LAWRENCE

Operated by AMES OIL CORPORATION OF TEXAS (P-5 19788) in the GIDDINGS (AUSTIN CHALK-3) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 21489District 03Field 34733500OilCasinghead gasSaveExport
Value, all time
$415 k
Jan 1993 – Mar 2008
Value, last 12 filed months
$0
at the published price for each month
Months reported
183
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 5,900 leases and 6,985 wells, and the rule below applies to all of them.

Discovered
1960-10-29
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 80 acres. The field rule took effect on 2025-09-30.

The Commission's schedule remark for this field reads: DKT OG-25-00028011: UFT FIELD, ALLOCATION FORMULA SUSPENDED

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition21,508 bbl$379,541
Casinghead gasProduction62,719 Mcf$35,827
Total$415,368

49,561 Mcf of this lease's gas, across 46 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.6602, -96.4285. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.66021, -96.42852 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
8,146 ft
1 wells filed one
Completion to plug
11.7 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 8,146 ft.

Completions filed
May 2001
1 of 1 wells
Plug dates filed
Jan 2013
1 of 1 wells

Last completion to plug: a median of 11.7 years across the 1 well that filed both dates, with the middle half between 11.7 years and 11.7 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-0413159118,146 ftMay 2001Jan 2013Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (183)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

183 months

Mar 200800101.909.66$0
Feb 20080092.538.77$0
Jan 20080090.388.21$0
Dec 20070088.337.30$0
Nov 20070091.677.29$0
Oct 20070082.856.92$0
Sep 20070075.846.24$0
Aug 20070069.066.39$0
Jul 20070070.906.39$0
Jun 20070062.007.55$0
May 20070058.747.85$0
Apr 20070059.617.81$0
Mar 20070056.927.30$0
Feb 20070055.108.22$0
Jan 20070050.306.73$0
Dec 20060056.656.92$0
Nov 20060054.207.62$0
Oct 20060054.906.01$0
Sep 20060060.085.04$0
Aug 20060068.717.34$0
Jul 20060069.376.34$0
Jun 20060066.286.38$0
May 20060066.016.42$0
Apr 20060064.397.36$0
Mar 20060056.707.08$0
Feb 20060057.597.75$0
Jan 20060060.598.93$0
Dec 20050054.9413.42$0
Nov 20050054.6910.59$0
Oct 20050058.3413.80$0
Sep 20050061.4512.08$0
Aug 20050061.519.80$0
Jul 20050055.697.84$0
Jun 20050052.337.38$0
May 20050045.226.65$0
Apr 20050049.207.36$0
Mar 20050050.377.15$0
Feb 20050045.226.31$0
Jan 20050043.166.32$0
Dec 20040039.866.75$0
Nov 20040045.286.33$0
Oct 20040049.706.52$0
Sep 20040043.245.28$0
Aug 20040042.375.55$0
Jul 20040038.286.08$0
Jun 20040036.106.43$0
May 20040037.486.49$0
Apr 20040034.475.86$0
Mar 20040034.365.53$0
Feb 20040032.455.51$0
Jan 20040032.036.30$0
Dec 20030030.266.30$0
Nov 20030028.804.60$0
Oct 20030028.174.76$0
Sep 20030026.314.75$0
Aug 20030029.765.13$0
Jul 20030029.415.17$0
Jun 20030028.565.98$0
May 20030026.595.97$0
Apr 20030026.675.41$0
Mar 20030031.146.10$0
Feb 20030033.487.93$0
Jan 20030030.315.58$0
Dec 20020026.914.85$0
Nov 20020024.664.14$0
Oct 20020026.464.23$0
Sep 20020027.443.64$0
Aug 20020025.963.16$0
Jul 20020024.583.06$0
Jun 20020023.733.34$0
May 20020024.663.58$0
Apr 20020023.653.51$0
Mar 20020022.003.10$0
Feb 20020018.222.38$0
Jan 20020017.172.38$0
Dec 20010016.932.36$0
Nov 20010018.072.41$0
Oct 20010019.782.53$0
Sep 20010024.262.25$0
Aug 20010024.873.05$0
Jul 20010023.933.20$0
Jun 20010024.563.82$0
May 20010025.524.31$0
Apr 200125024.685.34$617
Mar 2001276024.545.38$6,773
Feb 20015027.755.77$139
Jan 200117511727.478.40$5,790
Dec 20000026.889.12$0
Nov 200001532.215.66$85
Oct 200016816631.235.15$6,101
Sep 2000018631.875.19$965
Aug 200036060329.644.54$13,408
Jul 200001528.534.09$61
Jun 2000016929.304.40$743
May 200031541227.263.68$10,103
Apr 2000012624.513.12$393
Mar 200015828728.422.86$5,311
Feb 200036361827.622.73$11,711
Jan 200019425325.272.48$5,530
Dec 199924047024.282.42$6,966
Nov 199919232823.192.43$5,251
Oct 1999011620.982.80$325
Sep 1999019021.752.62$498
Aug 199917428019.262.88$4,156
Jul 199919038917.892.37$4,322
Jun 199918224215.942.36$3,473
May 199918920515.792.32$3,460
Apr 1999015115.102.21$333
Mar 199906112.471.84$112
Feb 19991781609.981.82$2,067
Jan 1999016910.381.90$321
Dec 1998144709.201.77$1,449
Nov 1998025010.892.19$546
Oct 199818029512.421.97$2,817
Sep 1998027112.592.08$564
Aug 199817036211.301.91$2,611
Jul 199817935911.742.24$2,905
Jun 1998227211.242.24$631
May 199815940212.622.21$2,894
Apr 199818221713.042.51$2,917
Mar 199818633912.802.31$3,164
Feb 1998537413.952.30$930
Jan 199818228314.702.15$3,285
Dec 199717528216.322.41$3,536
Nov 199718529418.193.09$4,273
Oct 199733536019.253.15$7,583
Sep 1997028117.742.95$830
Aug 1997232317.862.55$861
Jul 199718240017.582.25$4,098
Jun 199715934817.242.26$3,527
May 199717841318.972.31$4,330
Apr 1997023817.882.08$496
Mar 199717923818.951.94$3,854
Feb 199717137320.492.21$4,327
Jan 1997138623.483.54$1,390
Dec 199617142923.32$3,988
Nov 199633444321.97$7,338
Oct 1996057723.31$0
Sep 199617632522.22$3,911
Aug 199617039920.26$3,444
Jul 199616946719.55$3,304
Jun 1996168018.73$3,147
May 199635734619.43$6,937
Apr 1996357021.51$7,679
Mar 1996726019.38$136
Feb 199618131116.98$3,073
Jan 199636238117.07$6,179
Dec 1995475917.19$69
Nov 199535397016.00$5,648
Oct 1995294815.43$31
Sep 199535283816.18$5,695
Aug 1995084415.92$0
Jul 199517769615.24$2,697
Jun 199554086516.41$8,861
May 199501,05717.56$0
Apr 199518881617.73$3,333
Mar 199518585016.44$3,041
Feb 199518790316.58$3,100
Jan 19955431,01015.92$8,645
Dec 19941811,46615.03$2,720
Nov 199435133015.90$5,581
Oct 1994290615.58$31
Sep 19943531,08615.29$5,397
Aug 19941801,24316.13$2,903
Jul 19943571,48317.56$6,269
Jun 19943491,56817.09$5,964
May 199435697715.88$5,653
Apr 199436796214.14$5,189
Mar 199436420812.46$4,535
Feb 199436491212.50$4,550
Jan 19943631,46712.66$4,596
Dec 19933411,72612.33$4,205
Nov 19933581,38014.49$5,187
Oct 19937131,74115.85$11,301
Sep 19937131,81115.03$10,716
Aug 19933521,66215.66$5,512
Jul 19933571,22615.46$5,519
Jun 19933581,95016.79$6,011
May 19935352,19517.68$9,459
Apr 19937192,15418.05$12,978
Mar 19937172,28818.14$13,006
Feb 19937221,92617.90$12,924
Jan 19937132,40016.93$12,071

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Apr 2001 — as filed, then multipliedworked
Oil                   25 bbl  × $ 24.68 =       $617
Casinghead gas         0 Mcf  × $  5.34 =         $0

────────────────────────────────────────────────────
Month total                                     $617

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well