LOPEZ, G. G.

Operated by CHEVRON U. S. A. INC. (P-5 148113) in the ENCINITAS (V-14) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 10267District 04Field 29010676CondensateGasSaveExport
Value, all time
$152 k
Jan 1993 – Oct 2004
Value, last 12 filed months
$0
at the published price for each month
Months reported
142
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 4 leases and 4 wells, and the rule below applies to all of them.

Discovered
1959-09-30
as the register files it
Field class
Gas
the register's own label
Between wells
1,200 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 40 acres.

The Commission's schedule remark for this field reads: FLD RULES ADOPTED 10-11-77; EFF 12-1-77 BY DOCKET #4-67928

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition789 bbl$9,823
GasProduction165,107 Mcf$142,218
Total$152,041

105,291 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 26.8453, -98.2863. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

26.84527, -98.28634 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
9,870 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 9,870 ft.

Completions filed
Oct 2004
1 of 1 wells

1 well

42-0470087419,870 ftOct 2004Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (142)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

142 months

Oct 20040049.706.52$0
Sep 20040043.245.28$0
Aug 20040042.375.55$0
Jul 20040038.286.08$0
Jun 20040036.106.43$0
May 20040037.486.49$0
Apr 20040034.475.86$0
Mar 20040034.365.53$0
Feb 20040032.455.51$0
Jan 20040032.036.30$0
Dec 20030030.266.30$0
Nov 20030028.804.60$0
Oct 20030028.174.76$0
Sep 20030026.314.75$0
Aug 20030029.765.13$0
Jul 20030029.415.17$0
Jun 20030028.565.98$0
May 20030026.595.97$0
Apr 20030026.675.41$0
Mar 20030031.146.10$0
Feb 20030033.487.93$0
Jan 20030030.315.58$0
Dec 20020026.914.85$0
Nov 20020024.664.14$0
Oct 20020026.464.23$0
Sep 20020027.443.64$0
Aug 20020025.963.16$0
Jul 20020024.583.06$0
Jun 20020023.733.34$0
May 20020024.663.58$0
Apr 20020023.653.51$0
Mar 20020022.003.10$0
Feb 20020018.222.38$0
Jan 20020017.172.38$0
Dec 20010016.932.36$0
Nov 20010018.072.41$0
Oct 20010019.782.53$0
Sep 20010024.262.25$0
Aug 20010024.873.05$0
Jul 20010023.933.20$0
Jun 20010024.563.82$0
May 20010025.524.31$0
Apr 20010024.685.34$0
Mar 20010024.545.38$0
Feb 20010027.755.77$0
Jan 20010027.478.40$0
Dec 20000026.889.12$0
Nov 20000932.215.66$51
Oct 200005531.235.15$283
Sep 200005931.875.19$306
Aug 200007029.644.54$318
Jul 2000014728.534.09$601
Jun 200005929.304.40$259
May 2000025227.263.68$927
Apr 2000012424.513.12$386
Mar 2000025128.422.86$718
Feb 2000018427.622.73$502
Jan 2000021125.272.48$523
Dec 1999031624.282.42$766
Nov 199901823.192.43$44
Oct 1999018620.982.80$521
Sep 1999221021.752.62$593
Aug 19992537219.262.88$1,551
Jul 19992827617.892.37$1,156
Jun 19993139015.942.36$1,415
May 19992642315.792.32$1,392
Apr 19995365115.102.21$2,238
Mar 19995020412.471.84$999
Feb 1999415709.981.82$1,445
Jan 19996193210.381.90$2,404
Dec 1998632,0059.201.77$4,135
Nov 1998551,85310.892.19$4,649
Oct 1998552,45012.421.97$5,508
Sep 1998532,32312.592.08$5,505
Aug 1998712,64011.301.91$5,838
Jul 1998463,00711.742.24$7,268
Jun 1998622,20411.242.24$5,628
May 1998372,77112.622.21$6,581
Apr 1998302,09313.042.51$5,635
Mar 199802,90112.802.31$6,700
Feb 199803,15413.952.30$7,251
Jan 199803,47614.702.15$7,490
Dec 199701,91516.322.41$4,617
Nov 199702,46118.193.09$7,600
Oct 199702,84319.253.15$8,955
Sep 199703,47417.742.95$10,265
Aug 199704517.862.55$115
Jul 199701,05917.582.25$2,380
Jun 199702,29017.242.26$5,169
May 199702,10218.972.31$4,852
Apr 199701,58417.882.08$3,299
Mar 199701,65618.951.94$3,211
Feb 199701,90720.492.21$4,207
Jan 199701,63423.483.54$5,784
Dec 199601,86023.32$0
Nov 199601,69221.97$0
Oct 199601,81523.31$0
Sep 199601,16822.22$0
Aug 199602,01220.26$0
Jul 199602,21719.55$0
Jun 199602,17818.73$0
May 199602,59119.43$0
Apr 199602,16821.51$0
Mar 199602,42119.38$0
Feb 199602,32216.98$0
Jan 199603,27217.07$0
Dec 199502,94417.19$0
Nov 199502,67916.00$0
Oct 199502,41215.43$0
Sep 199501,82916.18$0
Aug 199502,24615.92$0
Jul 199502,78515.24$0
Jun 199502,23216.41$0
May 199502,33817.56$0
Apr 199502,96817.73$0
Mar 199502,60316.44$0
Feb 199502,58816.58$0
Jan 199502,86915.92$0
Dec 199402,44215.03$0
Nov 199402,17615.90$0
Oct 199402,16415.58$0
Sep 199401,99115.29$0
Aug 199401,87916.13$0
Jul 199401,27917.56$0
Jun 199401,67617.09$0
May 199401,91815.88$0
Apr 199402,11914.14$0
Mar 199402,20812.46$0
Feb 199401,72312.50$0
Jan 199401,96712.66$0
Dec 199301,76812.33$0
Nov 199302,05814.49$0
Oct 199302,32415.85$0
Sep 199302,08015.03$0
Aug 199302,29215.66$0
Jul 199302,30215.46$0
Jun 199302,30516.79$0
May 199302,21817.68$0
Apr 199302,06718.05$0
Mar 199302,33418.14$0
Feb 199302,03217.90$0
Jan 199301,76016.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Nov 2000 — as filed, then multipliedworked
Condensate             0 bbl  × $ 32.21 =         $0
Gas                    9 Mcf  × $  5.66 =        $51

────────────────────────────────────────────────────
Month total                                      $51

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 04/G/10267 is the state's own key, not one this site invented.