SURMAN

Operated by SELLERS LEASE SERVICE, INC. (P-5 766125) in the P. HOMANN (CARRIZO WILCOX F) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 23429District 03Field 68106474OilSaveExport
Value, all time
$156 k
Mar 1996 – Mar 2013
Value, last 12 filed months
$6 k
at the published price for each month
Months reported
205
no gaps in the span
Streams
1
oil

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 1 leases and 1 wells, and the rule below applies to all of them.

Discovered
1995-03-17
as the register files it
Field class
Oil
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition2,645 bbl$155,643
Total$155,643

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 29.8091, -97.2297. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

29.80908, -97.22965 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
1,355 ft
1 wells filed one
Completion to plug
17.8 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 1,355 ft.

Completions filed
Mar 1995
1 of 1 wells
Plug dates filed
Dec 2012
1 of 1 wells

Last completion to plug: a median of 17.8 years across the 1 well that filed both dates, with the middle half between 17.8 years and 17.8 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-1493296041,355 ftMar 1995Dec 2012Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (205)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

205 months

Mar 2013093.623.91$0
Feb 2013091.233.42$0
Jan 2013091.603.42$0
Dec 2012086.773.42$0
Nov 2012086.953.62$0
Oct 2012089.383.40$0
Sep 20122394.672.92$2,177
Aug 2012092.662.91$0
Jul 20122985.133.02$2,469
Jun 2012079.822.52$0
May 2012091.612.49$0
Apr 201214101.652.00$1,423
Mar 20120105.052.22$0
Feb 20128101.102.57$809
Jan 2012098.092.73$0
Dec 2011096.873.24$0
Nov 2011995.723.31$861
Oct 2011084.983.65$0
Sep 20111083.623.99$836
Aug 2011083.404.15$0
Jul 2011094.144.52$0
Jun 20113792.904.64$3,437
May 2011098.134.40$0
Apr 20110105.964.33$0
Mar 20111496.364.06$1,349
Feb 2011085.644.18$0
Jan 2011086.504.59$0
Dec 2010085.734.35$0
Nov 2010080.843.80$0
Oct 2010078.103.51$0
Sep 2010072.633.98$0
Aug 2010073.684.42$0
Jul 2010072.554.74$0
Jun 2010070.364.91$0
May 2010071.124.24$0
Apr 2010081.694.12$0
Mar 2010078.394.39$0
Feb 2010073.585.44$0
Jan 2010074.365.96$0
Dec 2009071.445.48$0
Nov 2009074.593.75$0
Oct 2009072.544.11$0
Sep 2009065.543.06$0
Aug 2009067.423.22$0
Jul 20091561.133.46$917
Jun 2009066.163.90$0
May 2009054.743.93$0
Apr 20092846.773.59$1,310
Mar 20093342.144.06$1,391
Feb 20093232.814.63$1,050
Jan 20093235.865.37$1,148
Dec 20083337.105.98$1,224
Nov 20083355.496.86$1,831
Oct 20083075.246.92$2,257
Sep 200832101.767.88$3,256
Aug 200833114.228.48$3,769
Jul 200831131.0811.39$4,063
Jun 200831131.3313.03$4,071
May 200833123.1711.57$4,065
Apr 20080110.3110.45$0
Mar 2008160101.909.66$16,304
Feb 2008092.538.77$0
Jan 2008090.388.21$0
Dec 20073288.337.30$2,827
Nov 20075191.677.29$4,675
Oct 20077082.856.92$5,800
Sep 20075475.846.24$4,095
Aug 2007069.066.39$0
Jul 20072470.906.39$1,702
Jun 20075062.007.55$3,100
May 20075958.747.85$3,466
Apr 2007059.617.81$0
Mar 20074656.927.30$2,618
Feb 20075055.108.22$2,755
Jan 20075650.306.73$2,817
Dec 2006056.656.92$0
Nov 20065154.207.62$2,764
Oct 2006054.906.01$0
Sep 2006060.085.04$0
Aug 200610768.717.34$7,352
Jul 2006069.376.34$0
Jun 20065066.286.38$3,314
May 20063166.016.42$2,046
Apr 20065264.397.36$3,348
Mar 20065156.707.08$2,892
Feb 2006057.597.75$0
Jan 20067760.598.93$4,665
Dec 2005054.9413.42$0
Nov 20055054.6910.59$2,735
Oct 20055658.3413.80$3,267
Sep 20055261.4512.08$3,195
Aug 2005061.519.80$0
Jul 20057055.697.84$3,898
Jun 2005052.337.38$0
May 20056545.226.65$2,939
Apr 20055549.207.36$2,706
Mar 2005050.377.15$0
Feb 20055045.226.31$2,261
Jan 2005043.166.32$0
Dec 2004039.866.75$0
Nov 20043745.286.33$1,675
Oct 2004049.706.52$0
Sep 2004043.245.28$0
Aug 2004042.375.55$0
Jul 2004038.286.08$0
Jun 2004036.106.43$0
May 2004037.486.49$0
Apr 2004034.475.86$0
Mar 20041034.365.53$344
Feb 20042232.455.51$714
Jan 2004032.036.30$0
Dec 2003030.266.30$0
Nov 2003028.804.60$0
Oct 2003028.174.76$0
Sep 2003026.314.75$0
Aug 2003029.765.13$0
Jul 2003029.415.17$0
Jun 20036128.565.98$1,742
May 2003026.595.97$0
Apr 2003026.675.41$0
Mar 2003031.146.10$0
Feb 2003033.487.93$0
Jan 2003030.315.58$0
Dec 2002026.914.85$0
Nov 2002024.664.14$0
Oct 2002026.464.23$0
Sep 2002027.443.64$0
Aug 2002025.963.16$0
Jul 2002024.583.06$0
Jun 20025023.733.34$1,187
May 2002024.663.58$0
Apr 2002023.653.51$0
Mar 2002022.003.10$0
Feb 2002018.222.38$0
Jan 20024217.172.38$721
Dec 2001016.932.36$0
Nov 2001018.072.41$0
Oct 2001019.782.53$0
Sep 2001024.262.25$0
Aug 2001024.873.05$0
Jul 2001023.933.20$0
Jun 20011424.563.82$344
May 2001725.524.31$179
Apr 2001024.685.34$0
Mar 2001024.545.38$0
Feb 2001027.755.77$0
Jan 2001027.478.40$0
Dec 2000026.889.12$0
Nov 2000032.215.66$0
Oct 20003431.235.15$1,062
Sep 2000031.875.19$0
Aug 2000029.644.54$0
Jul 2000028.534.09$0
Jun 2000029.304.40$0
May 20002127.263.68$572
Apr 2000024.513.12$0
Mar 20001028.422.86$284
Feb 20009027.622.73$2,486
Jan 2000025.272.48$0
Dec 19992724.282.42$656
Nov 1999023.192.43$0
Oct 1999020.982.80$0
Sep 1999021.752.62$0
Aug 1999019.262.88$0
Jul 1999017.892.37$0
Jun 1999015.942.36$0
May 1999015.792.32$0
Apr 1999015.102.21$0
Mar 19995512.471.84$686
Feb 199909.981.82$0
Jan 1999010.381.90$0
Dec 199809.201.77$0
Nov 19988010.892.19$871
Oct 1998012.421.97$0
Sep 1998012.592.08$0
Aug 19986211.301.91$701
Jul 19981411.742.24$164
Jun 1998011.242.24$0
May 1998012.622.21$0
Apr 1998013.042.51$0
Mar 1998012.802.31$0
Feb 1998013.952.30$0
Jan 1998014.702.15$0
Dec 1997016.322.41$0
Nov 1997018.193.09$0
Oct 1997019.253.15$0
Sep 1997017.742.95$0
Aug 1997017.862.55$0
Jul 1997017.582.25$0
Jun 1997017.242.26$0
May 1997018.972.31$0
Apr 1997017.882.08$0
Mar 1997018.951.94$0
Feb 1997020.492.21$0
Jan 1997023.483.54$0
Dec 1996023.32$0
Nov 1996021.97$0
Oct 1996023.31$0
Sep 1996022.22$0
Aug 1996020.26$0
Jul 1996019.55$0
Jun 1996018.73$0
May 1996019.43$0
Apr 1996021.51$0
Mar 1996019.38$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Sep 2012 — as filed, then multipliedworked
Oil                   23 bbl  × $ 94.67 =     $2,177

────────────────────────────────────────────────────
Month total                                   $2,177

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 03/O/23429 is the state's own key, not one this site invented.