CHOATE FEE BLOCK 1, LOT 2

Operated by ARROWHEAD OPERATING INC. (P-5 33521) in the BATSON NEW field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 18428District 03Field 06115001Hydrogen sulphide fieldOilCasinghead gasSaveExport
Value, all time
$685 k
Jan 1993 – May 2026
Value, last 12 filed months
$34 k
at the published price for each month
Months reported
401
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 78 leases and 370 wells, and the rule below applies to all of them.

Discovered
1935-12-31
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
0 ft
minimum

A drilling unit in this field needs at least 0 acres.

The register flags this field for hydrogen sulphide. That is a poisonous gas that occurs naturally in some formations. The flag is a property of the field as the Commission records it. It is not a measurement taken at this lease, and it is not a statement that gas is escaping anywhere.

The Commission's schedule remark for this field reads: PIERCEMENT TYPE SALT DOME.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition17,973 bbl$682,421
Casinghead gasProduction793 Mcf$2,132
Total$684,553

298 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.2778, -94.6170. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.27775, -94.61695 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
3,882 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 3,882 ft.

Completions filed
Jul 1987
1 of 1 wells

1 well

42-1993222413,882 ftJul 1987

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (401)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

401 months

May 2026230106.413.05$2,447
Apr 202622098.932.87$2,176
Mar 202623089.753.15$2,064
Feb 202614063.503.75$889
Jan 202654059.138.00$3,193
Dec 202535056.664.41$1,983
Nov 202535058.593.93$2,051
Oct 202537059.383.30$2,197
Sep 202555062.743.08$3,451
Aug 202555063.933.01$3,516
Jul 202536066.743.32$2,403
Jun 2025120066.483.13$7,978
May 2025125060.553.23$7,569
Apr 202580062.363.54$4,989
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 2025147074.324.28$10,925
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 2024144084.451.66$12,161
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 2023147085.443.09$12,560
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 2023143072.852.39$10,418
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 2022149087.185.86$12,990
Sep 20220184.888.16$8
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202201115.097.98$8
May 202201109.378.43$8
Apr 20221541104.226.84$16,057
Mar 202201108.885.08$5
Feb 20220191.054.86$5
Jan 20220181.844.54$5
Dec 20210171.323.90$4
Nov 2021152177.435.24$11,775
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210169.493.38$3
May 2021142163.483.02$9,017
Apr 20210160.362.76$3
Mar 20210161.302.72$3
Feb 20210057.805.55$0
Jan 20210150.412.81$3
Dec 20200144.642.68$3
Nov 2020144138.772.71$5,586
Oct 20200136.972.48$2
Sep 20200137.091.99$2
Aug 20200239.982.39$5
Jul 20200138.371.83$2
Jun 20200134.901.69$2
May 20200116.921.81$2
Apr 20200114.751.80$2
Mar 20200130.341.86$2
Feb 2020156349.881.98$7,787
Jan 20200157.252.09$2
Dec 20190159.012.30$2
Nov 20190155.302.75$3
Oct 20190153.472.42$2
Sep 20190155.052.66$3
Aug 20190153.112.30$2
Jul 20190156.272.46$2
Jun 20190152.782.49$2
May 20190158.482.74$3
Apr 20190162.632.75$3
Mar 2019154256.803.06$8,753
Feb 20190150.852.79$3
Jan 20190146.033.23$3
Dec 20180146.594.19$4
Nov 20180152.934.24$4
Oct 20180161.443.40$3
Sep 20180159.543.11$3
Aug 2018146159.403.07$8,675
Jul 20180165.142.93$3
Jun 20180160.183.08$3
May 20180165.382.90$3
Apr 20180163.842.90$3
Mar 20180161.222.79$3
Feb 20180161.782.77$3
Jan 20180062.874.01$0
Dec 20170057.272.92$0
Nov 20170155.423.12$3
Oct 201752049.292.98$2,563
Sep 20170147.523.09$3
Aug 20170145.373.00$3
Jul 20170143.873.09$3
Jun 20170142.493.09$3
May 2017103145.373.26$4,676
Apr 20170247.933.21$6
Mar 20170246.772.98$6
Feb 20170250.452.95$6
Jan 20170249.413.42$7
Dec 201680148.763.72$3,905
Nov 20160142.492.64$3
Oct 20160146.193.09$3
Sep 201665141.553.10$2,704
Aug 20160141.442.92$3
Jul 20160141.622.92$3
Jun 2016140145.352.69$6,352
May 20160142.521.99$2
Apr 20160136.561.99$2
Mar 20160133.011.79$2
Feb 20160126.472.06$2
Jan 20160127.352.36$2
Dec 201573132.362.00$2,364
Nov 20150138.792.17$2
Oct 20150143.552.43$2
Sep 20150142.992.76$3
Aug 20150140.162.87$3
Jul 20150148.152.95$3
Jun 2015117156.152.88$6,572
May 20150155.212.96$3
Apr 20150149.822.71$3
Mar 20150142.892.93$3
Feb 20150144.662.98$3
Jan 20150143.433.10$3
Dec 20140154.693.59$4
Nov 2014112170.464.25$7,896
Oct 20140178.303.90$4
Sep 20140186.164.05$4
Aug 20140189.394.04$4
Jul 2014149196.564.18$14,392
Jun 20140198.164.74$5
May 20140294.734.73$9
Apr 20140295.944.81$10
Mar 20140295.895.06$10
Feb 2014148297.406.19$14,428
Jan 20140190.404.86$5
Dec 20130191.824.35$4
Nov 20130188.853.74$4
Oct 20130197.423.78$4
Sep 201301104.113.72$4
Aug 20131541104.253.52$16,058
Jul 201301102.523.72$4
Jun 20130194.403.93$4
May 20130194.834.15$4
Apr 20130193.964.28$4
Mar 20130193.623.91$4
Feb 2013145191.233.42$13,232
Jan 20130191.603.42$3
Dec 20120186.773.42$3
Nov 20120186.953.62$4
Oct 20120189.383.40$3
Sep 20120194.672.92$3
Aug 20120192.662.91$3
Jul 2012134185.133.02$11,410
Jun 20120179.822.52$3
May 20120191.612.49$2
Apr 201201101.652.00$2
Mar 201201105.052.22$2
Feb 201201101.102.57$3
Jan 20120198.092.73$3
Dec 20110196.873.24$3
Nov 20110195.723.31$3
Oct 2011151184.983.65$12,836
Sep 20110283.623.99$8
Aug 20110283.404.15$8
Jul 20110294.144.52$9
Jun 20110292.904.64$9
May 2011154198.134.40$15,116
Apr 201101105.964.33$4
Mar 20110196.364.06$4
Feb 20110185.644.18$4
Jan 20110186.504.59$5
Dec 2010149185.734.35$12,778
Nov 20100180.843.80$4
Oct 20100178.103.51$4
Sep 20100172.633.98$4
Aug 20100173.684.42$4
Jul 20100172.554.74$5
Jun 2010156170.364.91$10,981
May 20100171.124.24$4
Apr 20100181.694.12$4
Mar 20100278.394.39$9
Feb 20100273.585.44$11
Jan 201087274.365.96$6,481
Dec 2009160171.445.48$11,436
Nov 20090174.593.75$4
Oct 20090172.544.11$4
Sep 20090165.543.06$3
Aug 20090167.423.22$3
Jul 20090161.133.46$3
Jun 200945166.163.90$2,981
May 20090154.743.93$4
Apr 2009165146.773.59$7,721
Mar 20090142.144.06$4
Feb 20090132.814.63$5
Jan 20090135.865.37$5
Dec 2008157137.105.98$5,831
Nov 20080255.496.86$14
Oct 20080175.246.92$7
Sep 200801101.767.88$8
Aug 200802114.228.48$17
Jul 200802131.0811.39$23
Jun 200802131.3313.03$26
May 20081612123.1711.57$19,854
Apr 200802110.3110.45$21
Mar 200802101.909.66$19
Feb 20080292.538.77$18
Jan 2008145290.388.21$13,122
Dec 20070188.337.30$7
Nov 20070191.677.29$7
Oct 20070182.856.92$7
Sep 2007101175.846.24$7,666
Aug 20070269.066.39$13
Jul 20070270.906.39$13
Jun 20070162.007.55$8
May 200782358.747.85$4,840
Apr 200742159.617.81$2,511
Mar 20070156.927.30$7
Feb 2007149155.108.22$8,218
Jan 20070250.306.73$13
Dec 20060256.656.92$14
Nov 20060254.207.62$15
Oct 20060254.906.01$12
Sep 2006148160.085.04$8,897
Aug 20060268.717.34$15
Jul 20060269.376.34$13
Jun 20060266.286.38$13
May 20060266.016.42$13
Apr 2006152264.397.36$9,802
Mar 20060256.707.08$14
Feb 20060257.597.75$16
Jan 20060260.598.93$18
Dec 20050254.9413.42$27
Nov 2005150254.6910.59$8,225
Oct 20050158.3413.80$14
Sep 20050161.4512.08$12
Aug 20050161.519.80$10
Jul 2005147155.697.84$8,194
Jun 20050152.337.38$7
May 20050145.226.65$7
Apr 20050049.207.36$0
Mar 20050150.377.15$7
Feb 20050245.226.31$13
Jan 20050243.166.32$13
Dec 2004302639.866.75$12,078
Nov 20040245.286.33$13
Oct 20040249.706.52$13
Sep 20040243.245.28$11
Aug 20040242.375.55$11
Jul 2004161238.286.08$6,175
Jun 20040236.106.43$13
May 20040237.486.49$13
Apr 20040234.475.86$12
Mar 2004163234.365.53$5,612
Feb 20040232.455.51$11
Jan 20040232.036.30$13
Dec 20030230.266.30$13
Nov 2003166228.804.60$4,790
Oct 20030228.174.76$10
Sep 20030226.314.75$10
Aug 20030229.765.13$10
Jul 2003157229.415.17$4,628
Jun 20030228.565.98$12
May 20030226.595.97$12
Apr 20030226.675.41$11
Mar 2003162231.146.10$5,057
Feb 20030233.487.93$16
Jan 20030230.315.58$11
Dec 20020226.914.85$10
Nov 2002159224.664.14$3,929
Oct 20020226.464.23$8
Sep 20020227.443.64$7
Aug 2002173225.963.16$4,497
Jul 20020224.583.06$6
Jun 20020223.733.34$7
May 20020224.663.58$7
Apr 20020223.653.51$7
Mar 2002139222.003.10$3,064
Feb 2002164218.222.38$2,993
Jan 20020217.172.38$5
Dec 20010216.932.36$5
Nov 20010218.072.41$5
Oct 20010219.782.53$5
Sep 2001137224.262.25$3,328
Aug 20010224.873.05$6
Jul 20010223.933.20$6
Jun 2001144224.563.82$3,544
May 20010225.524.31$9
Apr 200163224.685.34$1,566
Mar 20010224.545.38$11
Feb 20010227.755.77$12
Jan 2001137227.478.40$3,780
Dec 20000226.889.12$18
Nov 20000332.215.66$17
Oct 2000138331.235.15$4,325
Sep 20000331.875.19$16
Aug 20000329.644.54$14
Jul 2000149328.534.09$4,263
Jun 20000329.304.40$13
May 20000327.263.68$11
Apr 2000170224.513.12$4,173
Mar 20000228.422.86$6
Feb 20000227.622.73$5
Jan 2000154325.272.48$3,899
Dec 1999145324.282.42$3,528
Nov 19990323.192.43$7
Oct 19990320.982.80$8
Sep 19990321.752.62$8
Aug 1999172319.262.88$3,321
Jul 1999189317.892.37$3,388
Jun 19990315.942.36$7
May 19990315.792.32$7
Apr 19990315.102.21$7
Mar 1999373312.471.84$4,657
Feb 1999039.981.82$5
Jan 19990310.381.90$6
Dec 1998039.201.77$5
Nov 1998167310.892.19$1,825
Oct 19980412.421.97$8
Sep 1998168412.592.08$2,123
Aug 19980411.301.91$8
Jul 19980411.742.24$9
Jun 19980311.242.24$7
May 1998180312.622.21$2,278
Apr 19980313.042.51$8
Mar 19980312.802.31$7
Feb 1998156313.952.30$2,183
Jan 19980314.702.15$6
Dec 19970316.322.41$7
Nov 1997163318.193.09$2,974
Oct 19970319.253.15$9
Sep 1997148317.742.95$2,634
Aug 19970317.862.55$8
Jul 1997161317.582.25$2,837
Jun 19970317.242.26$7
May 1997170318.972.31$3,232
Apr 19970317.882.08$6
Mar 19970318.951.94$6
Feb 1997159320.492.21$3,265
Jan 199767423.483.54$1,587
Dec 19960323.32$0
Nov 1996137221.97$3,010
Oct 1996166323.31$3,869
Sep 19960322.22$0
Aug 1996167320.26$3,383
Jul 19960319.55$0
Jun 1996170318.73$3,184
May 19960419.43$0
Apr 19960421.51$0
Mar 1996163419.38$3,159
Feb 1996163416.98$2,768
Jan 19960517.07$0
Dec 1995180517.19$3,094
Nov 19950516.00$0
Oct 1995174515.43$2,685
Sep 19950516.18$0
Aug 1995171515.92$2,722
Jul 1995178515.24$2,713
Jun 19950516.41$0
May 1995177617.56$3,108
Apr 1995174617.73$3,085
Mar 19950616.44$0
Feb 1995161616.58$2,669
Jan 1995154615.92$2,452
Dec 1994115515.03$1,728
Nov 1994167515.90$2,655
Oct 19940615.58$0
Sep 1994167415.29$2,553
Aug 1994180416.13$2,903
Jul 1994333417.56$5,847
Jun 1994337817.09$5,759
May 19940815.88$0
Apr 19940814.14$0
Mar 1994338712.46$4,211
Feb 19940812.50$0
Jan 1994318912.66$4,026
Dec 19930912.33$0
Nov 1993331914.49$4,796
Oct 199301215.85$0
Sep 1993323815.03$4,855
Aug 199301015.66$0
Jul 19933341015.46$5,164
Jun 199301116.79$0
May 19933341117.68$5,905
Apr 19933251118.05$5,866
Mar 199301118.14$0
Feb 1993315717.90$5,639
Jan 19930716.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Oil                   23 bbl  × $106.41 =     $2,447
Casinghead gas         0 Mcf  × $  3.05 =         $0

────────────────────────────────────────────────────
Month total                                   $2,447

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 03/O/18428 is the state's own key, not one this site invented.