STOVALL

Operated by KEN PETROLEUM CORPORATION (P-5 455775) in the DABOVAL (FRIO 12-6680) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 83127District 03Field 22688532CondensateGasSaveExport
Value, all time
$194 k
Jan 1993 – Sep 2000
Value, last 12 filed months
$48 k
at the published price for each month
Months reported
93
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 3 leases and 3 wells, and the rule below applies to all of them.

Discovered
1967-04-10
as the register files it
Field class
Oil and gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

The Commission's schedule remark for this field reads: ONE WELL FIELD EFF 7-1-98

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition1,004 bbl$16,863
GasProduction166,511 Mcf$176,670
Total$193,534

90,120 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 29.0887, -96.2820. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

29.08868, -96.28205 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
7,260 ft
1 wells filed one
Completion to plug
5.5 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,260 ft.

Completions filed
Jun 2000
1 of 1 wells
Plug dates filed
Dec 2005
1 of 1 wells

Last completion to plug: a median of 5.5 years across the 1 well that filed both dates, with the middle half between 5.5 years and 5.5 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-4813179427,260 ftJun 2000Dec 2005Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (93)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

93 months

Sep 20000031.875.19$0
Aug 20000029.644.54$0
Jul 2000146028.534.09$4,165
Jun 20000029.304.40$0
May 20000027.263.68$0
Apr 200002,08624.513.12$6,500
Mar 200005,76828.422.86$16,495
Feb 200005,46927.622.73$14,911
Jan 20000025.272.48$0
Dec 1999085624.282.42$2,075
Nov 199901,40423.192.43$3,417
Oct 199901220.982.80$34
Sep 1999082521.752.62$2,161
Aug 199901,15019.262.88$3,307
Jul 199901,24917.892.37$2,963
Jun 199901,18515.942.36$2,799
May 199901,35815.792.32$3,152
Apr 199901,58715.102.21$3,504
Mar 199901,91712.471.84$3,524
Feb 19991861,4379.981.82$4,468
Jan 199901,19510.381.90$2,270
Dec 199802,0109.201.77$3,564
Nov 199801,52910.892.19$3,342
Oct 199804,34412.421.97$8,554
Sep 199804,85012.592.08$10,101
Aug 199804,94411.301.91$9,430
Jul 199804,19611.742.24$9,388
Jun 199804,83211.242.24$10,810
May 19981808,58612.622.21$21,215
Apr 199801,32313.042.51$3,315
Mar 199801,13012.802.31$2,610
Feb 199801,19913.952.30$2,757
Jan 199801,13514.702.15$2,446
Dec 19971871,13616.322.41$5,791
Nov 19970018.193.09$0
Oct 1997060219.253.15$1,896
Sep 199718079017.742.95$5,528
Aug 1997077717.862.55$1,985
Jul 199701,08317.582.25$2,433
Jun 19974098817.242.26$2,920
May 1997088018.972.31$2,031
Apr 1997069017.882.08$1,437
Mar 1997078718.951.94$1,526
Feb 1997056720.492.21$1,251
Jan 1997051523.483.54$1,823
Dec 1996067723.32$0
Nov 1996066821.97$0
Oct 1996055623.31$0
Sep 1996053122.22$0
Aug 1996017320.26$0
Jul 1996040919.55$0
Jun 1996055118.73$0
May 1996090819.43$0
Apr 199601,07221.51$0
Mar 1996801,76119.38$1,550
Feb 1996535016.98$85
Jan 199602217.07$0
Dec 199502517.19$0
Nov 199507516.00$0
Oct 1995086215.43$0
Sep 1995084316.18$0
Aug 199501,02315.92$0
Jul 199501,17015.24$0
Jun 199501,22216.41$0
May 199501,32017.56$0
Apr 199501,42717.73$0
Mar 199501,75416.44$0
Feb 199501,84716.58$0
Jan 199502,14615.92$0
Dec 199401,93015.03$0
Nov 199402,40015.90$0
Oct 199402,82415.58$0
Sep 199402,97415.29$0
Aug 199402,87016.13$0
Jul 199402,81517.56$0
Jun 199402,39317.09$0
May 199402,59515.88$0
Apr 199403,15714.14$0
Mar 199403,49612.46$0
Feb 199403,32912.50$0
Jan 199403,95012.66$0
Dec 199304,45312.33$0
Nov 199302,76014.49$0
Oct 199302,84615.85$0
Sep 199301,90715.03$0
Aug 199302,02715.66$0
Jul 199302,66215.46$0
Jun 199302,53616.79$0
May 199302,59817.68$0
Apr 199302,81918.05$0
Mar 199302,87018.14$0
Feb 199302,28817.90$0
Jan 199304,22916.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jul 2000 — as filed, then multipliedworked
Condensate           146 bbl  × $ 28.53 =     $4,165
Gas                    0 Mcf  × $  4.09 =         $0

────────────────────────────────────────────────────
Month total                                   $4,165

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 03/G/83127 is the state's own key, not one this site invented.