TIDWELL

Operated by KALER ENERGY CORP. (P-5 450261) in the LEAGUE CITY, WEST (ANOMALINA) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 293296District 03Field 52683500CondensateGasSaveExport
Value, all time
$13.0 M
Dec 2021 – May 2026
Value, last 12 filed months
$721 k
at the published price for each month
Months reported
53
1 month not filed
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 5 leases and 5 wells, and the rule below applies to all of them.

Discovered
1959-06-12
as the register files it
Field class
Gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

The Commission's schedule remark for this field reads: AOF-1 AND AOF-2 EFFECTIVE 07/01/2025.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition37,187 bbl$3,141,116
GasProduction2,392,488 Mcf$9,905,331
Total$13,046,447

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 29.4761, -95.1410. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

29.47607, -95.14097 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
11,941 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 11,941 ft.

Completions filed
Dec 2021
1 of 1 wells

1 well

42-16731535311,941 ftDec 2021

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (53)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

53 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 2026078489.753.15$2,469
Feb 2026023563.503.75$881
Jan 20261834,59459.138.00$47,563
Dec 202518015,71856.664.41$79,568
Nov 202518526,02058.593.93$113,005
Oct 202518129,09259.383.30$106,892
Sep 202533929,29362.743.08$111,401
Aug 202518021,77263.933.01$77,145
Jul 202518124,06466.743.32$91,857
Jun 202517425,10166.483.13$90,102
May 202518130,17360.553.23$108,488
Apr 202518131,04762.363.54$121,290
Mar 202518531,67967.704.27$147,741
Feb 202533428,70170.884.34$148,260
Jan 202517831,05574.324.28$146,103
Dec 202433627,89068.993.12$110,236
Nov 202417824,49369.052.20$66,137
Oct 202417325,94171.372.28$71,529
Sep 202416825,22369.612.36$71,331
Aug 202437139,49975.632.06$109,570
Jul 202437029,67879.932.15$93,281
Jun 202417634,93378.082.63$105,755
May 202436431,75978.812.20$98,507
Apr 202438035,79584.451.66$91,482
Mar 202456729,10880.301.55$90,506
Feb 202473559,33976.091.78$161,766
Jan 202475866,27473.023.30$273,898
Dec 202390882,58971.262.61$280,321
Nov 202373713,73077.892.81$95,953
Oct 202336515,66985.443.09$79,560
Sep 202373865,36989.042.74$244,498
Aug 20231,09386,10480.522.67$318,154
Jul 20231,26687,06774.852.64$324,774
Jun 20231,27791,92368.962.26$295,668
May 20231,26986,81770.622.23$282,993
Apr 20231,29479,39278.122.24$278,748
Mar 20231,28483,27972.852.39$292,839
Feb 20231,46373,50475.112.47$291,123
Jan 20231,64678,40376.533.39$391,576
Dec 202273585,49076.415.73$545,940
Nov 20221,65885,49085.005.65$623,624
Oct 20221,82490,11787.185.86$687,441
Sep 20221,83686,92784.888.16$865,484
Aug 20221,83786,70294.529.13$964,976
Jul 20221,59873,003101.587.54$712,919
Jun 20221,64074,580115.097.98$783,687
May 20221,98369,044109.378.43$799,132
Apr 20221,29656,204104.226.84$519,370
Mar 20221,28545,625108.885.08$371,522
Feb 202291736,20091.054.86$259,383
Dec 20210071.323.90$0

Not filed, and not zero: Jan 2022. The Railroad Commission holds no report for those months, so this page shows none — a zero would state that the lease produced nothing.

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Mar 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $ 89.75 =         $0
Gas                  784 Mcf  × $  3.15 =     $2,469

────────────────────────────────────────────────────
Month total                                   $2,469

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 03/G/293296 is the state's own key, not one this site invented.