LAZARONE, M.

Operated by ANADARKO E&P COMPANY LP (P-5 20542) in the CALDWELL (AUSTIN CHALK) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 20548District 03Field 14710500OilCasinghead gasSaveExport
Value, all time
$369 k
Jan 1993 – Sep 2003
Value, last 12 filed months
$0
at the published price for each month
Months reported
129
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 256 leases and 330 wells, and the rule below applies to all of them.

Discovered
1978-06-29
as the register files it
Field class
Oil and gas
the register's own label
Between wells
1,200 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 80 acres. The field rule took effect on 1991-11-25.

The Commission's schedule remark for this field reads: PER DOCKET 3-97101 EFF 11-25-91, PERM RULES. 80 ACRE OPT/3250 DIAG

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition19,700 bbl$354,078
Casinghead gasProduction17,304 Mcf$14,719
Total$368,798

12,080 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.6716, -96.5438. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.67161, -96.54376 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
7,710 ft
1 wells filed one
Completion to plug
13.8 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,710 ft.

Completions filed
Sep 1989
1 of 1 wells
Plug dates filed
Jun 2003
1 of 1 wells

Last completion to plug: a median of 13.8 years across the 1 well that filed both dates, with the middle half between 13.8 years and 13.8 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-0413120117,710 ftSep 1989Jun 2003Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (129)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

129 months

Sep 20030026.314.75$0
Aug 20030029.765.13$0
Jul 20030029.415.17$0
Jun 20030028.565.98$0
May 20030026.595.97$0
Apr 20030026.675.41$0
Mar 20030031.146.10$0
Feb 20030033.487.93$0
Jan 20030030.315.58$0
Dec 20020026.914.85$0
Nov 20020024.664.14$0
Oct 20020026.464.23$0
Sep 20020027.443.64$0
Aug 20020025.963.16$0
Jul 20020024.583.06$0
Jun 20020023.733.34$0
May 200276024.663.58$1,874
Apr 20020023.653.51$0
Mar 20020022.003.10$0
Feb 20020018.222.38$0
Jan 20020017.172.38$0
Dec 20010016.932.36$0
Nov 2001120118.072.41$2,171
Oct 20010019.782.53$0
Sep 20011823024.262.25$4,483
Aug 200101624.873.05$49
Jul 2001178123.933.20$4,263
Jun 2001191024.563.82$4,691
May 200101625.524.31$69
Apr 20011793924.685.34$4,626
Mar 20011936724.545.38$5,096
Feb 20011762827.755.77$5,045
Jan 200102627.478.40$218
Dec 20001794226.889.12$5,195
Nov 20001899032.215.66$6,597
Oct 20001838431.235.15$6,147
Sep 200007731.875.19$399
Aug 20001848229.644.54$5,826
Jul 200018014328.534.09$5,720
Jun 20001765229.304.40$5,385
May 200008627.263.68$316
Apr 20001757724.513.12$4,529
Mar 20001798628.422.86$5,333
Feb 20001788827.622.73$5,156
Jan 20001788125.272.48$4,699
Dec 199918112024.282.42$4,686
Nov 19991775923.192.43$4,248
Oct 1999011120.982.80$311
Sep 199918110321.752.62$4,206
Aug 19991767319.262.88$3,600
Jul 19991808017.892.37$3,410
Jun 19991809015.942.36$3,082
May 1999010015.792.32$232
Apr 199918510515.102.21$3,025
Mar 199918111112.471.84$2,461
Feb 1999176869.981.82$1,913
Jan 199917911610.381.90$2,078
Dec 19981861019.201.77$1,890
Nov 19981799910.892.19$2,166
Oct 199808712.421.97$171
Sep 199817810512.592.08$2,460
Aug 19981819511.301.91$2,227
Jul 19981789111.742.24$2,293
Jun 199818013611.242.24$2,327
May 199818014312.622.21$2,587
Apr 199836814113.042.51$5,152
Mar 199818111512.802.31$2,582
Feb 199809513.952.30$218
Jan 199835814614.702.15$5,577
Dec 199708016.322.41$193
Nov 199717411818.193.09$3,529
Oct 199717014819.253.15$3,739
Sep 199717215217.742.95$3,500
Aug 199717216717.862.55$3,499
Jul 199736123817.582.25$6,881
Jun 199735919017.242.26$6,618
May 19971736318.972.31$3,427
Apr 199708717.882.08$181
Mar 19971797118.951.94$3,530
Feb 199717614020.492.21$3,915
Jan 199705023.483.54$177
Dec 199617816723.32$4,151
Nov 199617618521.97$3,867
Oct 199618522623.31$4,312
Sep 199617917922.22$3,977
Aug 199618325020.26$3,708
Jul 199617424919.55$3,402
Jun 199617426718.73$3,259
May 199617527219.43$3,400
Apr 199617025121.51$3,657
Mar 199618030019.38$3,488
Feb 199617824416.98$3,022
Jan 199617626717.07$3,004
Dec 199517325917.19$2,974
Nov 199534324816.00$5,488
Oct 19956929015.43$1,065
Sep 199534529016.18$5,582
Aug 199517929015.92$2,850
Jul 199516929915.24$2,576
Jun 199517130316.41$2,806
May 199517230617.56$3,020
Apr 199518031517.73$3,191
Mar 199534435116.44$5,655
Feb 199517327116.58$2,868
Jan 199518828615.92$2,993
Dec 199434527715.03$5,185
Nov 199417822315.90$2,830
Oct 199416619915.58$2,586
Sep 199417015215.29$2,599
Aug 199434024816.13$5,484
Jul 199418123317.56$3,178
Jun 199417322017.09$2,957
May 199435230615.88$5,590
Apr 199417647914.14$2,489
Mar 199417531612.46$2,181
Feb 199433820812.50$4,225
Jan 199454727812.66$6,925
Dec 1993022312.33$0
Nov 199318329214.49$2,652
Oct 199352132115.85$8,258
Sep 19931738315.03$2,600
Aug 199350724915.66$7,940
Jul 199331719815.46$4,901
Jun 199325416.79$34
May 1993016317.68$0
Apr 199333917218.05$6,119
Mar 199334535818.14$6,258
Feb 199336024717.90$6,444
Jan 199318121616.93$3,064

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2002 — as filed, then multipliedworked
Oil                   76 bbl  × $ 24.66 =     $1,874
Casinghead gas         0 Mcf  × $  3.58 =         $0

────────────────────────────────────────────────────
Month total                                   $1,874

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 03/O/20548 is the state's own key, not one this site invented.