DAVIS

Operated by HAMMAN OIL & REFINING COMPANY (P-5 350200) in the BIG CREEK field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 25250District 03Field 07808001OilCasinghead gasSave
Value, all time
$26.2 M
Feb 2008 – Nov 2024
Value, last 12 filed months
$8 k
at the published price for each month
Months reported
202
no gaps in the span
Streams
2
oil, casinghead gas

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition332,429 bbl$25,629,849
Casinghead gasProduction137,112 Mcf$522,379
Total$26,152,228

Wells on this lease (12)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 29.4793, -95.7437. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.2 miles.

29.47929, -95.74381 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
12 of 12 wells
With a plug date
91.7%
11 of 12 wells
Median depth
4,821 ft
12 wells filed one
Completion to plug
14.5 years
median over 11 wells

What the state filed about each well

On the RRC proration schedule
12100.0%
A plug date is filed
1191.7%
BothOn the schedule and plugged. Neither fact cancels the other.
1191.7%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

0k
2k
4k
6k
8k
10k
12k
15k
20k+

Total depth in feet, 12 of 12 wells. Median 4,821 ft, with the middle half between 4,753 and 4,842 ft; the shallowest is 4,669 ft and the deepest 4,919 ft. The median is published rather than the mean, because a single mis-keyed depth moves a mean and cannot move a median.

When they were last completed

00s
10s

Last completion by decade, 12 of 12 wells, Jan 2008 – May 2012. This is the LAST completion filed on each wellbore, not the first — a well recompleted in 2019 counts once, in the 2010s.

Completions filed
Jan 2008 – May 2012
12 of 12 wells
Plug dates filed
Sep 2009 – Oct 2024
11 of 12 wells; 1 filed none

Last completion to plug: a median of 14.5 years across the 11 wells that filed both dates, with the middle half between 12.2 years and 15.5 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

12 wells

42-157328062904,748 ftMay 2012May 2024Yes
42-157327972894,887 ftApr 2012Aug 2012Yes
42-157327962884,754 ftJan 2012May 2024Yes
42-157327382834,775 ftOct 2011Yes
42-157327392844,821 ftOct 2011Aug 2024Yes
42-157325682654,825 ftFeb 2010Aug 2024Yes
42-157325772734,834 ftSep 2009Sep 2024Yes
42-157325712704,820 ftAug 2009Sep 2009Yes
42-157325662674,919 ftMay 2009Oct 2024Yes
42-157325582624,865 ftApr 2009Oct 2024Yes
42-157325352604,669 ftNov 2008Sep 2024Yes
42-157324822494,720 ftJan 2008Jul 2024Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (202)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

202 months

Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 202496078.812.20$7,566
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 202317089.042.74$1,514
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 202219094.529.13$1,796
Jul 202200101.587.54$0
Jun 2022330115.097.98$3,798
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 2022210108.885.08$2,286
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20218079.795.71$638
Sep 202131069.865.35$2,166
Aug 20210066.024.22$0
Jul 202157070.783.98$4,034
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 202158061.302.72$3,555
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 202056044.642.68$2,500
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 202036039.982.39$1,439
Jul 202037038.371.83$1,420
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 202050014.751.80$738
Mar 20200030.341.86$0
Feb 2020197749.881.98$9,840
Jan 202001157.252.09$23
Dec 2019219559.012.30$12,935
Nov 2019175555.302.75$9,691
Oct 20190153.472.42$2
Sep 2019158555.052.66$8,711
Aug 20191601853.112.30$8,539
Jul 201902156.272.46$52
Jun 2019162552.782.49$8,563
May 20190558.482.74$14
Apr 2019160562.632.75$10,035
Mar 201970456.803.06$3,988
Feb 201964250.852.79$3,260
Jan 201902446.033.23$77
Dec 20181514546.594.19$7,223
Nov 20181875852.934.24$10,144
Oct 20181474961.443.40$9,198
Sep 20181624559.543.11$9,785
Aug 20181584659.403.07$9,526
Jul 20181585065.142.93$10,439
Jun 20181696860.183.08$10,380
May 201816115065.382.90$10,961
Apr 201831418263.842.90$20,574
Mar 201847123061.222.79$29,476
Feb 201846916961.782.77$29,442
Jan 20188338362.874.01$52,703
Dec 20171,14724057.272.92$66,390
Nov 20171,18612455.423.12$66,115
Oct 20171,3804049.292.98$68,140
Sep 20178322347.523.09$39,608
Aug 20179363645.373.00$42,574
Jul 20177223043.873.09$31,767
Jun 20177262942.493.09$30,937
May 20178543745.373.26$38,867
Apr 20176773247.933.21$32,551
Mar 20178153146.772.98$38,210
Feb 20176942750.452.95$35,092
Jan 20174832549.413.42$23,951
Dec 20165972048.763.72$29,184
Nov 20163311542.492.64$14,104
Oct 20164251946.193.09$19,689
Sep 20165681941.553.10$23,659
Aug 20165862641.442.92$24,360
Jul 20167292741.622.92$30,420
Jun 20166462745.352.69$29,369
May 20168171142.521.99$34,761
Apr 2016790336.561.99$28,888
Mar 20161,1003533.011.79$36,374
Feb 20161,3551526.472.06$35,898
Jan 20161,74010027.352.36$47,825
Dec 20151,57011632.362.00$51,037
Nov 20151,43217138.792.17$55,918
Oct 20151,41723143.552.43$62,271
Sep 20151,11541142.992.76$49,068
Aug 20151,38243140.162.87$56,739
Jul 20151,41749248.152.95$69,678
Jun 20151,23355056.152.88$70,819
May 20151,61473955.212.96$91,293
Apr 20151,71582749.822.71$87,680
Mar 20151,74886642.892.93$77,513
Feb 20151,71581044.662.98$79,003
Jan 20151,97698643.433.10$88,875
Dec 20141,9961,21954.693.59$113,539
Nov 20143,0292,38770.464.25$223,572
Oct 20142,8871,85878.303.90$233,300
Sep 20143,5672,27586.164.05$316,536
Aug 20143,8421,13889.394.04$348,028
Jul 20143,6751,08996.564.18$359,410
Jun 20143,6901,17098.164.74$367,753
May 20143,4551,28194.734.73$333,347
Apr 20143,8791,47095.944.81$379,221
Mar 20143,9211,50895.895.06$383,610
Feb 20142,45294697.406.19$244,682
Jan 20142,22245690.404.86$203,085
Dec 20132,1541,23991.824.35$203,175
Nov 20132,0742,10288.853.74$192,133
Oct 20132,4422,21497.423.78$246,267
Sep 20131,3952,229104.113.72$153,520
Aug 20131,1371,558104.253.52$124,020
Jul 20131,0931,428102.523.72$117,363
Jun 20139581,61194.403.93$96,772
May 20131,3662,31394.834.15$139,135
Apr 20131,5292,79793.964.28$155,643
Mar 20131,6503,65493.623.91$168,771
Feb 20131,6673,91491.233.42$165,466
Jan 20132,5884,60591.603.42$252,809
Dec 20122,6543,66086.773.42$242,805
Nov 20122,7962,12986.953.62$250,830
Oct 20123,3612,63089.383.40$309,347
Sep 20124,1211,43394.672.92$394,317
Aug 20124,1441,91292.662.91$389,543
Jul 20124,4081,27285.133.02$379,096
Jun 20124,4751,47379.822.52$360,905
May 20124,8591,61891.612.49$449,159
Apr 20122,2601,389101.652.00$232,503
Mar 20122,2802,020105.052.22$244,003
Feb 20121,6771,415101.102.57$173,182
Jan 20123,7432,07298.092.73$372,816
Dec 20114,2342,59696.873.24$418,558
Nov 20114,2421,82495.723.31$412,084
Oct 20112,4921,03684.983.65$215,550
Sep 20112,16978083.623.99$184,481
Aug 20112,7601,10383.404.15$234,761
Jul 20113,2851,12194.144.52$314,314
Jun 20114,2161,70892.904.64$399,591
May 20115,0233,89298.134.40$510,051
Apr 20114,1355,712105.964.33$462,896
Mar 20115,8953,12596.364.06$580,721
Feb 20115,4923,02585.644.18$482,979
Jan 20117,5744,35686.504.59$675,140
Dec 20108,16795885.734.35$704,322
Nov 20107,59490580.843.80$617,334
Oct 20107,71584978.103.51$605,521
Sep 20105,87370172.633.98$429,346
Aug 20105,53163873.684.42$410,344
Jul 20105,57264972.554.74$407,323
Jun 20105,10757670.364.91$362,157
May 20105,72967771.124.24$410,314
Apr 20105,82568581.694.12$478,668
Mar 20106,3091,84878.394.39$502,673
Feb 20105,1671,67573.585.44$389,304
Jan 20105,87188474.365.96$441,840
Dec 20095,54554071.445.48$399,096
Nov 20096,7961,14074.593.75$511,190
Oct 20098,4421,72772.544.11$619,481
Sep 20096,5532,36665.543.06$436,735
Aug 20096,6662,81567.423.22$458,482
Jul 20096,7532,84961.133.46$422,681
Jun 20094,7051,34566.163.90$316,522
May 20095,8792,28154.743.93$330,771
Apr 20092,57569346.773.59$122,919
Mar 20091,37715042.144.06$58,636
Feb 20091,00223532.814.63$33,964
Jan 20092,26238335.865.37$83,172
Dec 20081,59637237.105.98$61,435
Nov 200888049555.496.86$52,227
Oct 2008175075.246.92$13,167
Sep 200800101.767.88$0
Aug 20081670114.228.48$19,075
Jul 20083380131.0811.39$44,305
Jun 20081620131.3313.03$21,275
May 20083440123.1711.57$42,370
Apr 20081620110.3110.45$17,870
Mar 20087080101.909.66$72,145
Feb 2008185092.538.77$17,118

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2024 — as filed, then multipliedworked
Oil                   96 bbl  × $ 78.81 =     $7,566
Casinghead gas         0 Mcf  × $  2.20 =         $0

────────────────────────────────────────────────────
Month total                                   $7,566

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 03/O/25250 is the state's own key, not one this site invented.