MAG.W.MI GU 1

Operated by EXXON MOBIL CORPORATION (P-5 257128) in the MAGNET WITHERS (HETEROSTEGINA) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 96620District 03Field 56688590GasSaveExport
Value, all time
$81 k
Jan 1993 – Aug 2000
Value, last 12 filed months
$6 k
at the published price for each month
Months reported
92
no gaps in the span
Streams
1
gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 8 leases and 8 wells, and the rule below applies to all of them.

Discovered
1981-09-16
as the register files it
Field class
Gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

The Commission's schedule remark for this field reads: EXEMPT FIELD EFF 7-1-96

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
GasProduction112,268 Mcf$80,843
Total$80,843

78,187 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 29.1479, -96.0223. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

29.14787, -96.02232 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
6,312 ft
1 wells filed one
Completion to plug
10.0 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,312 ft.

Completions filed
Apr 2012
1 of 1 wells
Plug dates filed
Apr 2022
1 of 1 wells

Last completion to plug: a median of 10.0 years across the 1 well that filed both dates, with the middle half between 10.0 years and 10.0 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-4810337066,312 ftApr 2012Apr 2022Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (92)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

92 months

Aug 2000029.644.54$0
Jul 2000028.534.09$0
Jun 2000029.304.40$0
May 2000027.263.68$0
Apr 2000024.513.12$0
Mar 2000028.422.86$0
Feb 2000027.622.73$0
Jan 2000025.272.48$0
Dec 1999024.282.42$0
Nov 199970223.192.43$1,709
Oct 19991,00820.982.80$2,826
Sep 199969321.752.62$1,815
Aug 199980119.262.88$2,303
Jul 199993117.892.37$2,209
Jun 199985015.942.36$2,008
May 199988615.792.32$2,056
Apr 199969815.102.21$1,541
Mar 199983812.471.84$1,541
Feb 19996649.981.82$1,207
Jan 199974810.381.90$1,421
Dec 19988459.201.77$1,498
Nov 199882210.892.19$1,797
Oct 199894012.421.97$1,851
Sep 199880412.592.08$1,674
Aug 199884511.301.91$1,612
Jul 19981,00811.742.24$2,255
Jun 19981,23111.242.24$2,754
May 19981,27712.622.21$2,818
Apr 199889413.042.51$2,240
Mar 19981,09612.802.31$2,531
Feb 19981,00113.952.30$2,301
Jan 19981,15214.702.15$2,482
Dec 19971,39116.322.41$3,354
Nov 19971,09518.193.09$3,382
Oct 19971,06819.253.15$3,364
Sep 19971,11717.742.95$3,301
Aug 19971,17117.862.55$2,992
Jul 19971,18317.582.25$2,658
Jun 19971,08417.242.26$2,447
May 19971,00918.972.31$2,329
Apr 199792317.882.08$1,922
Mar 19971,01918.951.94$1,976
Feb 19971,06920.492.21$2,358
Jan 19971,21823.483.54$4,311
Dec 19961,18623.32$0
Nov 19961,23321.97$0
Oct 19961,30723.31$0
Sep 19961,23222.22$0
Aug 19961,27920.26$0
Jul 19961,30819.55$0
Jun 19961,28118.73$0
May 19961,34019.43$0
Apr 19961,54721.51$0
Mar 19961,59619.38$0
Feb 19961,62316.98$0
Jan 19961,81917.07$0
Dec 19951,80317.19$0
Nov 19951,72716.00$0
Oct 19951,88915.43$0
Sep 19951,74416.18$0
Aug 19951,67815.92$0
Jul 19951,64615.24$0
Jun 19951,67316.41$0
May 19951,69117.56$0
Apr 19951,60317.73$0
Mar 19951,62716.44$0
Feb 19951,41816.58$0
Jan 19951,62415.92$0
Dec 19941,65115.03$0
Nov 19941,54115.90$0
Oct 19941,56115.58$0
Sep 19941,61015.29$0
Aug 19941,65116.13$0
Jul 19941,73017.56$0
Jun 19941,36117.09$0
May 19941,82515.88$0
Apr 19941,80814.14$0
Mar 19941,89012.46$0
Feb 19942,04012.50$0
Jan 19941,52112.66$0
Dec 19931,95212.33$0
Nov 19932,00014.49$0
Oct 19931,97815.85$0
Sep 19932,02515.03$0
Aug 19932,16515.66$0
Jul 19932,55515.46$0
Jun 19931,41116.79$0
May 19932,04417.68$0
Apr 19932,02818.05$0
Mar 199373418.14$0
Feb 199319117.90$0
Jan 19932,04116.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Nov 1999 — as filed, then multipliedworked
Gas                  702 Mcf  × $  2.43 =     $1,709

────────────────────────────────────────────────────
Month total                                   $1,709

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 03/G/96620 is the state's own key, not one this site invented.