DELTA DAWN

Operated by U. S. OPERATING, INC. (P-5 875431) in the GIDDINGS (AUSTIN CHALK-3) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 16471District 03Field 34733500OilCasinghead gasSaveExport
Value, all time
$883 k
Jan 1993 – Dec 2006
Value, last 12 filed months
$3 k
at the published price for each month
Months reported
168
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 5,900 leases and 6,985 wells, and the rule below applies to all of them.

Discovered
1960-10-29
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 80 acres. The field rule took effect on 2025-09-30.

The Commission's schedule remark for this field reads: DKT OG-25-00028011: UFT FIELD, ALLOCATION FORMULA SUSPENDED

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition18,556 bbl$418,729
Casinghead gasProduction145,125 Mcf$464,341
Total$883,070

32,176 Mcf of this lease's gas, across 36 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.3019, -96.8016. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.30194, -96.80155 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
8,200 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 8,200 ft.

Completions filed
Jun 2006
1 of 1 wells

1 well

42-2873129218,200 ftJun 2006Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (168)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

168 months

Dec 20060056.656.92$0
Nov 20060054.207.62$0
Oct 200660054.906.01$3,294
Sep 20060060.085.04$0
Aug 20060068.717.34$0
Jul 20060069.376.34$0
Jun 20061166.286.38$73
May 20060066.016.42$0
Apr 20060164.397.36$7
Mar 20060056.707.08$0
Feb 20060057.597.75$0
Jan 20060060.598.93$0
Dec 20050054.9413.42$0
Nov 20050054.6910.59$0
Oct 20050058.3413.80$0
Sep 20050161.4512.08$12
Aug 20050061.519.80$0
Jul 20050055.697.84$0
Jun 20050052.337.38$0
May 20050045.226.65$0
Apr 20050049.207.36$0
Mar 20050450.377.15$29
Feb 20050645.226.31$38
Jan 200501143.166.32$70
Dec 20040839.866.75$54
Nov 200461045.286.33$335
Oct 20040949.706.52$59
Sep 200454243.245.28$438
Aug 20041748442.375.55$7,839
Jul 200445838.286.08$506
Jun 200432436.106.43$263
May 200492737.486.49$513
Apr 200455734.475.86$506
Mar 2004157934.365.53$952
Feb 200417232.455.51$429
Jan 200437432.036.30$562
Dec 200377030.266.30$653
Nov 200386028.804.60$506
Oct 200301528.174.76$71
Sep 200302626.314.75$123
Aug 200385329.765.13$510
Jul 200324729.415.17$302
Jun 200337128.565.98$510
May 200333826.595.97$307
Apr 200337526.675.41$486
Mar 200339531.146.10$673
Feb 200332233.487.93$275
Jan 200326530.315.58$423
Dec 200226326.914.85$360
Nov 200236124.664.14$326
Oct 200238626.464.23$443
Sep 200228527.443.64$364
Aug 200269625.963.16$460
Jul 200249324.583.06$383
Jun 20026323.733.34$152
May 200248824.663.58$414
Apr 2002610723.653.51$518
Mar 2002239922.003.10$1,282
Feb 20027452,02718.222.38$18,389
Jan 20021,4647,57717.172.38$43,137
Dec 20011,4876,36016.932.36$40,212
Nov 20011,3058,36418.072.41$43,701
Oct 20011,50610,12719.782.53$55,399
Sep 20011,8669,62324.262.25$66,934
Aug 20011,8899,95224.873.05$77,364
Jul 20012,0647,76523.933.20$74,217
Jun 20011942,93524.563.82$15,989
May 20011885,54625.524.31$28,686
Apr 20011882,35824.685.34$17,221
Mar 20011974,71524.545.38$30,184
Feb 20011895,19327.755.77$35,193
Jan 20013855,73327.478.40$58,726
Dec 20001786,57526.889.12$64,765
Nov 20001933,79932.215.66$27,711
Oct 20003684,79931.235.15$36,186
Sep 20001844,81631.875.19$30,842
Aug 20001,7962,39929.644.54$64,127
Jul 20000028.534.09$0
Jun 20000029.304.40$0
May 20000027.263.68$0
Apr 20000024.513.12$0
Mar 20000028.422.86$0
Feb 20000027.622.73$0
Jan 20000025.272.48$0
Dec 19990024.282.42$0
Nov 19990023.192.43$0
Oct 19990020.982.80$0
Sep 19990021.752.62$0
Aug 19990019.262.88$0
Jul 19990017.892.37$0
Jun 19990015.942.36$0
May 19990015.792.32$0
Apr 19990015.102.21$0
Mar 19990012.471.84$0
Feb 1999009.981.82$0
Jan 19990010.381.90$0
Dec 1998009.201.77$0
Nov 19980010.892.19$0
Oct 19980012.421.97$0
Sep 19980012.592.08$0
Aug 19980011.301.91$0
Jul 19980011.742.24$0
Jun 19980011.242.24$0
May 19980012.622.21$0
Apr 19980013.042.51$0
Mar 19980012.802.31$0
Feb 19980013.952.30$0
Jan 19980014.702.15$0
Dec 19970016.322.41$0
Nov 19970018.193.09$0
Oct 19970019.253.15$0
Sep 19970017.742.95$0
Aug 19970017.862.55$0
Jul 19970017.582.25$0
Jun 19970017.242.26$0
May 19970018.972.31$0
Apr 19970017.882.08$0
Mar 19970018.951.94$0
Feb 19970020.492.21$0
Jan 19970023.483.54$0
Dec 19960023.32$0
Nov 19960021.97$0
Oct 19960023.31$0
Sep 19960022.22$0
Aug 19960020.26$0
Jul 19960019.55$0
Jun 19960018.73$0
May 19960019.43$0
Apr 19960021.51$0
Mar 19960019.38$0
Feb 19960016.98$0
Jan 19960017.07$0
Dec 199514919717.19$2,561
Nov 1995055016.00$0
Oct 1995067415.43$0
Sep 1995070716.18$0
Aug 1995071515.92$0
Jul 1995091615.24$0
Jun 1995047816.41$0
May 1995087717.56$0
Apr 1995087717.73$0
Mar 199519199416.44$3,140
Feb 1995070516.58$0
Jan 1995074115.92$0
Dec 1994074115.03$0
Nov 199417094015.90$2,703
Oct 1994091815.58$0
Sep 1994093715.29$0
Aug 1994082516.13$0
Jul 199422283217.56$3,898
Jun 1994083517.09$0
May 1994099215.88$0
Apr 1994096114.14$0
Mar 19941901,08612.46$2,367
Feb 1994091712.50$0
Jan 1994099012.66$0
Dec 199321279412.33$2,614
Nov 199301,07714.49$0
Oct 199301,14915.85$0
Sep 199301,08815.03$0
Aug 19933171,04615.66$4,964
Jul 1993095315.46$0
Jun 1993095316.79$0
May 199301,11917.68$0
Apr 199301,07718.05$0
Mar 199301,16118.14$0
Feb 19933531,07717.90$6,319
Jan 199301,27716.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Oct 2006 — as filed, then multipliedworked
Oil                   60 bbl  × $ 54.90 =     $3,294
Casinghead gas         0 Mcf  × $  6.01 =         $0

────────────────────────────────────────────────────
Month total                                   $3,294

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 03/O/16471 is the state's own key, not one this site invented.