Operated by BLUE RIDGE OPERATING LLC (P-5 100436) in the BLUE RIDGE field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 21225District 03Field 09880001Hydrogen sulphide fieldOilCasinghead gasSaveExport
Value, all time
$9.5 M
Jan 1993 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
401
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 92 leases and 668 wells, and the rule below applies to all of them.

Discovered
1919-12-31
as the register files it
Field class
Oil
the register's own label
Between wells
0 ft
minimum
From a lease line
0 ft
minimum

A drilling unit in this field needs at least 0 acres.

The register flags this field for hydrogen sulphide. That is a poisonous gas that occurs naturally in some formations. The flag is a property of the field as the Commission records it. It is not a measurement taken at this lease, and it is not a statement that gas is escaping anywhere.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition165,283 bbl$9,495,204
Casinghead gasProduction13 Mcf$2
Total$9,495,206

12 Mcf of this lease's gas, across 12 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (16)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 29.5831, -95.4882. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.3 miles.

29.58351, -95.48786 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
37.5%
6 of 16 wells
With a plug date
31.3%
5 of 16 wells
Median depth
3,190 ft
16 wells filed one
Completion to plug
5.0 years
median over 4 wells

What the state filed about each well

On the RRC proration schedule
637.5%
A plug date is filed
531.3%
BothOn the schedule and plugged. Neither fact cancels the other.
531.3%
NeitherNo plug date, and not on the schedule.
1062.5%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

Total depth in feet, 16 of 16 wells. Median 3,190 ft, with the middle half between 2,832 and 3,343 ft; the shallowest is 2,346 ft and the deepest 3,491 ft. The median is published rather than the mean, because a single mis-keyed depth moves a mean and cannot move a median.

When they were last completed

Last completion by decade, 15 of 16 wells, Aug 1975 – Jun 2017. This is the LAST completion filed on each wellbore, not the first — a well recompleted in 2019 counts once, in the 2010s.

Completions filed
Aug 1975 – Jun 2017
15 of 16 wells; 1 filed none
Plug dates filed
Sep 2011 – Feb 2019
5 of 16 wells; 11 filed none

Last completion to plug: a median of 5.0 years across the 4 wells that filed both dates, with the middle half between 3.9 years and 13.1 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

16 wells

42-15700226E 32,776 ftSep 2014Yes
42-1573322217083,266 ftJun 2017
42-1573321817073,491 ftJun 2017
42-1573321617063,150 ftMay 2017
42-1573321717043,175 ftMay 2017
42-157329908163,472 ftJan 2016
42-157330998103,310 ftMar 2015
42-157331667993,002 ftMar 2015
42-157330938453,443 ftDec 2014Yes
42-157330918083,205 ftDec 2014
42-157330368173,486 ftMar 2014Feb 2019Yes
42-157328422913,250 ftOct 2012
42-157326182062,771 ftJan 2011Feb 2016Yes
42-157326192072,850 ftDec 2010
42-157326132042,779 ftOct 2010Sep 2011Yes
42-15700227E 42,346 ftAug 1975Aug 2012Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (401)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

401 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 202335074.852.64$2,620
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 202374072.852.39$5,391
Feb 20230075.112.47$0
Jan 202368076.533.39$5,204
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 202292087.185.86$8,021
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 20221470101.587.54$14,932
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 20221270104.226.84$13,236
Mar 202200108.885.08$0
Feb 2022158091.054.86$14,386
Jan 2022141081.844.54$11,539
Dec 2021165071.323.90$11,768
Nov 2021318077.435.24$24,623
Oct 2021485079.795.71$38,698
Sep 2021639069.865.35$44,641
Aug 20212,293066.024.22$151,384
Jul 2021642070.783.98$45,441
Jun 2021485069.493.38$33,703
May 2021479063.483.02$30,407
Apr 2021654060.362.76$39,475
Mar 20211,144061.302.72$70,127
Feb 20211,312057.805.55$75,834
Jan 20212,241050.412.81$112,969
Dec 20202,610044.642.68$116,510
Nov 20201,308038.772.71$50,711
Oct 2020179036.972.48$6,618
Sep 2020155037.091.99$5,749
Aug 2020350039.982.39$13,993
Jul 2020162038.371.83$6,216
Jun 2020489034.901.69$17,066
May 2020320016.921.81$5,414
Apr 2020475014.751.80$7,006
Mar 2020339030.341.86$10,285
Feb 2020497049.881.98$24,790
Jan 2020510057.252.09$29,198
Dec 2019660059.012.30$38,947
Nov 2019539055.302.75$29,807
Oct 2019518053.472.42$27,697
Sep 2019686055.052.66$37,764
Aug 2019712053.112.30$37,814
Jul 2019697056.272.46$39,220
Jun 2019678052.782.49$35,785
May 20191,242058.482.74$72,632
Apr 20192,130062.632.75$133,402
Mar 20192,270056.803.06$128,936
Feb 2019670050.852.79$34,070
Jan 20191,438046.033.23$66,191
Dec 2018876046.594.19$40,813
Nov 2018866052.934.24$45,837
Oct 2018698061.443.40$42,885
Sep 20181,218059.543.11$72,520
Aug 20181,899059.403.07$112,801
Jul 20181,963065.142.93$127,870
Jun 20182,231060.183.08$134,262
May 20183,964065.382.90$259,166
Apr 20182,801063.842.90$178,816
Mar 20181,018061.222.79$62,322
Feb 20181,516061.782.77$93,658
Jan 20181,375062.874.01$86,446
Dec 20172,297057.272.92$131,549
Nov 20171,807055.423.12$100,144
Oct 20171,574049.292.98$77,582
Sep 20172,543047.523.09$120,843
Aug 20173,439045.373.00$156,027
Jul 20172,236043.873.09$98,093
Jun 20175,820042.493.09$247,292
May 20171,757045.373.26$79,715
Apr 2017862047.933.21$41,316
Mar 20171,032046.772.98$48,267
Feb 20171,009050.452.95$50,904
Jan 20171,117049.413.42$55,191
Dec 2016928048.763.72$45,249
Nov 2016923042.492.64$39,218
Oct 20161,092046.193.09$50,439
Sep 20161,268041.553.10$52,685
Aug 20161,413041.442.92$58,555
Jul 20161,222041.622.92$50,860
Jun 20161,070045.352.69$48,525
May 20161,232042.521.99$52,385
Apr 20161,695036.561.99$61,969
Mar 20161,703033.011.79$56,216
Feb 20161,699026.472.06$44,973
Jan 20161,995027.352.36$54,563
Dec 20151,998032.362.00$64,655
Nov 20152,148038.792.17$83,321
Oct 20152,757043.552.43$120,067
Sep 20153,209042.992.76$137,955
Aug 20152,445040.162.87$98,191
Jul 20152,590048.152.95$124,709
Jun 20153,368056.152.88$189,113
May 20153,366055.212.96$185,837
Apr 20153,742049.822.71$186,426
Mar 20154,015042.892.93$172,203
Feb 20153,531044.662.98$157,694
Jan 20154,542043.433.10$197,259
Dec 20145,394054.693.59$294,998
Nov 20140070.464.25$0
Oct 2014164078.303.90$12,841
Sep 20140086.164.05$0
Aug 2014168089.394.04$15,018
Jul 2014325096.564.18$31,382
Jun 2014338098.164.74$33,178
May 2014339094.734.73$32,113
Apr 20141,185095.944.81$113,689
Mar 2014845095.895.06$81,027
Feb 2014675097.406.19$65,745
Jan 20141,010090.404.86$91,304
Dec 20131,173091.824.35$107,705
Nov 2013485088.853.74$43,092
Oct 2013478097.423.78$46,567
Sep 20134940104.113.72$51,430
Aug 20134750104.253.52$49,519
Jul 20134800102.523.72$49,210
Jun 2013820094.403.93$77,408
May 2013963094.834.15$91,321
Apr 2013974093.964.28$91,517
Mar 20131,002093.623.91$93,807
Feb 2013168091.233.42$15,327
Jan 2013336091.603.42$30,778
Dec 2012499086.773.42$43,298
Nov 2012326086.953.62$28,346
Oct 20120089.383.40$0
Sep 2012148094.672.92$14,011
Aug 2012153092.662.91$14,177
Jul 2012161085.133.02$13,706
Jun 2012162079.822.52$12,931
May 2012332091.612.49$30,415
Apr 201200101.652.00$0
Mar 20121740105.052.22$18,279
Feb 20123390101.102.57$34,273
Jan 2012158098.092.73$15,498
Dec 2011170096.873.24$16,468
Nov 2011519095.723.31$49,679
Oct 2011334084.983.65$28,383
Sep 2011656083.623.99$54,855
Aug 2011662083.404.15$55,211
Jul 2011991094.144.52$93,293
Jun 20111,986092.904.64$184,499
May 20112,202098.134.40$216,082
Apr 20111,7100105.964.33$181,192
Mar 20111,475096.364.06$142,131
Feb 2011848085.644.18$72,623
Jan 2011816086.504.59$70,584
Dec 2010157085.734.35$13,460
Nov 20100080.843.80$0
Oct 20100078.103.51$0
Sep 20100072.633.98$0
Aug 20100073.684.42$0
Jul 20100072.554.74$0
Jun 20100070.364.91$0
May 20100071.124.24$0
Apr 20100081.694.12$0
Mar 20100078.394.39$0
Feb 20100073.585.44$0
Jan 20100074.365.96$0
Dec 20090071.445.48$0
Nov 200930074.593.75$2,238
Oct 20090072.544.11$0
Sep 200931065.543.06$2,032
Aug 200951067.423.22$3,438
Jul 200995061.133.46$5,807
Jun 200958066.163.90$3,837
May 2009237054.743.93$12,973
Apr 20090046.773.59$0
Mar 20090042.144.06$0
Feb 20090032.814.63$0
Jan 20090035.865.37$0
Dec 20080037.105.98$0
Nov 20080055.496.86$0
Oct 20080075.246.92$0
Sep 200800101.767.88$0
Aug 200800114.228.48$0
Jul 200800131.0811.39$0
Jun 200800131.3313.03$0
May 200800123.1711.57$0
Apr 200800110.3110.45$0
Mar 200800101.909.66$0
Feb 20080092.538.77$0
Jan 20080090.388.21$0
Dec 20070088.337.30$0
Nov 20070091.677.29$0
Oct 20070082.856.92$0
Sep 20070075.846.24$0
Aug 20070069.066.39$0
Jul 20070070.906.39$0
Jun 20070062.007.55$0
May 20070058.747.85$0
Apr 20070059.617.81$0
Mar 20070056.927.30$0
Feb 20070055.108.22$0
Jan 20070050.306.73$0
Dec 20060056.656.92$0
Nov 20060054.207.62$0
Oct 20060054.906.01$0
Sep 20060060.085.04$0
Aug 200614068.717.34$962
Jul 20060069.376.34$0
Jun 20060066.286.38$0
May 200623066.016.42$1,518
Apr 200632064.397.36$2,060
Mar 20060056.707.08$0
Feb 20060057.597.75$0
Jan 2006123060.598.93$7,453
Dec 20050054.9413.42$0
Nov 20050054.6910.59$0
Oct 20050058.3413.80$0
Sep 20050061.4512.08$0
Aug 20050061.519.80$0
Jul 20050055.697.84$0
Jun 20050052.337.38$0
May 20050045.226.65$0
Apr 20050049.207.36$0
Mar 20050050.377.15$0
Feb 20050045.226.31$0
Jan 20050043.166.32$0
Dec 20040039.866.75$0
Nov 20040045.286.33$0
Oct 20040049.706.52$0
Sep 20040043.245.28$0
Aug 20040042.375.55$0
Jul 20040038.286.08$0
Jun 20040036.106.43$0
May 20040037.486.49$0
Apr 20040034.475.86$0
Mar 20040034.365.53$0
Feb 20040032.455.51$0
Jan 20040032.036.30$0
Dec 20030030.266.30$0
Nov 20030028.804.60$0
Oct 20030028.174.76$0
Sep 20030026.314.75$0
Aug 20030029.765.13$0
Jul 20030029.415.17$0
Jun 20030028.565.98$0
May 20030026.595.97$0
Apr 20030026.675.41$0
Mar 20030031.146.10$0
Feb 20030033.487.93$0
Jan 20030030.315.58$0
Dec 20020026.914.85$0
Nov 20020024.664.14$0
Oct 20020026.464.23$0
Sep 20020027.443.64$0
Aug 20020025.963.16$0
Jul 20020024.583.06$0
Jun 20020023.733.34$0
May 2002118024.663.58$2,910
Apr 20020023.653.51$0
Mar 20020022.003.10$0
Feb 20020018.222.38$0
Jan 20020017.172.38$0
Dec 20010116.932.36$2
Nov 20010018.072.41$0
Oct 20010019.782.53$0
Sep 20010024.262.25$0
Aug 20010024.873.05$0
Jul 20010023.933.20$0
Jun 20010024.563.82$0
May 20010025.524.31$0
Apr 20010024.685.34$0
Mar 20010024.545.38$0
Feb 20010027.755.77$0
Jan 20010027.478.40$0
Dec 20000026.889.12$0
Nov 20000032.215.66$0
Oct 20000031.235.15$0
Sep 20000031.875.19$0
Aug 20000029.644.54$0
Jul 20000028.534.09$0
Jun 20000029.304.40$0
May 20000027.263.68$0
Apr 20000024.513.12$0
Mar 20000028.422.86$0
Feb 20000027.622.73$0
Jan 20000025.272.48$0
Dec 19990024.282.42$0
Nov 19990023.192.43$0
Oct 19990020.982.80$0
Sep 19990021.752.62$0
Aug 19990019.262.88$0
Jul 19990017.892.37$0
Jun 19990015.942.36$0
May 19990015.792.32$0
Apr 19990015.102.21$0
Mar 19990012.471.84$0
Feb 1999009.981.82$0
Jan 19990010.381.90$0
Dec 1998009.201.77$0
Nov 19980010.892.19$0
Oct 19980012.421.97$0
Sep 19980012.592.08$0
Aug 19980011.301.91$0
Jul 19980011.742.24$0
Jun 19980011.242.24$0
May 19980012.622.21$0
Apr 19980013.042.51$0
Mar 19980012.802.31$0
Feb 19980013.952.30$0
Jan 19980014.702.15$0
Dec 19970016.322.41$0
Nov 19970018.193.09$0
Oct 19970019.253.15$0
Sep 19970017.742.95$0
Aug 19970017.862.55$0
Jul 19970017.582.25$0
Jun 19970017.242.26$0
May 19970018.972.31$0
Apr 19970017.882.08$0
Mar 19970018.951.94$0
Feb 19970020.492.21$0
Jan 19970023.483.54$0
Dec 19960023.32$0
Nov 19960021.97$0
Oct 19960023.31$0
Sep 19960022.22$0
Aug 19960020.26$0
Jul 19960019.55$0
Jun 19960018.73$0
May 19960019.43$0
Apr 19960021.51$0
Mar 19960019.38$0
Feb 19960016.98$0
Jan 19960017.07$0
Dec 19950017.19$0
Nov 19950016.00$0
Oct 19950015.43$0
Sep 19950016.18$0
Aug 19950015.92$0
Jul 19950015.24$0
Jun 19950016.41$0
May 19950017.56$0
Apr 19950017.73$0
Mar 19950016.44$0
Feb 19950016.58$0
Jan 19950015.92$0
Dec 19940015.03$0
Nov 19940015.90$0
Oct 19940015.58$0
Sep 19940015.29$0
Aug 19940016.13$0
Jul 19940017.56$0
Jun 19940017.09$0
May 19940015.88$0
Apr 19940114.14$0
Mar 19940112.46$0
Feb 19940112.50$0
Jan 19940112.66$0
Dec 19930112.33$0
Nov 19930114.49$0
Oct 19930115.85$0
Sep 19930115.03$0
Aug 19930115.66$0
Jul 19930115.46$0
Jun 19930116.79$0
May 19930117.68$0
Apr 19930018.05$0
Mar 19930018.14$0
Feb 19930017.90$0
Jan 19930016.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jul 2023 — as filed, then multipliedworked
Oil                   35 bbl  × $ 74.85 =     $2,620
Casinghead gas         0 Mcf  × $  2.64 =         $0

────────────────────────────────────────────────────
Month total                                   $2,620

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 03/O/21225 is the state's own key, not one this site invented.