EVANS-CANNON UNIT

Operated by CLIFFWOOD PRODUCTION CO. (P-5 160606) in the DAY (SUB-CLARKVILLE A) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 16059District 03Field 23562450OilCasinghead gasSaveExport
Value, all time
$306 k
Jan 1993 – Jan 2001
Value, last 12 filed months
$0
at the published price for each month
Months reported
97
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 3 leases and 3 wells, and the rule below applies to all of them.

Discovered
1980-05-03
as the register files it
Field class
Oil and gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

The Commission's schedule remark for this field reads: CONSOLIDATING TO DAY FIELD PER DOCKET #03-0259895 EFF 1/15/09

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition18,796 bbl$305,064
Casinghead gasProduction6,720 Mcf$991
Total$306,056

6,308 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.9619, -95.9515. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.96189, -95.95154 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
10,167 ft
1 wells filed one
Completion to plug
18.8 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 10,167 ft.

Completions filed
Jan 1982
1 of 1 wells
Plug dates filed
Nov 2000
1 of 1 wells

Last completion to plug: a median of 18.8 years across the 1 well that filed both dates, with the middle half between 18.8 years and 18.8 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-31330332110,167 ftJan 1982Nov 2000Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (97)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

97 months

Jan 20010027.478.40$0
Dec 20000026.889.12$0
Nov 20000032.215.66$0
Oct 20000031.235.15$0
Sep 20000031.875.19$0
Aug 20000029.644.54$0
Jul 20000028.534.09$0
Jun 20000029.304.40$0
May 20000027.263.68$0
Apr 20000024.513.12$0
Mar 20000028.422.86$0
Feb 20000027.622.73$0
Jan 20000025.272.48$0
Dec 19990024.282.42$0
Nov 19990023.192.43$0
Oct 19990020.982.80$0
Sep 19990021.752.62$0
Aug 19990019.262.88$0
Jul 19990017.892.37$0
Jun 19990015.942.36$0
May 19990015.792.32$0
Apr 19990015.102.21$0
Mar 19990012.471.84$0
Feb 1999009.981.82$0
Jan 19990010.381.90$0
Dec 1998009.201.77$0
Nov 19980010.892.19$0
Oct 19980012.421.97$0
Sep 19980012.592.08$0
Aug 19980011.301.91$0
Jul 19980011.742.24$0
Jun 19980011.242.24$0
May 1998185012.622.21$2,335
Apr 199834113.042.51$142
Mar 199802112.802.31$49
Feb 19980913.952.30$21
Jan 199801114.702.15$24
Dec 19972116.322.41$35
Nov 19970418.193.09$12
Oct 19971019.253.15$19
Sep 19970417.742.95$12
Aug 19970217.862.55$5
Jul 19970117.582.25$2
Jun 199702617.242.26$59
May 1997952018.972.31$1,848
Apr 199708117.882.08$169
Mar 199786418.951.94$276
Feb 19971296420.492.21$2,784
Jan 199706323.483.54$223
Dec 19961248723.32$2,892
Nov 199609521.97$0
Oct 199609423.31$0
Sep 19961568422.22$3,466
Aug 199614010420.26$2,836
Jul 199617610419.55$3,441
Jun 199616110118.73$3,016
May 19963398719.43$6,587
Apr 19961808721.51$3,872
Mar 199634010119.38$6,589
Feb 199617617516.98$2,988
Jan 19963479717.07$5,923
Dec 199534318117.19$5,896
Nov 199551320216.00$8,208
Oct 199534013415.43$5,246
Sep 199535417516.18$5,728
Aug 199553415515.92$8,501
Jul 199534816815.24$5,304
Jun 199517916816.41$2,937
May 199552614117.56$9,237
Apr 19950717.73$0
Mar 199533514116.44$5,507
Feb 199517518116.58$2,902
Jan 199552420215.92$8,342
Dec 199470020815.03$10,521
Nov 199406015.90$0
Oct 199453520815.58$8,335
Sep 199450019515.29$7,645
Aug 199450920216.13$8,210
Jul 199451319517.56$9,008
Jun 199449919517.09$8,528
May 199452520215.88$8,337
Apr 199447111614.14$6,660
Mar 199452812412.46$6,579
Feb 199450810012.50$6,350
Jan 19945108412.66$6,457
Dec 19933578412.33$4,402
Nov 199367211214.49$9,737
Oct 199335011615.85$5,548
Sep 199368611215.03$10,311
Aug 199350210415.66$7,861
Jul 199335312015.46$5,457
Jun 199370511616.79$11,837
May 199352411617.68$9,264
Apr 199334211618.05$6,173
Mar 199370211618.14$12,734
Feb 199353611217.90$9,594
Jan 199353612416.93$9,074

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 1998 — as filed, then multipliedworked
Oil                  185 bbl  × $ 12.62 =     $2,335
Casinghead gas         0 Mcf  × $  2.21 =         $0

────────────────────────────────────────────────────
Month total                                   $2,335

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 03/O/16059 is the state's own key, not one this site invented.