BUSH-STETZ UNIT

Operated by UNION PACIFIC RESOURCES COMPANY (P-5 876645) in the GIDDINGS (AUSTIN CHALK-3) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 21694District 03Field 34733500OilCasinghead gasSaveExport
Value, all time
$437 k
Jan 1993 – Jun 2000
Value, last 12 filed months
$16 k
at the published price for each month
Months reported
90
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 5,900 leases and 6,985 wells, and the rule below applies to all of them.

Discovered
1960-10-29
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 80 acres. The field rule took effect on 2025-09-30.

The Commission's schedule remark for this field reads: DKT OG-25-00028011: UFT FIELD, ALLOCATION FORMULA SUSPENDED

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition23,986 bbl$395,951
Casinghead gasProduction206,480 Mcf$40,702
Total$436,653

189,124 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.5999, -96.4376. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.59991, -96.43759 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
9,164 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 9,164 ft.

Completions filed
Mar 2000
1 of 1 wells

1 well

42-0413160119,164 ftMar 2000Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (90)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

90 months

Jun 20000029.304.40$0
May 20000027.263.68$0
Apr 20000024.513.12$0
Mar 200084028.422.86$2,387
Feb 2000281027.622.73$7,761
Jan 20000025.272.48$0
Dec 19990724.282.42$17
Nov 199901823.192.43$44
Oct 199902320.982.80$64
Sep 1999010421.752.62$272
Aug 199918114519.262.88$3,903
Jul 1999058717.892.37$1,393
Jun 1999021415.942.36$505
May 1999022615.792.32$525
Apr 199902,03515.102.21$4,493
Mar 19991821,12212.471.84$4,332
Feb 199906559.981.82$1,191
Jan 199901,13510.381.90$2,156
Dec 19981831,5549.201.77$4,439
Nov 19981610.892.19$24
Oct 19981612.421.97$24
Sep 1998027212.592.08$566
Aug 1998023811.301.91$454
Jul 199817714311.742.24$2,398
Jun 1998024911.242.24$557
May 1998029612.622.21$653
Apr 1998119413.042.51$499
Mar 1998018212.802.31$420
Feb 199818324913.952.30$3,125
Jan 1998037314.702.15$804
Dec 1997039916.322.41$962
Nov 1997025518.193.09$788
Oct 199717886719.253.15$6,157
Sep 199701,25617.742.95$3,711
Aug 1997065117.862.55$1,663
Jul 199718078617.582.25$4,930
Jun 199703717.242.26$84
May 199714318.972.31$118
Apr 1997064817.882.08$1,350
Mar 1997051818.951.94$1,004
Feb 1997060320.492.21$1,330
Jan 19971841,26023.483.54$8,780
Dec 19963531,32923.32$8,232
Nov 199602,34821.97$0
Oct 19961623.31$23
Sep 199601,34222.22$0
Aug 19961792,51120.26$3,627
Jul 19961772,79119.55$3,460
Jun 199602,29218.73$0
May 19961802,59419.43$3,497
Apr 19961772,89121.51$3,807
Mar 19961833,37519.38$3,547
Feb 19961842,74416.98$3,124
Jan 19961833,15717.07$3,124
Dec 19953623,34017.19$6,223
Nov 199503,40416.00$0
Oct 19953643,95515.43$5,617
Sep 19951772,92416.18$2,864
Aug 19953563,81215.92$5,668
Jul 199501,15515.24$0
Jun 19953552,55316.41$5,826
May 19951823,34517.56$3,196
Apr 19951822,12617.73$3,227
Mar 19953573,04416.44$5,869
Feb 19951772,85916.58$2,935
Jan 19953641,87615.92$5,795
Dec 19943593,75415.03$5,396
Nov 19943583,69515.90$5,692
Oct 199435433615.58$5,515
Sep 199401,57215.29$0
Aug 19943533,70416.13$5,694
Jul 19943263,80817.56$5,725
Jun 19943534,04217.09$6,033
May 19943504,43115.88$5,558
Apr 19946995,72714.14$9,884
Mar 19943596,43612.46$4,473
Feb 19945467,57512.50$6,825
Jan 19949108,27912.66$11,521
Dec 19938859,23612.33$10,912
Nov 19937095,31514.49$10,273
Oct 199371510,91315.85$11,333
Sep 19931,07310,05115.03$16,127
Aug 19931791,45015.66$2,803
Jul 19938823,15015.46$13,636
Jun 19938994,21916.79$15,094
May 19939087,24217.68$16,053
Apr 19931,3167,41918.05$23,754
Mar 19932,0885,74618.14$37,876
Feb 19931,2463,86517.90$22,303
Jan 19931,8095,38616.93$30,626

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Mar 2000 — as filed, then multipliedworked
Oil                   84 bbl  × $ 28.42 =     $2,387
Casinghead gas         0 Mcf  × $  2.86 =         $0

────────────────────────────────────────────────────
Month total                                   $2,387

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 03/O/21694 is the state's own key, not one this site invented.