.533.39$0
Dec 2022076.415.73$0
Nov 2022085.005.65$0
Oct 2022087.185.86$0
Sep 2022084.888.16$0
Aug 2022094.529.13$0
Jul 20220101.587.54$0
Jun 20220115.097.98$0
May 20220109.378.43$0
Apr 20220104.226.84$0
Mar 20220108.885.08$0
Feb 2022091.054.86$0
Jan 2022081.844.54$0
Dec 2021071.323.90$0
Nov 2021077.435.24$0
Oct 2021079.795.71$0
Sep 2021069.865.35$0
Aug 2021066.024.22$0
Jul 2021070.783.98$0
Jun 2021069.493.38$0
May 2021063.483.02$0
Apr 2021060.362.76$0
Mar 2021061.302.72$0
Feb 2021057.805.55$0
Jan 2021050.412.81$0
Dec 2020044.642.68$0
Nov 2020038.772.71$0
Oct 2020036.972.48$0
Sep 2020037.091.99$0
Aug 2020039.982.39$0
Jul 2020038.371.83$0
Jun 2020034.901.69$0
May 2020016.921.81$0
Apr 2020014.751.80$0
Mar 2020030.341.86$0
Feb 2020049.881.98$0
Jan 2020057.252.09$0
Dec 2019059.012.30$0
Nov 2019055.302.75$0
Oct 2019053.472.42$0
Sep 2019055.052.66$0
Aug 2019053.112.30$0
Jul 2019056.272.46$0
Jun 2019052.782.49$0
May 2019058.482.74$0
Apr 2019062.632.75$0
Mar 2019056.803.06$0
Feb 2019050.852.79$0
Jan 2019046.033.23$0
Dec 2018046.594.19$0
Nov 2018052.934.24$0
Oct 2018061.443.40$0
Sep 2018059.543.11$0
Aug 2018059.403.07$0
Jul 2018065.142.93$0
Jun 20182,97060.183.08$9,138
May 20182,78065.382.90$8,064
Apr 20183,91063.842.90$11,342
Mar 2018061.222.79$0
Feb 20184,41061.782.77$12,199
Jan 20188,04062.874.01$32,235
Dec 20178,13057.272.92$23,752
Nov 20177,54055.423.12$23,512
Oct 20176,44049.292.98$19,215
Sep 20177,38047.523.09$22,784
Aug 20177,38045.373.00$22,172
Jul 20177,38043.873.09$22,784
Jun 20177,43042.493.09$22,938
May 20177,87045.373.26$25,683
Apr 20177,98047.933.21$25,629
Mar 20178,11546.772.98$24,213
Feb 20178,41050.452.95$24,831
Jan 20178,56049.413.42$29,265
Dec 20168,87048.763.72$33,022
Nov 20168,87742.492.64$23,474
Oct 20168,85446.193.09$27,361
Sep 20168,96541.553.10$27,797
Aug 20168,99041.442.92$26,290
Jul 20168,84141.622.92$25,854
Jun 20168,41045.352.69$22,588
May 20168,48042.521.99$16,884
Apr 20169,51036.561.99$18,935
Mar 20169,58533.011.79$17,196
Feb 20169,60326.472.06$19,817
Jan 201610,42027.352.36$24,637
Dec 20159,67732.362.00$19,368
Nov 2015038.792.17$0
Oct 2015043.552.43$0
Sep 2015042.992.76$0
Aug 2015040.162.87$0
Jul 2015048.152.95$0
Jun 2015056.152.88$0
May 2015055.212.96$0
Apr 2015049.822.71$0
Mar 2015042.892.93$0
Feb 2015044.662.98$0
Jan 2015043.433.10$0
Dec 2014054.693.59$0
Nov 2014070.464.25$0
Oct 2014078.303.90$0
Sep 2014086.164.05$0
Aug 2014089.394.04$0
Jul 2014096.564.18$0
Jun 2014098.164.74$0
May 2014094.734.73$0
Apr 201458695.944.81$2,818
Mar 201414195.895.06$713
Feb 201474597.406.19$4,613
Jan 201469290.404.86$3,364
Dec 201373291.824.35$3,187
Nov 20131,03788.853.74$3,877
Oct 201358497.423.78$2,207
Sep 2013690104.113.72$2,565
Aug 2013890104.253.52$3,135
Jul 20131,129102.523.72$4,197
Jun 201375094.403.93$2,950
May 201381094.834.15$3,361
Apr 201366093.964.28$2,827
Mar 201372093.623.91$2,817
Feb 201365091.233.42$2,223
Jan 201381391.603.42$2,780
Dec 20121,16086.773.42$3,967
Nov 20121,00486.953.62$3,639
Oct 20121,03289.383.40$3,508
Sep 201272294.672.92$2,107
Aug 201277992.662.91$2,265
Jul 201289785.133.02$2,710
Jun 201271279.822.52$1,794
May 201292691.612.49$2,304
Apr 2012833101.652.00$1,663
Mar 20121,115105.052.22$2,478
Feb 2012664101.102.57$1,707
Jan 201283298.092.73$2,275
Dec 201168696.873.24$2,222
Nov 201183195.723.31$2,752
Oct 201180484.983.65$2,933
Sep 201170283.623.99$2,798
Aug 201168183.404.15$2,826
Jul 201170294.144.52$3,171
Jun 201153592.904.64$2,482
Jul 2010072.554.74$0
Jun 201044370.364.91$2,175
May 201023171.124.24$978
Apr 201037081.694.12$1,525
Mar 201035678.394.39$1,562
Feb 201017173.585.44$931
Jan 201026074.365.96$1,551
Dec 200926171.445.48$1,431
Nov 200932074.593.75$1,200
Oct 200923972.544.11$982
Sep 200926565.543.06$812
Aug 200926167.423.22$840
Jul 200927661.133.46$956
Jun 200928866.163.90$1,122
May 200926554.743.93$1,040
Apr 200922246.773.59$796
Mar 200923442.144.06$950
Feb 200925232.814.63$1,168
Jan 200946335.865.37$2,487
Dec 200886537.105.98$5,170
Nov 200875655.496.86$5,186
Oct 20082,66275.246.92$18,426
Sep 2008784101.767.88$6,176
Aug 2008787114.228.48$6,676

Not filed, and not zero: Aug 2010 – May 2011 (10 months). The Railroad Commission holds no report for those months, so this page shows none — a zero would state that the lease produced nothing.

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jun 2018 — as filed, then multipliedworked
Gas                2,970 Mcf  × $  3.08 =     $9,138

────────────────────────────────────────────────────
Month total                                   $9,138

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 03/G/278618 is the state's own key, not one this site invented.