Operated by TRIVISTA OPERATING LLC (P-5 871169) in the SERBIN (TAYLOR SAND) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 26893District 03Field 82265500OilCasinghead gasSaveExport
Value, all time
$2.5 M
Jul 2014 – May 2026
Value, last 12 filed months
$56 k
at the published price for each month
Months reported
143
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 444 leases and 641 wells, and the rule below applies to all of them.

Discovered
1985-11-19
as the register files it
Field class
Oil and gas
the register's own label
Between wells
660 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2013-08-06.

The Commission's schedule remark for this field reads: 1500 FT DIAGONAL.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition43,834 bbl$2,345,391
Casinghead gasProduction38,209 Mcf$118,504
Total$2,463,895

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.1092, -97.0333. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.10924, -97.03331 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
5,666 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 5,666 ft.

Completions filed
Jul 2014
1 of 1 wells

1 well

42-287326442H5,666 ftJul 2014

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (143)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

143 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20251695456.664.41$9,814
Nov 20251694458.593.93$10,074
Oct 202509259.383.30$304
Sep 20251769262.743.08$11,325
Aug 20250063.933.01$0
Jul 202517511966.743.32$12,074
Jun 202518812666.483.13$12,892
May 2025012860.553.23$414
Apr 202518411662.363.54$11,885
Mar 202518812167.704.27$13,244
Feb 2025117070.884.34$8,293
Jan 2025174974.324.28$12,970
Dec 20241365468.993.12$9,551
Nov 202409469.052.20$207
Oct 202417611771.372.28$12,828
Sep 20241899869.612.36$13,388
Aug 2024012375.632.06$254
Jul 202419113379.932.15$15,552
Jun 202418114778.082.63$14,520
May 2024010978.812.20$240
Apr 20241854384.451.66$15,695
Mar 202413915380.301.55$11,398
Feb 202417813376.091.78$13,781
Jan 202417614173.023.30$13,316
Dec 202318513471.262.61$13,533
Nov 2023014977.892.81$418
Oct 202317618185.443.09$15,596
Sep 202317817889.042.74$16,336
Aug 202319118980.522.67$15,884
Jul 202319416174.852.64$14,946
Jun 2023019168.962.26$431
May 202312917070.622.23$9,489
Apr 20237619178.122.24$6,365
Mar 202318923272.852.39$14,324
Feb 202319111075.112.47$14,617
Jan 202319417276.533.39$15,430
Dec 2022018876.415.73$1,077
Nov 20221929985.005.65$16,879
Oct 202218210987.185.86$16,506
Sep 202218518084.888.16$17,172
Aug 202219420294.529.13$20,181
Jul 2022194209101.587.54$21,283
Jun 20220201115.097.98$1,603
May 2022154205109.378.43$18,572
Apr 2022188199104.226.84$20,954
Mar 202264187108.885.08$7,918
Feb 202219318791.054.86$18,481
Jan 202218619681.844.54$16,112
Dec 202118223871.323.90$13,908
Nov 202135225677.435.24$28,596
Oct 202170079.795.71$5,585
Sep 202124922769.865.35$18,610
Aug 2021025266.024.22$1,064
Jul 202115029170.783.98$11,776
Jun 202125727269.493.38$18,778
May 202118930763.483.02$12,924
Apr 202124717660.362.76$15,394
Mar 202119011061.302.72$11,946
Feb 202118411057.805.55$11,245
Jan 202119114050.412.81$10,022
Dec 202019716444.642.68$9,233
Nov 202016416838.772.71$6,813
Oct 202024818136.972.48$9,617
Sep 202038018137.091.99$14,455
Aug 202026119539.982.39$10,900
Jul 202025719538.371.83$10,217
Jun 202040418734.901.69$14,416
May 202019019816.921.81$3,574
Apr 20207318414.751.80$1,409
Mar 202013515930.341.86$4,391
Feb 202018417349.881.98$9,521
Jan 202034918757.252.09$20,372
Dec 201912519559.012.30$7,826
Nov 201936019455.302.75$20,442
Oct 201919820053.472.42$11,071
Sep 201924218255.052.66$13,806
Aug 201918521553.112.30$10,321
Jul 201918120656.272.46$10,692
Jun 201950521552.782.49$27,190
May 201918012658.482.74$10,872
Apr 201918018562.632.75$11,782
Mar 201935223256.803.06$20,704
Feb 201918120350.852.79$9,771
Jan 201937521846.033.23$17,965
Dec 201818624646.594.19$9,695
Nov 201837527752.934.24$21,022
Oct 201818427561.443.40$12,239
Sep 201817526459.543.11$11,240
Aug 201815127459.403.07$9,810
Jul 201837129165.142.93$25,020
Jun 201818627460.183.08$12,037
May 201836529165.382.90$24,708
Apr 201841227263.842.90$27,091
Mar 201818027061.222.79$11,772
Feb 201839523961.782.77$25,064
Jan 201837425762.874.01$24,544
Dec 201727026357.272.92$16,231
Nov 201722630555.423.12$13,476
Oct 2017028649.292.98$853
Sep 201755129847.523.09$27,104
Aug 20173039045.373.00$2,533
Jul 2017046143.873.09$1,423
Jun 2017037142.493.09$1,145
May 201712937145.373.26$7,063
Apr 201745035047.933.21$22,693
Mar 201755447746.772.98$27,334
Feb 20170050.452.95$0
Jan 201750640549.413.42$26,386
Dec 201633044748.763.72$17,755
Nov 201646245542.492.64$20,834
Oct 201653848446.193.09$26,346
Sep 201636948641.553.10$16,839
Aug 201663550241.442.92$27,782
Jul 201637245941.622.92$16,825
Jun 201655241645.352.69$26,151
May 201654742842.521.99$24,111
Apr 201658247836.561.99$22,230
Mar 201655955433.011.79$19,446
Feb 201657652526.472.06$16,330
Jan 201675558127.352.36$22,023
Dec 201556860632.362.00$19,593
Nov 201566455638.792.17$26,962
Oct 201574770243.552.43$34,235
Sep 201593478342.992.76$42,313
Aug 201574687440.162.87$32,470
Jul 201584571248.152.95$42,784
Jun 201591076256.152.88$53,293
May 20151,1861,01455.212.96$68,476
Apr 20151,3651,11449.822.71$71,019
Mar 20151,3371,18042.892.93$60,807
Feb 20151,6931,33444.662.98$79,580
Jan 20152,0641,23243.433.10$93,460
Dec 20141,93235854.693.59$106,947
Nov 20141,80357270.464.25$129,471
Oct 20140078.303.90$0
Sep 20140086.164.05$0
Aug 20140089.394.04$0
Jul 20140096.564.18$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Dec 2025 — as filed, then multipliedworked
Oil                  169 bbl  × $ 56.66 =     $9,576
Casinghead gas        54 Mcf  × $  4.41 =       $238

────────────────────────────────────────────────────
Month total                                   $9,814

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 03/O/26893 is the state's own key, not one this site invented.