DENVER KARBER

Operated by DENVER ENERGY EXPLORATION,LLC (P-5 216456) in the BROOKSHIRE field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 26185District 03Field 12306001Hydrogen sulphide fieldOilSaveExport
Value, all time
$1.3 M
Sep 2011 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
177
no gaps in the span
Streams
1
oil

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 214 leases and 551 wells, and the rule below applies to all of them.

Discovered
1952-10-18
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
0 ft
minimum

A drilling unit in this field needs at least 0 acres. The field rule took effect on 2004-03-11.

The register flags this field for hydrogen sulphide. That is a poisonous gas that occurs naturally in some formations. The flag is a property of the field as the Commission records it. It is not a measurement taken at this lease, and it is not a statement that gas is escaping anywhere.

The Commission's schedule remark for this field reads: TYPE SALT DOME.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition14,738 bbl$1,326,786
Total$1,326,786

Wells on this lease (3)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 29.7575, -96.0055. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.2 miles.

29.75738, -96.00598 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
3 of 3 wells
With a plug date
100.0%
3 of 3 wells
Median depth
4,285 ft
3 wells filed one
Completion to plug
7.9 years
median over 3 wells

What the state filed about each well

On the RRC proration schedule
3100.0%
A plug date is filed
3100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
3100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

Between 4,038 and 4,484 ft, median 4,285 ft, over the 3 wells that filed a depth.

Completions filed
Jul 2011 – Apr 2012
3 of 3 wells
Plug dates filed
Jan 2020
3 of 3 wells

Last completion to plug: a median of 7.9 years across the 3 wells that filed both dates, with the middle half between 7.8 years and 8.3 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

3 wells

42-4733122424,285 ftApr 2012Jan 2020Yes
42-4733121814,038 ftFeb 2012Jan 2020Yes
42-473312204M4,484 ftJul 2011Jan 2020Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (177)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

177 months

May 20260106.413.05$0
Apr 2026098.932.87$0
Mar 2026089.753.15$0
Feb 2026063.503.75$0
Jan 2026059.138.00$0
Dec 2025056.664.41$0
Nov 2025058.593.93$0
Oct 2025059.383.30$0
Sep 2025062.743.08$0
Aug 2025063.933.01$0
Jul 2025066.743.32$0
Jun 2025066.483.13$0
May 2025060.553.23$0
Apr 2025062.363.54$0
Mar 2025067.704.27$0
Feb 2025070.884.34$0
Jan 2025074.324.28$0
Dec 2024068.993.12$0
Nov 2024069.052.20$0
Oct 2024071.372.28$0
Sep 2024069.612.36$0
Aug 2024075.632.06$0
Jul 2024079.932.15$0
Jun 2024078.082.63$0
May 2024078.812.20$0
Apr 2024084.451.66$0
Mar 2024080.301.55$0
Feb 2024076.091.78$0
Jan 2024073.023.30$0
Dec 2023071.262.61$0
Nov 2023077.892.81$0
Oct 2023085.443.09$0
Sep 2023089.042.74$0
Aug 2023080.522.67$0
Jul 2023074.852.64$0
Jun 2023068.962.26$0
May 2023070.622.23$0
Apr 2023078.122.24$0
Mar 2023072.852.39$0
Feb 2023075.112.47$0
Jan 2023076.533.39$0
Dec 2022076.415.73$0
Nov 2022085.005.65$0
Oct 2022087.185.86$0
Sep 2022084.888.16$0
Aug 2022094.529.13$0
Jul 20220101.587.54$0
Jun 20220115.097.98$0
May 20220109.378.43$0
Apr 20220104.226.84$0
Mar 20220108.885.08$0
Feb 2022091.054.86$0
Jan 2022081.844.54$0
Dec 2021071.323.90$0
Nov 2021077.435.24$0
Oct 2021079.795.71$0
Sep 2021069.865.35$0
Aug 2021066.024.22$0
Jul 2021070.783.98$0
Jun 2021069.493.38$0
May 2021063.483.02$0
Apr 2021060.362.76$0
Mar 2021061.302.72$0
Feb 2021057.805.55$0
Jan 2021050.412.81$0
Dec 2020044.642.68$0
Nov 2020038.772.71$0
Oct 2020036.972.48$0
Sep 2020037.091.99$0
Aug 2020039.982.39$0
Jul 2020038.371.83$0
Jun 2020034.901.69$0
May 2020016.921.81$0
Apr 2020014.751.80$0
Mar 2020030.341.86$0
Feb 2020049.881.98$0
Jan 2020057.252.09$0
Dec 2019059.012.30$0
Nov 2019055.302.75$0
Oct 2019053.472.42$0
Sep 2019055.052.66$0
Aug 2019053.112.30$0
Jul 2019056.272.46$0
Jun 2019052.782.49$0
May 2019058.482.74$0
Apr 2019062.632.75$0
Mar 2019056.803.06$0
Feb 2019050.852.79$0
Jan 2019046.033.23$0
Dec 2018046.594.19$0
Nov 2018052.934.24$0
Oct 2018061.443.40$0
Sep 2018059.543.11$0
Aug 2018059.403.07$0
Jul 2018065.142.93$0
Jun 2018060.183.08$0
May 2018065.382.90$0
Apr 2018063.842.90$0
Mar 2018061.222.79$0
Feb 2018061.782.77$0
Jan 2018062.874.01$0
Dec 2017057.272.92$0
Nov 2017055.423.12$0
Oct 2017049.292.98$0
Sep 2017047.523.09$0
Aug 2017045.373.00$0
Jul 2017043.873.09$0
Jun 2017042.493.09$0
May 2017045.373.26$0
Apr 2017047.933.21$0
Mar 201717646.772.98$8,232
Feb 201716250.452.95$8,173
Jan 201717249.413.42$8,499
Dec 2016048.763.72$0
Nov 2016042.492.64$0
Oct 2016046.193.09$0
Sep 2016041.553.10$0
Aug 2016041.442.92$0
Jul 2016041.622.92$0
Jun 2016045.352.69$0
May 2016042.521.99$0
Apr 2016036.561.99$0
Mar 2016033.011.79$0
Feb 2016026.472.06$0
Jan 2016027.352.36$0
Dec 2015032.362.00$0
Nov 20154238.792.17$1,629
Oct 2015043.552.43$0
Sep 20153742.992.76$1,591
Aug 2015040.162.87$0
Jul 20156048.152.95$2,889
Jun 2015056.152.88$0
May 20156555.212.96$3,589
Apr 2015049.822.71$0
Mar 201519442.892.93$8,321
Feb 201516144.662.98$7,190
Jan 2015043.433.10$0
Dec 2014054.693.59$0
Nov 2014070.464.25$0
Oct 2014078.303.90$0
Sep 20148486.164.05$7,237
Aug 20147889.394.04$6,972
Jul 201413096.564.18$12,553
Jun 2014098.164.74$0
May 20147294.734.73$6,821
Apr 20148595.944.81$8,155
Mar 2014095.895.06$0
Feb 20145797.406.19$5,552
Jan 201411790.404.86$10,577
Dec 2013091.824.35$0
Nov 2013088.853.74$0
Oct 2013097.423.78$0
Sep 2013316104.113.72$32,899
Aug 2013320104.253.52$33,360
Jul 2013469102.523.72$48,082
Jun 201330594.403.93$28,792
May 201360594.834.15$57,372
Apr 201349593.964.28$46,510
Mar 201323093.623.91$21,533
Feb 201322191.233.42$20,162
Jan 201323491.603.42$21,434
Dec 201225386.773.42$21,953
Nov 201229486.953.62$25,563
Oct 201257489.383.40$51,304
Sep 201246594.672.92$44,022
Aug 201235892.662.91$33,172
Jul 201263685.133.02$54,143
Jun 201265179.822.52$51,963
May 201233891.612.49$30,964
Apr 2012342101.652.00$34,764
Mar 2012511105.052.22$53,681
Feb 2012655101.102.57$66,221
Jan 201251598.092.73$50,516
Dec 20111,01996.873.24$98,711
Nov 20111,54495.723.31$147,792
Oct 20111,52784.983.65$129,764
Sep 201116983.623.99$14,132

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Mar 2017 — as filed, then multipliedworked
Oil                  176 bbl  × $ 46.77 =     $8,232

────────────────────────────────────────────────────
Month total                                   $8,232

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 03/O/26185 is the state's own key, not one this site invented.