Operated by APACHE CORPORATION (P-5 27200) in the STRATTON (CONSOLIDATED) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 110910District 04Field 86508170GasSaveExport
Value, all time
$1.3 M
Jan 1993 – Nov 2004
Value, last 12 filed months
$68 k
at the published price for each month
Months reported
143
no gaps in the span
Streams
1
gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 856 leases and 917 wells, and the rule below applies to all of them.

Discovered
1990-07-01
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2000-01-11.

The Commission's schedule remark for this field reads: WITH A DIAG. OF 1500 FEET.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
GasProduction845,752 Mcf$1,252,495
Total$1,252,495

479,934 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 27.6044, -97.9131. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

27.60439, -97.91313 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
10,890 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 10,890 ft.

Completions filed
Nov 2004
1 of 1 wells

1 well

42-2733052212710,890 ftNov 2004Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (143)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

143 months

Nov 2004045.286.33$0
Oct 200458249.706.52$3,792
Sep 2004243.245.28$11
Aug 2004342.375.55$17
Jul 200447738.286.08$2,902
Jun 200477236.106.43$4,966
May 200425137.486.49$1,630
Apr 20041,13234.475.86$6,632
Mar 200460234.365.53$3,329
Feb 20041,17332.455.51$6,463
Jan 20042,81532.036.30$17,733
Dec 20033,26630.266.30$20,581
Nov 20033,21528.804.60$14,773
Oct 20033,10228.174.76$14,764
Sep 20033,75526.314.75$17,834
Aug 20034,04629.765.13$20,755
Jul 20033,80129.415.17$19,654
Jun 20033,65328.565.98$21,856
May 20033,45226.595.97$20,618
Apr 20033,88826.675.41$21,024
Mar 20034,57331.146.10$27,877
Feb 20034,08333.487.93$32,361
Jan 20033,47730.315.58$19,409
Dec 20023,70726.914.85$17,993
Nov 20023,63624.664.14$15,042
Oct 20023,50426.464.23$14,819
Sep 20023,68727.443.64$13,403
Aug 20024,03225.963.16$12,758
Jul 20024,08024.583.06$12,492
Jun 20023,88723.733.34$12,976
May 20024,20824.663.58$15,081
Apr 20024,35423.653.51$15,293
Mar 20024,27222.003.10$13,255
Feb 20024,12118.222.38$9,790
Jan 20024,69217.172.38$11,147
Dec 20014,84816.932.36$11,463
Nov 20013,95518.072.41$9,514
Oct 20014,66519.782.53$11,797
Sep 20014,44624.262.25$10,009
Aug 20014,19224.873.05$12,799
Jul 20014,08323.933.20$13,054
Jun 20014,41124.563.82$16,868
May 20013,48525.524.31$15,011
Apr 20014,07224.685.34$21,725
Mar 20014,17324.545.38$22,436
Feb 20013,78427.755.77$21,823
Jan 20013,37227.478.40$28,321
Dec 20003,61526.889.12$32,978
Nov 200024732.215.66$1,398
Oct 20003,01231.235.15$15,498
Sep 20003,50431.875.19$18,174
Aug 20004,34729.644.54$19,739
Jul 20004,66128.534.09$19,062
Jun 20004,59829.304.40$20,219
May 20004,98927.263.68$18,358
Apr 20004,81724.513.12$15,010
Mar 20005,33528.422.86$15,257
Feb 20005,07927.622.73$13,848
Jan 20004,19925.272.48$10,416
Dec 19995,61424.282.42$13,607
Nov 19996,01723.192.43$14,645
Oct 19996,11420.982.80$17,142
Sep 19991,88821.752.62$4,944
Aug 19991,07319.262.88$3,086
Jul 19997217.892.37$171
Jun 19991,96415.942.36$4,639
May 19992,40615.792.32$5,584
Apr 19992,29815.102.21$5,074
Mar 19993,91812.471.84$7,203
Feb 19995,4589.981.82$9,922
Jan 19996,47910.381.90$12,310
Dec 19986,6349.201.77$11,764
Nov 19983,87910.892.19$8,478
Oct 19984,18012.421.97$8,231
Sep 19983,79812.592.08$7,910
Aug 19983,51311.301.91$6,701
Jul 19983,17211.742.24$7,097
Jun 19984,22211.242.24$9,446
May 19983,33812.622.21$7,365
Apr 19982,90413.042.51$7,275
Mar 19984,85012.802.31$11,201
Feb 19984,43713.952.30$10,201
Jan 19985,72614.702.15$12,338
Dec 19976,01116.322.41$14,493
Nov 19976,02618.193.09$18,610
Oct 19975,64719.253.15$17,787
Sep 19974,91517.742.95$14,523
Aug 19976,16717.862.55$15,755
Jul 19976,25417.582.25$14,052
Jun 19976,09017.242.26$13,746
May 19976,89218.972.31$15,910
Apr 19975,86617.882.08$12,218
Mar 19976,40918.951.94$12,428
Feb 19976,44020.492.21$14,206
Jan 19976,95823.483.54$24,629
Dec 19967,54623.32$0
Nov 19967,22921.97$0
Oct 19968,15923.31$0
Sep 19967,90922.22$0
Aug 19967,06620.26$0
Jul 19965,94819.55$0
Jun 19964,76218.73$0
May 19967,65919.43$0
Apr 19967,42621.51$0
Mar 19967,28219.38$0
Feb 19966,08516.98$0
Jan 19966,78817.07$0
Dec 19957,89517.19$0
Nov 19957,24116.00$0
Oct 19956,86815.43$0
Sep 19957,40516.18$0
Aug 19956,37515.92$0
Jul 19956,28115.24$0
Jun 19957,20816.41$0
May 19956,11517.56$0
Apr 19957,11717.73$0
Mar 19956,16916.44$0
Feb 19957,65516.58$0
Jan 199510,37615.92$0
Dec 19947,41415.03$0
Nov 19947,20515.90$0
Oct 19949,68215.58$0
Sep 19947,28915.29$0
Aug 19949,72616.13$0
Jul 199410,80317.56$0
Jun 19949,85217.09$0
May 19947,96215.88$0
Apr 199411,76514.14$0
Mar 199412,36012.46$0
Feb 199411,42512.50$0
Jan 199412,66212.66$0
Dec 199313,57912.33$0
Nov 199313,19614.49$0
Oct 199314,17015.85$0
Sep 199315,08315.03$0
Aug 199314,25015.66$0
Jul 199315,76315.46$0
Jun 199316,30016.79$0
May 199317,44917.68$0
Apr 199317,42518.05$0
Mar 199317,60818.14$0
Feb 199316,51717.90$0
Jan 199319,88516.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Oct 2004 — as filed, then multipliedworked
Gas                  582 Mcf  × $  6.52 =     $3,792

────────────────────────────────────────────────────
Month total                                   $3,792

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 04/G/110910 is the state's own key, not one this site invented.